Epicor BAQ Runtime and Row Volume Estimator
A BAQ that returns in two seconds on a test company can take minutes in production. This estimator models the two things that drive that gap: how many rows are read and how many rows come out after joins. Use it to reason about a design before users depend on it.
Your numbers
For example the row count of Erp.OrderDtl or Erp.JobOper.
Percent of the driving table that survives your criteria.
1.0 for pure lookups, higher for one-to-many joins such as header to detail.
Calibrate by timing a known query on your server.
Your results
A planning model. Real runtime depends on SQL Server plans, statistics, locking and server load. Confirm with the BAQ Designer Analyze tab and SQL profiling.
Estimated runtime vs filter selectivity
Sweeps Rows kept by your WHERE filter from 1 to 100, holding your other inputs fixed.
BAQ performance review
Optional: send us your slowest BAQs and dashboards and we will suggest indexes and rewrites.
Optional. The tool and every export work without this. No spam.
How to use the estimator
Enter the row count of the table your BAQ starts from, the share of those rows that survive your filter, and the number of joins with an average match count. Choose whether the filter hits an index. The tool reports result rows, total rows of work and an estimated runtime, plus a chart that sweeps filter selectivity so you can see how sharply a tighter filter helps.
- Get driving row counts from SQL Server or a quick count BAQ.
- Use a fanout of 1.0 for lookups to Part or Customer.
- Calibrate rows per second using a query whose runtime you already know.
The model behind the numbers
Result rows equal filtered driving rows multiplied by the fanout once per join. Work equals the rows read from the driving table plus the rows produced. A table scan reads every driving row regardless of the filter, while an index seek reads roughly the filtered rows only. Runtime is work divided by throughput. It is deliberately simple so the levers stay visible: selectivity, fanout and index use.
Reading the result
If result rows are far above what a human can read, the BAQ is probably feeding a dashboard, export or another process and should be tuned for that. A large gap between rows read and result rows suggests a missing index or a filter applied too late. A fanout above 1.0 across many joins grows result rows exponentially, which is the classic cause of a BAQ that suddenly slows when one customer has many lines.
Common mistakes
Developers often tune the final SELECT while the problem is an unfiltered join to a large detail table. Calculated fields that call functions per row, and subqueries in the select list, add work not captured here. Always add date or company filters as parameters, avoid LIKE with a leading wildcard, and check the generated SQL when a BAQ misbehaves.
Frequently Asked Questions
Why is my BAQ slow only in Live and not in Pilot?
Live usually has many more rows and different statistics. A query that scans a table looks instant on a small Pilot database but takes far longer on years of production data. Compare row counts first.
Does this replace the BAQ Designer analyze feature?
No. The estimator is a quick what-if for design decisions. The Designer and SQL Server execution plans show what actually happens on your data and should be used to confirm.
What fanout should I enter for header to detail?
Use the average number of detail lines per header, such as lines per order or operations per job. If it varies widely, run the estimate for both the average and a heavy case.
How do I measure rows per second?
Time a representative BAQ with known row work, then divide rows read plus rows returned by seconds. Repeat on your production server at a quiet time, since results vary with load.
Netray can review slow BAQs and dashboards against your actual Epicor database and suggest indexes and rewrites. This estimator works fine without us.
Related Tools
Epicor REST API Paging and Throughput Calculator
Estimate how long an Epicor REST extract takes for a given page size, latency and concurrency, and find the sweet spot.
EpicorEpicor BPM Directive Overhead Calculator
See how many milliseconds and server hours your BPM directives add per transaction and per day.
EpicorEpicor Database Growth Forecast Calculator
Project storage needs over several years from transaction volume, row size, index overhead, growth and backup copies.
More Epicor tools
See all- Epicor Kinetic Customization Change Request Form Template
- Epicor Kinetic Go-Live Cutover Plan Template
- Epicor Kinetic User Access Request Form Template
- Epicor Kinetic BPM Directive Inventory Worksheet
- Epicor Kinetic Scheduled Task Register Worksheet
- Epicor Kinetic Custom Report Inventory Worksheet
- Epicor Kinetic Data Migration Mapping Worksheet
- Epicor Kinetic Data Load Effort Calculator
- Epicor Business Object Services Reference
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor BAQ Query Template GeneratorFill in company, days back and status filters to get a starter SQL for an open jobs BAQ, plus a design checklist for the Query Builder.
- Epicor BAQ Performance Tuning ChecklistWork through a practical list of checks when a BAQ, dashboard or BPM lookup runs slowly in Epicor Kinetic.
- Epicor Open Jobs BAQ SQL GeneratorGenerates a read-only T-SQL query listing open, released jobs from Erp.JobHead with optional due-date and part filters.
ERP fixes and how-tos
- How to Create a BAQ in Epicor KineticCreate a BAQ in Epicor Kinetic Query Builder: pick tables, set joins, display fields, criteria, calculated fields, test, and use it in dashboards and reports.
- How to Create a BAQ in Epicor: Build, Run, Search, Export to Excel and PublishStep-by-step: create a BAQ in Epicor Query Builder, add tables and criteria, run and search it, export to Excel, and publish it as a dashboard.
- How to Add AI to Epicor Kinetic On-Premises Without Moving Your DataReference architecture for a private AI assistant on Epicor Kinetic on-premises: BAQ and REST v2 access, SQL replica, local LLM, roles, audit and rollout.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- AI for Epicor Kinetic Job Shops: Quote History, Job Variance and Schedule RiskPrivate AI for Epicor Kinetic job shops: quote-to-job history, JobHead and JobOper variance, subcontract delays and schedule risk, via REST and BAQs.
Integrations
- How to build an MCP server for Epicor KineticDesign a Model Context Protocol server for Epicor Kinetic: which read tools to expose, BAQ and REST v2 mapping, auth, stdio vs HTTP transport and audit logging.
- How to use Claude with Epicor KineticUse Claude with Epicor Kinetic through an MCP connector, the Anthropic API, AWS Bedrock or Google Vertex, plus the private on-prem alternative for sensitive data.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.