Epicor Job Material Shortage SQL Query Generator
Planners need to know which released jobs are waiting on material. The JobMtl table holds required and issued quantity per material line, so a short query against JobHead and JobMtl answers most shortage questions. This generator fills in your company and plant.
Fill in
Leave as your plant id
Job material shortage query
-- Open job materials not fully issued, released jobs only
SELECT jh.JobNum,
jh.PartNum AS JobPart,
jm.AssemblySeq,
jm.MtlSeq,
jm.PartNum AS MtlPart,
jm.Description,
jm.RequiredQty,
jm.IssuedQty,
(jm.RequiredQty - jm.IssuedQty) AS ShortQty,
jm.IssuedComplete,
jm.BuyIt,
jh.StartDate
FROM Erp.JobHead jh
INNER JOIN Erp.JobMtl jm
ON jm.Company = jh.Company
AND jm.JobNum = jh.JobNum
WHERE jh.Company = 'EPIC06'
AND jh.Plant = 'MfgSys'
AND jh.JobReleased = 1
AND jh.JobClosed = 0
AND jh.JobComplete = 0
AND jm.IssuedComplete = 0
AND (jm.RequiredQty - jm.IssuedQty) >= 1
AND jh.StartDate <= DATEADD(day, 14, GETDATE())
ORDER BY jh.StartDate, jh.JobNum, jm.AssemblySeq, jm.MtlSeq;Add on hand for each material part
-- Optional: join total on hand by part for the same company
SELECT jm.PartNum AS MtlPart,
SUM(pb.OnhandQty) AS OnHand
FROM Erp.JobMtl jm
LEFT JOIN Erp.PartBin pb
ON pb.Company = jm.Company
AND pb.PartNum = jm.PartNum
WHERE jm.Company = 'EPIC06'
AND jm.IssuedComplete = 0
GROUP BY jm.PartNum;Run on a read replica or inside a BAQ, never on a production database during peak hours without a DBA's agreement. Confirm column names against the Data Dictionary Viewer for your release. Plant columns can differ on JobHead depending on version, and a job can have buy-it lines that show a shortage until a purchase receipt arrives.
Shortage reporting review
Optional: we can look at how your planners find shortages today and suggest a read-only assistant.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter your company id, plant, a look-ahead window for the job start date and the smallest shortage you care about. Copy the query into SQL Server Management Studio on a replica, or recreate the same joins and filters in the BAQ designer. The second block adds total on hand per material part so you can see whether the shortage is a stock-out or just not yet issued.
What the query tells you
A line is short when RequiredQty is greater than IssuedQty and IssuedComplete is not set. Sorting by job start date puts the most urgent shortages first. If on hand is above the shortage, the fix is an issue transaction or a pick, not procurement. If on hand is zero, check purchase order releases due before the job start and whether the line is flagged BuyIt, meaning it is purchased directly for the job.
- Short with stock available: issue or pick material
- Short with no stock: expedite the purchase order
- BuyIt lines: check the PO release against job start
Common mistakes
Forgetting the JobReleased filter pulls in firm planned jobs that are not yet on the floor, creating noise. Ignoring IssuedComplete shows lines the shop has finished with a short issue. Joining PartBin without limiting to the right warehouses overstates availability when stock sits in a non-nettable warehouse. Add a warehouse filter for the warehouses MRP nets in your company.
Frequently Asked Questions
Can I use this inside the BAQ designer?
Yes. Add JobHead and JobMtl as tables, create the join on Company and JobNum, and put the filters in the criteria. The calculated shortage is an expression field equal to RequiredQty minus IssuedQty.
Why is a line shown as short when it is already purchased?
The query reports material not yet issued. A purchased item sitting on an open PO release still counts as short until it is received and issued. Add a PO release lookup if you want to show expected arrival.
Does the query respect Epicor security?
Direct SQL does not. Security groups and company restrictions apply only inside Epicor, such as in a BAQ. Use a BAQ for anything given to end users.
Will column names differ by version?
Core columns like RequiredQty, IssuedQty and IssuedComplete have been stable, but always validate against your Data Dictionary Viewer, especially for plant and status flags.
Netray can turn queries like this into a conversational shortage assistant on your Epicor data, read-only, with the SQL shown for every answer.
Related Tools
Epicor Kinetic Database Tables Reference
Look up the main Erp.* tables in Epicor Kinetic with what each holds and the columns that identify a row. Useful when writing BAQs and SQL.
EpicorEpicor Part Transaction Types Reference
Decode the TranType codes in Epicor's PartTran table so inventory audits and cost reconciliations stop being guesswork.
EpicorEpicor Open Sales Order Releases SQL Generator
Pull open order releases with required dates and quantities to build a backlog or past-due report.
EpicorEpicor BAQ Performance Tuning Checklist
Work through a practical list of checks when a BAQ, dashboard or BPM lookup runs slowly in Epicor Kinetic.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BAQ Query Template Generator
- Epicor BPM Directive Design Template
- Epicor DMT Import Template Worksheet (Part and BOM)
- Epicor MRP Run Checklist
- Epicor Kinetic Upgrade Checklist
- Epicor REST API v2 URL Builder
- Epicor Security Group Design Worksheet
- Epicor Safety Stock and Reorder Point Calculator
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor Open Jobs BAQ SQL GeneratorGenerates a read-only T-SQL query listing open, released jobs from Erp.JobHead with optional due-date and part filters.
- Epicor Kinetic Job Status ReferenceA searchable lookup of the job lifecycle flags and related fields in Epicor Kinetic job entry, so you can build BAQs and dashboards with the right filter.
- Epicor BAQ Query Template GeneratorFill in company, days back and status filters to get a starter SQL for an open jobs BAQ, plus a design checklist for the Query Builder.
ERP fixes and how-tos
- Shortage, Scrap, WIP, BOM, GL and Sales Reports in Epicor KineticWhere to find the Epicor Kinetic shortage, scrap, WIP, BOM, general ledger and sales reports, and how to build each one as a BAQ when the standard report falls short.
- How to Issue Material in Epicor KineticIssue material to a job in Epicor Kinetic: direct and backflush options, substituting parts, the material queue, and what to check when issue fails.
- Why Is Epicor So Slow? A Kinetic Performance ChecklistDiagnose slow Epicor Kinetic: separate client, app server, SQL Server, BAQ and network causes, with a step-by-step checklist and ways to tell slow from down.
Guides
- Epicor vs Infor: Should You Switch ERP Platforms?Compare Epicor Kinetic vs Infor CloudSuite for manufacturing. Functional analysis, migration costs, and decision framework for switching platforms.
- Job Shop ERP Software Comparison: JobBOSS, E2 Shop System, ProShop and Global ShopJob shop ERP software compared for CNC machine shops: JobBOSS2, E2 Shop System, ProShop, Global Shop Solutions and Epicor Kinetic, and the questions to ask.
AI on your ERP
- AI for Epicor Kinetic Job Shops: Quote History, Job Variance and Schedule RiskPrivate AI for Epicor Kinetic job shops: quote-to-job history, JobHead and JobOper variance, subcontract delays and schedule risk, via REST and BAQs.
- AI for Epicor Kinetic Estimating and Quoting: Faster Quotes Grounded in Your Own Job HistoryAI for Epicor Kinetic quoting: draft quotes from RFQs, find similar past jobs, check cost against actuals, and keep drawings and pricing on your own servers.
Integrations
- How to add an AI chatbot to Epicor KineticAdd an AI chatbot to Epicor Kinetic: an internal assistant for planners and buyers or a customer portal bot, grounded in BAQs and runnable fully on-prem.
- How to add AI agents to Epicor KineticHow to add AI agents to Epicor Kinetic: a tool layer over the REST v2 API and BAQs, MRP exception triage, PO expediting, and human approval before any write.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.