Stormwater Inspection Report Template for Industrial Sites
Industrial stormwater permits usually require routine inspections of the site, outfalls and control measures, with a written record. This template gives you a repeatable form that you can export and file with your plan.
Fill in
Stormwater Inspection Report Template
Stormwater Inspection Report
Facility: Eastside Fabrication Plant Permit or SWPPP number: SW-IND-00482 Date: 2026-10-15 Inspector: A. Rahman, EHS technician Weather: Dry Last rain event: 2026-10-11, about 0.4 inch
Outfalls and Discharge Points
Outfall 1 (north swale): clear, no discharge. Outfall 2 (loading dock inlet): dry, light staining on concrete.
Inspection Areas
| Area | Satisfactory | Needs action | Notes |
|---|---|---|---|
| Material storage and drums | |||
| Loading and unloading docks | |||
| Scrap and waste bins | |||
| Vehicle and equipment parking | |||
| Drain inlets and catch basins | |||
| Sediment and erosion controls | |||
| Secondary containment | |||
| Housekeeping and sweeping |
Findings
Scrap bin lid open near the dock. Minor oil staining under a parked trailer. Sediment sock at Outfall 2 needs replacement.
Corrective Actions
| Issue | Action | Owner | Due date | Completed |
|---|---|---|---|---|
Certification
A general-purpose form, not a substitute for the inspection requirements in your permit. Inspection frequency, sample requirements and certification wording differ by permit and jurisdiction, so adapt it before use and keep it with your SWPPP records.
Automate inspection follow-up
Optional: ask how inspection actions could become work orders in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill the header with the permit number, date, weather and last rain event. Walk the site along the same route each time, noting outfalls first, then storage areas, docks, bins and drains. Mark each row in the inspection table, then describe issues in the findings box. Assign every needing action an owner and a date. Export to PDF for the file and keep the corrective action table open until each item is closed.
- Inspect during a rain event at least once if your permit expects it
- Photograph every finding with date and location
- Compare to the last report to spot repeat problems
- Update the site map when layout changes
What the permit usually looks for
In the United States, the EPA multi-sector general permit and state equivalents expect a stormwater pollution prevention plan, routine facility inspections, and monitoring for certain sectors. The inspection should cover areas where industrial materials or activities are exposed to rain, the control measures themselves, and evidence of pollutants leaving the site. Other countries have similar duties for site drainage and discharge consents.
Reading and acting on results
Group findings by cause: housekeeping, equipment failure, design gap or training. Housekeeping items such as open bins usually have quick fixes, while repeated staining under parked trailers may need a drip pan policy or a covered area. Review trends before your annual report or a management review.
Common mistakes
Filing the report without actions, skipping the weather record, and inspecting only when the site is clean. An inspection that finds nothing every time can look as weak as one never done.
Frequently Asked Questions
How often should stormwater inspections be done?
It depends on your permit. Many industrial permits require at least quarterly routine inspections, and some add visual monitoring or inspections after storm events. Read your permit conditions and write the frequency into your SWPPP and this form.
Who can sign the inspection report?
Permits often require a qualified person for inspection and a responsible company officer for certification of certain documents. Check your permit language for who must sign and what statement is required.
How long do I keep the reports?
Commonly at least three years, and often five, from the date of the report or the end of permit coverage. Confirm the period in your permit and keep reports with the SWPPP for easy retrieval.
What if an inspection finds a discharge problem?
Stop the source if it is safe, contain the material, document with photos, and follow your permit's corrective action and reporting steps. Record the cause and the fix in the corrective action table.
If you want inspections, work orders and purchasing for control materials linked, we can help connect them to your ERP.
Related Tools
Spill Incident Report and Corrective Action Template
A structured form to record a chemical or oil spill, the response, notifications and corrective actions.
Safety & WorkforceHazardous Waste Container Inspection Log Worksheet
Log each container's label, closure, condition and days accumulated, and flag anything nearing your storage time limit.
Compliance & ContractsEnvironmental Compliance Obligations Register Worksheet
Track every permit, regulation and customer requirement with owner, frequency and next due date, and see overdue items at a glance.
Safety & WorkforceEnvironmental Aspects and Impacts Register Worksheet
Score each activity's environmental aspect for severity, frequency and control, and see which ones rank as significant.
More Safety & Workforce tools
See all- Workplace Safety Audit Checklist
- OSHA 300 Injury and Illness Log Worksheet
- Noise Exposure TWA and Dose Calculator
- RCRA Hazardous Waste Codes Reference (D, F Codes)
- EPCRA Tier II and Form R Reporting Readiness Checklist
- Overall Labor Effectiveness (OLE) Calculator
- Hazard Identification and Risk Ranking Worksheet
- Forklift Pre-Shift Inspection Checklist Template
- Forklift Pre-Shift Inspection Checklist
Keep exploring
Free tools
- Receiving Inspection Report TemplateA fill-in receiving inspection report with supplier, PO, sampling plan, measurement table and disposition, ready to export.
- Shop Floor Housekeeping and Cleaning ChecklistA tickable housekeeping and cleaning checklist grouped by daily, weekly and monthly frequency, with critical safety items flagged and a score you can export.
- Manufacturing Plant Safety Inspection ChecklistPrintable plant safety inspection checklist grouped by area with suggested frequencies, critical items and a pass count, ready for sign-off and PDF export.
ERP fixes and how-tos
- How to create an inspection plan in SAP QM (QP01)Create an inspection plan in SAP QM with QP01: header, operations, master inspection characteristics, sampling procedure and material assignment, plus a plan report.
- Inspection Results and Inspection Plan Reports in SAP QMWhich SAP QM transactions report inspection results and inspection plans? Use QA32, QE03, QGC1 for evaluation and QP19 for plan lists, plus the QM tables behind them.
- SAP QM inspection results report: which tcode shows whatFind inspection results in SAP QM: QA32 lot list, QE51N results worklist, QM12 and QGC2 evaluations, MIC history, and the QALS, QAMR and QAVE tables.
Runs with your ERP
- NetSuite Quality Management SuiteApp: inspections and nonconformanceWhat the NetSuite Quality Management SuiteApp does: inspection specs, queues, sampling and nonconformance workflows. Setup, pitfalls, alternatives and AI uses.
- Oracle Fusion Cloud Quality Management with Fusion SCMHow Oracle Fusion Cloud Quality Management logs nonconformance against WIP, receiving and supplier records and drives CAPA: flows, setup and pitfalls.
- Ecosire quality control and inspection with SAP Business One: CoA, NCR, CAPA and alternativesHow Ecosire's quality add-on for SAP Business One handles inspections, CoA, NCR and CAPA, plus Ecosire alternatives such as Embee emQC or a dedicated QMS.
Guides
- SyteLine First Article Inspection (FAI) Process ConfigurationConfigure SyteLine first article inspection for new part qualification. Set up FAI plans, measurement recording, and AS9102 compliance reporting in CloudSuite Industrial.
- SyteLine Receiving and Quality Inspection Workflow ConfigurationConfigure SyteLine receiving and quality inspection workflows. Set up PO receiving, inspection plans, and non-conformance triggers in CloudSuite Industrial ERP.
- Infor LN Quality Management Module: Complete GuideInfor LN Quality Management module guide: inspection orders, sampling, non-conformance and MRB flows, and AS9100D-aligned quality data manufacturers can audit.
AI on your ERP
- AI for SyteLine Quality: Nonconformance Reports and Inspection DataAI for Infor SyteLine quality: analyse NCR trends, inspection results and supplier defects, draft dispositions for review, and keep quality data private on-prem.
- AI for 1factory: First Article and Inspection Data Joined to Your ERPPrivate AI for 1factory: first article inspection (AS9102), ballooned drawings and inspection data joined to ERP work orders, lots and suppliers.