EASA Form 1 Field Checklist for Receiving and Stores
EASA Form 1 is the Authorised Release Certificate used under European rules for new parts and for parts released after maintenance. This checklist lets a stores or receiving inspector verify every field before the part is booked into stock.
0 of 28 items complete
12 critical items still open - these are the highest-risk gaps.
Header and identification
Part data
Release statement and signature
Handling the form after acceptance
Run every Form 1 through the list before booking the part into serviceable stock. Any unticked critical item means the part stays in quarantine and the issuer is contacted. Export the completed list and attach it to the goods receipt.
Want receiving checks built into your ERP?
We can outline how to compare Form 1 data to the purchase order before a receipt is posted, using read-only access on your own servers.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Print or open the list at the receiving bench and take the form and the part together. Work group by group: header, part data, release statement and signature. Where an item cannot be ticked, write the reason on the export and move the part to quarantine. When the issuer corrects the form, repeat the check from the top. The result becomes a record that shows your goods inwards control, which is the evidence an auditor looks for when asking how you know a part is eligible for fit.
What Form 1 certifies
Form 1 states who released an item, the work done or the production basis, the part and serial identity, and the data used. Its meaning depends on the release basis: production under an approved design, or maintenance. The form covers the item, not the aircraft. Under a bilateral arrangement, forms from other authorities may be accepted under conditions, and the receiving organisation records how it reached that decision. If you hold both EASA and FAA parts, a side-by-side comparison with the FAA 8130-3 field guide saves training time.
- Identity: part number, description, serial or batch number, quantity
- Condition: status or work performed
- Basis: release statement and data used in remarks
- Authority: signature, name, approval number and date
Reading the result
A form that passes every item can be booked into stock. A form that fails a non-critical item, such as a missing item description detail, can often be fixed with a note from the issuer, but keep the part blocked until the answer is on file. A form that fails any critical item should be rejected or returned. If more than a handful of forms from the same supplier fail the same item, raise a supplier corrective action request rather than correcting the same fault each time.
Common mistakes
Typical Form 1 errors include a quantity that does not match the delivery, a serial number that differs from the plate, a release basis box marked incorrectly, a missing approval number, and remarks that fail to show life data for a limited part. The most expensive error is accepting a form without reading the remarks, then finding months later that a directive was not addressed. Another is fixing a form on the bench with a pen. Only the issuing organisation may amend or reissue it.
Frequently Asked Questions
What is the difference between Form 1 and an FAA 8130-3?
Both are authorised release certificates issued under different authorities with different layouts. Acceptance across authorities depends on bilateral agreements and your own approval. A side-by-side check of fields is a good training exercise, but never assume they are interchangeable without reading your procedures.
Can I correct a Form 1 myself?
No. Only the issuing organisation may amend or reissue the form. If you find an error, quarantine the part, record the discrepancy and ask the issuer for a corrected certificate. Keep the original and the correspondence with the goods receipt record.
Does Form 1 release the aircraft to service?
No. It releases the item. The maintenance organisation that installs the part and completes the work issues the certificate of release to service for the aircraft, and records the part numbers and serial numbers installed.
What should the remarks contain?
Remarks should state the data used for the work, any directive or bulletin compliance, life data and limitations, and anything that restricts use. What is required varies with the part and the release type, so read your procedures and the issuer's guidance alongside the form.
If receiving data is keyed into your ERP by hand, we can help you add checks that compare the form to the order before the receipt is posted. Netray builds private, on-prem tooling for aerospace shops.
Related Tools
FAA 8130-3 Tag Field Guide
A searchable reference of 8130-3 fields, what belongs in each, and the errors receiving inspectors most often find.
Aerospace & DefenseAircraft Part Traceability Checklist
A 28-point checklist covering receiving, documentation, serial and batch control, life-limited parts and installation records for aircraft parts in an MRO.
Aerospace & DefenseMRO Incoming Inspection and Receiving Report Template
Record what arrived, its paperwork, visible condition and disposition on one controlled receiving report for aircraft parts and components.
Aerospace & DefenseMRO Work Package Template
A fill-in work package cover and index with scope, task card list, parts, tooling, resources and sign-off blocks for an aircraft maintenance visit.
More Aerospace & Defense tools
See all- CMMC 2.0 Level 2 Readiness Assessment
- ITAR Compliance Checklist for Manufacturers
- DFARS 252.204-7012 Compliance Self-Assessment
- AS9100 Audit Readiness Checklist
- Export Control Screening Checklist
- Defense Contractor AI Readiness Assessment
- Counterfeit Parts Risk Assessment (AS5553)
- Aerospace Supplier Scorecard
- First Article Inspection (AS9102) Checklist
Keep exploring
Free tools
- Aircraft Part Traceability ChecklistA 28-point checklist covering receiving, documentation, serial and batch control, life-limited parts and installation records for aircraft parts in an MRO.
- MRO Incoming Inspection and Receiving Report TemplateRecord what arrived, its paperwork, visible condition and disposition on one controlled receiving report for aircraft parts and components.
- MRO Turn Time CalculatorAdd up the stages of a repair, see total turn time against target, the value-adding share and the work in process your shop will carry.
ERP fixes and how-tos
- How to Add a Custom Field to an IFS Cloud PageStep-by-step guide to adding a custom field in IFS Cloud with configuration mode, plus data types, permission needs, upgrade safety and why a field may not show.
- SyteLine FormScripts, validators, personalization and bookmarksA practical intro to SyteLine FormScripts and validators, plus personalization and bookmarking options, with guidance on when each is the right tool.
- SyteLine Service Mobile App: Options for Field Service and Warehouse StaffWhat mobile options exist for SyteLine / CSI field service and warehouse work: browser access, Infor mobile apps, scanner front ends and custom apps, and how to choose.
Runs with your ERP
- Infor Service Mobile with Infor SyteLine Field ServiceInfor Service Mobile is a field technician app listed as a CloudSuite Industrial add-on. What it connects to in SyteLine service, setup steps, pitfalls, FAQ.
- SAP Field Service Management with SAP Business OneHow SAP Field Service Management, with Coresuite, syncs with SAP Business One service calls and billing: data flows, setup, pitfalls and a private AI layer.
- NetSuite Field Service Management (formerly NextService) for equipment manufacturersWhat NetSuite Field Service Management, formerly NextService, offers equipment makers: scheduling, dispatch, mobile app, asset history and work orders, plus setup tips.
Guides
- AI-Powered Aerospace ERP SolutionsAerospace-specific ERP solutions with AI. AS9100 compliance, ITAR management, MRO optimization, and traceability for aviation and space manufacturers.
- SyteLine Form Personalization Complete GuideComplete guide to SyteLine form personalization. Field visibility, layout changes, conditional logic, and user-level personalizations without code changes.
- AI in MRO: Aerospace Use Cases That Work and Realistic ROIAI in MRO and AI for MRO: predictive maintenance, tech-log classification, 8130-3 drafting and repair quoting. What works today, data needed, realistic payback.
AI on your ERP
- IFS Field Service Management AI Integration: Private AI on IFS Cloud Service DataAI for IFS Field Service Management: service requests, work tasks, agreements and technician data via IFS Cloud APIs, joined to parts and finance. On-prem.
- Oracle Field Service AI Integration: Private AI Over Activities, Resources and InventoryPrivate AI over Oracle Field Service activities, resources and inventory via the REST APIs, joined to ERP parts and contracts. Read-only, on-prem option.
Software
- Dynamics 365 Field ServiceDynamics 365 Field Service handles work orders, resource scheduling and mobile technicians on Microsoft Dataverse. Modules, integrations and alternatives.
- IFS Field Service ManagementIFS Field Service Management covers service orders, scheduling optimisation and mobile work within IFS Cloud. Modules, integrations, AI uses and alternatives.