Business Central AL Event Subscriber Code Generator
Business Central customization is done with extensions that react to events instead of editing base code. This generator writes the subscriber codeunit and the EventSubscriber attribute so you do not have to remember the syntax.
Fill in
An ID in your extension range from app.json
Copy the parameter list from the publisher so signatures match exactly
AL codeunit
codeunit 50100 "NTR Sales Post Subscribers"
{
Access = Internal;
[EventSubscriber(ObjectType::Codeunit, Codeunit::"Sales-Post", 'OnBeforePostSalesDoc', '', false, false)]
local procedure CheckBeforePostSalesDoc(var SalesHeader: Record "Sales Header"; CommitIsSuppressed: Boolean; PreviewMode: Boolean; var HideProgressWindow: Boolean; var IsHandled: Boolean)
begin
// Add your logic here. Keep it small and avoid user dialogs in posting events.
end;
}Publisher names with spaces or hyphens must be quoted, as shown. Check the event signature in the publisher source (the Base Application is public on GitHub) because parameter names, order and var keywords must match. The last two boolean arguments are SkipOnMissingLicense and SkipOnMissingPermission, confirm against current AL documentation for your runtime version.
Extension design second opinion
Optionally ask for a short review of your event design before you build.
Optional. The tool and every export work without this. No spam.
How to use the generator
Fill in the object type and name of the publisher, the event name and the parameter list. Paste the parameter list from the publisher so the signature matches exactly. Copy the output into a new .al file in your extension, adjust the object ID to your range and add your logic inside begin and end. Build the extension with the AL Language extension for Visual Studio Code.
- Find events by searching the Base Application source or the Event Recorder page
- Keep the subscriber codeunit name unique with your prefix
- Use a separate procedure per event for readability
Anatomy of the attribute
The EventSubscriber attribute takes the object type, the object, the event name, an element name used for field level events, and two Boolean values that control skipping when the license or permission is missing. For business events the element name is an empty string. For table events such as OnAfterValidateEvent, the element name is the field name. The procedure that follows must be local or global but not require parameters other than those published.
Good practice for subscribers
Subscribers run inside the posting transaction, so an error rolls back the document. Do not open dialogs, send mail or call slow web services inside posting events. Respect the IsHandled pattern: if the publisher offers IsHandled, check it first and set it only when you fully take over the logic. Wrap new behavior in a setup flag so it can be turned off without redeployment.
Common mistakes
Signature mismatches produce a compile error, so copy parameters exactly including var. Another mistake is subscribing to a broad table event like OnAfterInsertEvent and running heavy code. Developers also forget that events can be raised during preview posting, so check PreviewMode where relevant. Finally, never modify the Base Application, only extend it.
Frequently Asked Questions
How do I find the event I need?
Use the Event Recorder page in Business Central to record the events raised while you perform an action, or search the public Base Application source on GitHub for the codeunit and look for IntegrationEvent and BusinessEvent attributes.
What happens if my parameter list is wrong?
The AL compiler gives an error because the subscriber signature must match the published event. Names can differ in some cases, but the types, order and var modifiers must match, so copy from the publisher.
Can a subscriber change the outcome of posting?
Yes. Parameters passed by var can be changed, and an Error call stops the transaction. Use this carefully and document the behavior, because other extensions may subscribe to the same event.
Is this the same as C/AL triggers in NAV?
No. In classic NAV you edited code in base objects. In Business Central extensions you subscribe to published events and never change the base, which is what makes upgrades manageable.
If your extension work involves reports or integrations around posting, we can help design them with human approval on any write-back.
Related Tools
Business Central Core Table Numbers Reference
Look up the base application table number and name for ledger entries, documents, master data and manufacturing objects in Business Central and NAV.
Microsoft DynamicsBusiness Central On-Premises Extension Deploy PowerShell Generator
Creates the PowerShell sequence to publish, sync, install or upgrade a Business Central extension on an on-premises server instance.
Developer ToolsBusiness Central OAuth Token Request Generator
Builds the client credentials token request for Business Central online plus sample REST and OData calls using the returned token.
Microsoft DynamicsBusiness Central Go-Live Readiness Checklist
A cutover checklist for Business Central implementations covering opening balances, setup, security, integrations, training and fallback.
More Developer Tools tools
See all- Business Central AL Extension Skeleton Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
New to Microsoft Dynamics NAV and Business Central on-prem? Start with the Microsoft Dynamics NAV and Business Central on-prem guide and toolkit.
Keep exploring
Free tools
- Business Central AL Extension Skeleton GeneratorFill in publisher, prefix and ID range to get app.json, a table extension, a page extension, an event subscriber codeunit and a permission set.
- Business Central OAuth Token Request GeneratorBuilds the client credentials token request for Business Central online plus sample REST and OData calls using the returned token.
- Business Central On-Prem Private AI Layer Blueprint GeneratorDescribe your Business Central on-prem setup and get an architecture plan for a private AI assistant built on API v2.0 and a local model.
ERP fixes and how-tos
- Business Central Integration Events: How to Publish and Subscribe in ALHow integration events work in Business Central AL: declare a publisher, write an EventSubscriber, use IsHandled safely, bind manually, avoid traps.
- Adding a Private AI Layer to Business Central On-PremisesAdd AI to Business Central on-prem without cloud: API v2.0, custom API pages, SQL replica, retrieval, local LLM, BC permission sets, approved write-back.
- How to call an external REST API from AL in Business CentralCall an external REST API from Business Central AL with HttpClient: JSON request, headers, bearer token, error handling, the Allow HttpClient Requests setting.
AI on your ERP
- AI for Dynamics 365 Business Central in Discrete ManufacturingGrounded AI for Dynamics 365 Business Central discrete manufacturers: production orders, planning worksheets, routings and costing, on a private LLM.
- AI for Business Central manufacturing operations, beyond CopilotAI for Business Central manufacturing beyond Copilot: grounded answers on production orders, routings, and capacity via APIs v2.0, on-prem capable.
Integrations
- How to add WhatsApp to Microsoft Dynamics 365 Business CentralHow to connect WhatsApp to Dynamics 365 Business Central: API v2.0 or custom API pages, webhooks, template messages, and two-way replies that post back safely.
- How to add AI agents to Dynamics 365 Business CentralHow to add AI agents to Dynamics 365 Business Central: API v2.0 and custom API pages as the tool layer, approval gates, SaaS vs on-prem, and build options.
Software
- Microsoft Dynamics 365 Business CentralDynamics 365 Business Central explained for manufacturers: modules, APIs, AL extensions, deployment, strengths, limits and alternatives for small and mid-size firms.
- Microsoft Dynamics 365 Finance and Supply ChainDynamics 365 Finance and Supply Chain Management explained for manufacturers: modules, data entities, OData, deployment, strengths, limits and alternatives.