FMEA Review Checklist

A good FMEA review looks beyond whether the form is filled in. It checks that the failure logic holds, ratings are consistent, actions are real and the document stays linked to the control plan. Use this checklist before a customer submission, internal audit or design gate.

0%

0 of 36 items complete

10 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Scope and team

Structure and function

Failure chain

Ratings

Actions and follow-up

Links and maintenance

Count the items you can answer yes to. Fix every unchecked critical item before the FMEA goes to a customer or auditor.

Get an expert read of your FMEA process

Optional: ask for feedback on how FMEA, control plans and ERP records fit together.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

Open the FMEA and the process flow side by side and go through the groups in order. Tick each item you can verify from the documents, not from memory. Mark gaps and note owners. The critical items are the ones that most often cause audit findings or customer rejection: missing steps, causes written as modes, ratings that lack evidence and unclosed severity 9 and 10 lines. Run the review with someone who did not write the FMEA.

  • Review with the flow diagram and control plan open
  • Sample at least ten lines in depth
  • Trace three actions from open to verified evidence
  • Record findings and re-review after fixes

What reviewers should look for

Start with scope and flow completeness, since all later quality depends on it. Then test the failure chains: can each cause actually produce the stated mode and effect? Check ratings against the agreed scale and against data such as scrap, returns or capability studies. Finally follow the thread into actions and the control plan. An FMEA with perfect formatting but no connection to the real process is the commonest hidden failure.

Reading your score

A high yes rate with all critical items passed means the FMEA is ready for review. Many unchecked critical items suggest the FMEA was written as a paperwork exercise and needs a team session. If only the links group fails, the FMEA may be sound but disconnected from the control plan and routing. Prioritise fixes by effect on customers: safety lines, then special characteristics, then the rest.

Common mistakes

Typical findings include copied FMEAs not adapted to the new part, detection ratings based on inspection that is not actually performed, and RPN arithmetic that does not match the ratings. Another is an FMEA that is never updated after a customer complaint. Keep a living document, review it in each quality meeting, and tie updates to corrective action closure so lessons are captured permanently.

Frequently Asked Questions

Who should review an FMEA?

Someone independent of the author, ideally a quality or reliability engineer with process knowledge, plus a representative from production. Customer or auditor reviews come on top of the internal review.

How often should an FMEA be reviewed?

At least annually, and whenever there is a design or process change, a customer complaint, a nonconformance trend or a new customer requirement. Treat the FMEA as a living record.

What are the most common FMEA audit findings?

Missing process steps, causes written as failure modes, unsupported ratings, high severity lines without action, and a control plan that does not match the PFMEA are the most frequent.

Does this checklist work for AIAG-VDA FMEAs?

Yes. The items cover scope, structure, function and failure analysis, ratings and action tracking, which apply to both the older format and the seven step AIAG-VDA method.

If you want FMEA, nonconformance and ERP records reviewed together, Netray can discuss a read-only data review. The checklist is free and stands alone.