OSHA 300 Injury and Illness Log Worksheet
The OSHA 300 log is the running record of work-related injuries and illnesses that meet the recordkeeping criteria. This worksheet mirrors its main columns and totals so you can build the annual 300A summary from it.
| Case no. | Employee name | Job title | Date of injury/onset | Where event occurred | Injury/illness and body part | Most serious outcome | Days away | Days restricted/transfer | Type | Total lost and restricted days | |
|---|---|---|---|---|---|---|---|---|---|---|---|
0 | |||||||||||
9 | |||||||||||
8 | |||||||||||
0 | |||||||||||
14 |
Replace names with privacy-protected entries where 29 CFR 1904.29 allows (for example privacy concern cases). Count days using calendar days, stop counting at 180 days per case, and do not count the day of injury. Use the recordability rules in 29 CFR 1904 to decide what goes on the log. This worksheet is a convenience layout, not the official OSHA form.
Consolidate incident data automatically
Optional: discuss feeding incident and claim data into one safety dashboard.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add one row per recordable case within seven calendar days of learning about it. Enter the employee, job, date, where it happened, a short description including the body part, and the most serious outcome. Fill days away and days of restricted work or transfer. The sheet totals cases and days and computes lost and restricted days per row. At year end, transfer the counts by outcome and injury type to the official 300A summary, certify it by an executive, and post it from February 1 to April 30. Establishments with 20 to 249 employees in covered industries submit data electronically.
Recordability and counting rules
A case is recordable if it is work-related and results in death, days away from work, restricted work or job transfer, medical treatment beyond first aid, loss of consciousness, or a significant diagnosed injury or illness. Days away and restricted days are counted in calendar days, not scheduled workdays, and counting stops at 180 days per case. The day of injury is not counted. Cases from different types go into separate columns on the official form. Keep the log for five years following the end of the calendar year it covers.
- Record within seven calendar days
- Count calendar days, cap at 180 per case
- Keep the log five years after the year it covers
- Protect employee privacy on privacy concern cases
Common mistakes
The classic errors are treating a case as first aid when it received prescription-strength medication, failing to update days away when an employee remains out, counting scheduled workdays instead of calendar days, and forgetting to log a case that started as first aid and later worsened. Another is not reconciling the 300 log with workers' compensation claims and the first report of injury. Reconcile them each quarter and correct entries as facts change. This feeds directly into your TRIR and DART rates.
Frequently Asked Questions
Is this the official OSHA 300 form?
No. It follows the main columns of Form 300 to help you organize data and prepare the 300A summary. Use the official OSHA forms or the OSHA Injury Tracking Application where required to submit.
How long must I keep the log?
Five years following the end of the calendar year the records cover. Update the log during that period to reflect new information, such as additional days away.
Which employers must keep an OSHA 300 log?
Many employers with more than ten employees in industries not on the partially exempt list. Check 29 CFR 1904 appendices for your NAICS code and your state's plan.
What is the 180 day cap?
You may stop counting days away or restricted days at 180 for any one case. The log shows the cap rather than the actual number once it is reached.
If you want incident data from your ERP, HR and workers' compensation systems consolidated into this log automatically, Netray can scope the integration.
Related Tools
Safety Training Matrix Worksheet
An editable training record that shows who is trained on what, when it was last done and how many days remain before renewal.
Safety & WorkforceNoise Exposure TWA and Dose Calculator
Calculate noise dose and 8-hour time-weighted average from up to three exposure segments using the OSHA 5 dB exchange rate.
Safety & WorkforceChemical Inventory and SDS Tracking Worksheet
An editable chemical list for your hazard communication program, with location, quantity, hazard category and SDS revision date.
Safety & WorkforceToolbox Talk Record Template
A fill-in toolbox talk (safety huddle) record with topic, key points, questions raised and an attendee sign-in table, ready to print or export.
More Safety & Workforce tools
See all- Workplace Safety Audit Checklist
- Stormwater Inspection Report Template
- RCRA Hazardous Waste Codes Reference (D, F Codes)
- EPCRA Tier II and Form R Reporting Readiness Checklist
- Overall Labor Effectiveness (OLE) Calculator
- Hazard Identification and Risk Ranking Worksheet
- Forklift Pre-Shift Inspection Checklist Template
- Forklift Pre-Shift Inspection Checklist
- LOTO Lockout Tagout Periodic Inspection Checklist
Keep exploring
Free tools
- DART Rate CalculatorWork out your DART rate, days away rate and average days lost per case from your OSHA 300 log and hours worked.
- OSHA Manufacturing Safety ChecklistA printable plant inspection checklist organized by common OSHA general industry topics, with a companion quality defect checklist for factory walk-throughs.
- Workplace Injury Cost and Breakeven Sales CalculatorAdd direct and indirect injury costs and see how much additional revenue you must sell, at your margin, just to cover them.