Aerospace & DefenseFree referencePDF, Excel, Word exportAerospace MRO

FAA 8130-3 Tag Field Guide: What Each Field Means and What to Check

The FAA 8130-3 is the Authorized Release Certificate that travels with many aircraft parts and says who released them, in what condition and on what basis. This guide lists each field, what belongs in it and what a receiving inspector should check before the part goes into stock.

Download:
FieldWhat belongs thereWhat a receiving inspector checksCommon errorAppears on
Approving authority
The civil aviation authority and country that approved the issuing organization
Matches the authority the issuer actually works under
Blank or an abbreviation nobody can identify
Both
Form title
Authorized Release Certificate, with the form identifier
Correct form for the situation, not a shop traveler
Using a plain work order as a release
Both
Form tracking number
A unique number assigned by the issuing organization
Unique, legible, and not reused on another document
Duplicate or handwritten over
Both
Organization name and address
The company issuing the release, with its address
Matches the approval number in the signature block
Name does not match the approval holder
Both
Work order, contract or invoice number
The reference that ties the tag to a job
Can be matched to your purchase order or the repair order
No reference, so the tag cannot be linked to the order
Both
Item
Line item number when more than one part is listed
Every part on the tag is numbered and accounted for
Items missing or added by hand after signing
Both
Description
Name of the part or assembly
Consistent with the part number and with your order
Description that conflicts with the part number
Both
Part number
The part number of the item being released
Exact match to the physical part and the purchase order, including dash numbers
Dash number or revision letter mismatch
Both
Eligibility
The aircraft, engine or product models the part is eligible for
Covers the type and configuration you intend to fit it to
Left blank, or a vague entry such as 'all'
FAA 8130-3 only
Quantity
Number of items released
Equals the quantity physically received
Short shipment against a full-quantity tag
Both
Serial or batch number
Serial number, batch or lot number, or 'N/A' where none exists
Matches the data plate or label on the part
Serial number transposed or missing
Both
Status or work
Work performed, for example new, overhauled, repaired, inspected or modified
Consistent with what you ordered and with the remarks
'Repaired' when overhaul was ordered
Both
Remarks
Regulatory basis, repair or overhaul data used, airworthiness directive or bulletin compliance, life data and limitations
Contains the data you need to carry the part into your records
Empty remarks on a part that has a life limit
Both
Certification statement
The block where the signer states the basis for release, which differs by form and release type
The correct box is marked for the data basis used
Wrong box or both boxes marked
Both
Authorized signature
Signature of the person authorized by the issuing organization
Present, original or accepted electronic signature
Unsigned, or a stamp not allowed by the issuer's procedures
Both
Approval or authorization number
The certificate or authorization number of the issuing organization or signer
Present and consistent with the organization named
Missing number or a number from another company
Both
Name of signer
Printed name of the person signing
Legible and matches the signature
Illegible, so authority cannot be verified
Both
Date
Date of signing
Not later than receipt, not before the work was completed
Date in the future or before the work order date
Both
Reverse side notes
Standard notes about the use of the form
Read once so the team knows the limits of the document
Treating the tag as a release to service for the aircraft
Both
Copies and reissued tags
Duplicate or replacement certificates
Cross-referenced to the original tracking number
Two tags in circulation for one part
Both
Electronic tags
Electronically produced and signed certificates
Accepted in your procedures and verifiable with the issuer
Printing a PDF and altering it
Both
Tag does not equal release to service
The tag certifies a part, not the installation
The aircraft certificate of release comes from the installing organization
Using the part tag as proof the aircraft is serviceable
Both

Block numbers and wording differ between form revisions and between the FAA and EASA versions, so this guide uses field names. Always read the field against the current form and your authority's guidance. It is a training aid, not a regulation.

Want tag data checked automatically on receipt?

We can outline a validation step that compares tag fields to the purchase order inside your ERP, read-only and on your own servers.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the field guide

Search for a field name, or for a symptom such as serial number or remarks, and read the check column. The guide is arranged in the order you read the tag: authority and identification, then the part, then status and remarks, then the signature. Keep it open at the receiving bench or print it as a one-page aid. If you find an error, do not correct the tag yourself. Contact the issuing organization and ask for a corrected or reissued certificate, and keep the original with your discrepancy record.

What the tag is and is not

An 8130-3 is a part-level document. It tells you who certified the part, what work was done and what data was used, and it lets the receiving shop treat the part as eligible for installation, subject to its own checks. It does not by itself release an aircraft to service, and it does not guarantee that the part is eligible for your aircraft configuration. The eligibility entry, the remarks and your own technical data decide that. EASA Form 1 plays a similar role under European rules, with a slightly different field layout, so if you handle both, compare them side by side.

  • Check the part number against the tag character by character
  • Check the serial or batch number against the plate
  • Read the remarks for directive compliance and life data
  • Confirm the signer and approval number match the organization

Worked example

A hydraulic actuator arrives with a tag showing status overhauled, a serial number and remarks that cite the overhaul manual revision and list directive compliance. You match the part number and serial to the plate, confirm the quantity is one, confirm the signer's approval number belongs to the named shop, and note the remarks for your records. Everything agrees, so the receipt is accepted. If the remarks were empty on a part with a life limit, you would hold it and ask the shop for the missing data before stocking.

Common mistakes

Inspectors often check the part number and stop there. Most real discrepancies are elsewhere: a serial number that differs from the plate by one digit, a quantity that does not match, a tag signed by an organization whose approval number is missing, or a status that does not match what was ordered. Another frequent mistake is accepting photocopies without a procedure for verifying them. A good rule is that every field on the tag should either be consistent with the order and the part or be explained in the remarks.

Frequently Asked Questions

Is an 8130-3 the same as an EASA Form 1?

They serve a similar purpose as authorized release certificates but are issued under different authorities and have different field layouts. Bilateral agreements allow acceptance in many cases, subject to conditions. Check your approval, the agreement terms and any customer requirements before treating one as the other.

Does the 8130-3 release the aircraft to service?

No. The tag covers the part or work it describes. The organization that installs the part and performs maintenance on the aircraft issues its own certificate of release to service, and it records the installed part numbers and serial numbers in the aircraft records.

What should I do if a tag is wrong?

Do not alter it. Quarantine the part, document the discrepancy, and ask the issuing organization for a corrected or reissued certificate. Keep the original and the correspondence with the receiving record. Treat a part without a corrected tag as unserviceable until your quality system accepts it.

Can an 8130-3 be electronic?

Yes, electronic certificates exist and are accepted when the issuer's procedures and the receiving organization's procedures both allow them, and when authenticity can be verified. Altering a printed copy is never acceptable. Confirm your own rules for storage, signatures and retrieval of electronic records.

If your receiving team keys tag data into the ERP by hand, we can help validate it on entry against the order. Netray builds private tools around SAP, Infor and other ERPs for aerospace shops.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs