EPCRA Tier II and Form R Reporting Readiness Checklist

EPCRA reporting has two annual cycles with different rules: Tier II chemical inventory under Section 312 and Toxics Release Inventory Form R under Section 313. This checklist helps you work through scope, data collection and filing for both.

0%

0 of 28 items complete

9 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Scope and applicability

Inventory data collection

Toxics Release Inventory (Form R)

Submission and follow up

Critical items are those that commonly lead to missed filings or incorrect thresholds. Thresholds and dates are federal, so confirm against the current EPA rule text and your state requirements before you rely on them.

Automate the January chemical inventory pull

Optional: we can discuss extracting maximum and average chemical quantities from ERP transactions.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

Work through the groups in order and tick items as you complete them. Start in January so you have time to reconcile inventory data. Export the checklist as a PDF or Excel file to share with the EHS team, purchasing and the plant manager, and keep the completed copy as evidence of your reporting process.

  • Assign an owner to each group
  • Complete scope checks before collecting detailed data
  • Review critical items last, before submission

Method behind the thresholds

Section 312 compares the maximum amount of each hazardous chemical on site at any one time with the threshold. For most hazardous chemicals this is 10,000 pounds, and for extremely hazardous substances it is 500 pounds or the threshold planning quantity if lower. Section 313 uses annual throughput thresholds for manufacture, process or otherwise use of listed chemicals, so the numbers come from usage rather than storage.

Example

A machine shop stores 6,000 lb of cutting fluid concentrate and 5,000 lb of cleaning solvent. Each product is assessed on its own, so neither alone crosses 10,000 lb. However, if the SDS lists a hazardous component present in both products, the component quantities may need to be aggregated depending on the mixture approach you choose. Document the reasoning.

Common mistakes

Using year end inventory instead of the maximum on any day, forgetting to include chemicals in contractor stored tanks or trailers, and treating Tier II and Form R as one report. A second pattern is relying on purchasing records alone, which misses chemicals brought in by customers or maintenance contractors.

Frequently Asked Questions

When is the Tier II report due?

Federal EPCRA Section 312 requires Tier II reports by March 1 each year for the previous calendar year. Some states set different dates or use their own systems, so confirm with your state emergency response commission.

When is Form R due?

Form R under Section 313 is due July 1 for the previous calendar year. Facilities that meet the NAICS, employee and chemical threshold criteria must file for each covered chemical.

What is the difference between Tier II and Form R?

Tier II reports chemical inventories and storage for emergency planning. Form R reports releases and waste management quantities for specific toxic chemicals. They have separate thresholds, deadlines and recipients.

Does this checklist replace legal advice?

No. It is a preparation aid based on federal requirements as generally understood. Rules change and states differ, so verify against current EPA guidance and your state agency before submitting.

If your chemical inventory and purchasing data sit in your ERP, we can help build a repeatable extract for maximum and average quantities each January.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations