Quality & InspectionFree worksheetPDF, Excel, Word exportMedical Devices

ISO 13485 Gap Analysis Template with ISO 9001 and QMSR Comparison

This ISO 13485 gap analysis template walks the clauses of ISO 13485:2016, shows where each one differs from ISO 9001, and turns your maturity scores into a single gap number. Edit the rows, add your own clauses and export to Excel.

Free, optional. Reopen it on any device.
Download:
ISO 13485 clauseTopicWhat the clause asks for (summary)Versus ISO 9001Weight (1-3)Maturity (0-4)Gap pointsOwnerAction to close gap
6
9
2
2
6
6
9
2
6
3
6
9
2
2
Total weight
37
Total gap points
70
Readiness against listed clauses
52.7%
100 percent means every weighted clause is at maturity 4.

Rows are examples. Add a row for every clause and sub-clause that applies to your scope, including documented exclusions under clause 1.2. Summaries are paraphrased, read the standard itself for the exact requirements.

Get a second pair of eyes on your gap list

Optional: we can review your exported gap analysis and show which traceability and CAPA evidence your ERP can already produce.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the gap analysis template

Start with the clause list in the standard's table of contents: 4 Quality management system, 5 Management responsibility, 6 Resource management, 7 Product realization and 8 Measurement, analysis and improvement. For each clause, score weight 1 to 3 by patient and regulatory risk and maturity 0 to 4 by how well you do it today with objective evidence. The sheet multiplies weight by the distance from full maturity so a weak high risk clause outweighs a weak low risk one.

  • Score from records you can show an auditor, not from intent
  • Record an owner and a specific action per gap
  • Re-score monthly and export a copy for management review

ISO 9001 and ISO 13485 comparison in practice

ISO 13485 is not a superset of ISO 9001. It drops the customer satisfaction and continual improvement emphasis and replaces them with regulatory compliance and device safety. Expect the largest new work in design controls, risk management through the lifecycle, process validation, traceability, complaint handling and regulatory reporting. The column Versus ISO 9001 flags which clauses a company coming from ISO 9001 will find familiar and which have no equivalent.

  • No ISO 9001 equivalent: medical device file, complaint handling, regulatory reporting
  • More prescriptive: documentation, design, purchasing, traceability
  • Medical device specific: work environment, sterile device and implant controls

Comparing with FDA QSR and QMSR

FDA's Quality Management System Regulation (QMSR) amends 21 CFR Part 820 and incorporates ISO 13485:2016 by reference, with effect from 2 February 2026. A gap analysis for US devices therefore uses the same clause structure and adds the FDA specific items: complaint files, medical device reporting under Part 803, UDI, labeling and the records FDA can inspect that ISO auditors do not always request. Keep one extra column or a second sheet for the FDA specific actions.

Common mistakes

Teams score a clause as mature because a procedure exists, even though records show it is not followed. Others forget software used in the QMS, including ERP lot traceability and electronic signatures, which clause 4.1.6 requires to be validated for its intended use. Finally, exclusions are only allowed for clause 7 requirements that do not apply, and they must be justified in the quality manual.

Frequently Asked Questions

How long does an ISO 13485 gap analysis take?

For a small manufacturer with an existing ISO 9001 system, a first pass usually takes a few days of interviews and record sampling. The scoring is quick, but collecting evidence per clause is what takes time. Plan a second pass after corrective actions are in place.

Is ISO 13485 the same as ISO 9001 plus medical rules?

No. It follows a similar structure, but it is built around regulatory compliance and risk, drops several ISO 9001 improvement and customer satisfaction requirements and adds device specific controls for design, validation, traceability and complaints.

Does QMSR replace ISO 13485 for US devices?

QMSR incorporates ISO 13485:2016 by reference into 21 CFR Part 820 and adds FDA specific requirements. Certification to ISO 13485 is still voluntary for FDA purposes, but the content you must meet is now aligned.

Can I exclude clauses from my ISO 13485 scope?

Only clause 7 requirements that do not apply to your activities can be excluded, and the reason must be recorded in your quality manual. Clauses 4, 5, 6 and 8 cannot be excluded.

If your lot genealogy, complaints and CAPA data sit in an on-prem ERP, Netray can add a private AI layer that answers trace and audit questions from that data without sending it outside your network.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs