Control Plan Template for Manufacturing
A control plan lists, step by step, what is controlled in a process, how it is measured, how often, and what to do when something drifts. This template builds a formatted document from your header information and gives you a ready process table to edit and export.
Fill in
Control Plan Template (PDF/Word)
Control Plan
Company: Acme Precision Ltd Control plan no: CP-4821 Phase: Pre-launch Part number: PN-48213 Part name: Hydraulic valve body Revision: C Customer: Example OEM Date: 2026-10-20
Core Team
Quality engineer, process engineer, production supervisor, maintenance lead
Process Controls
| Op | Process description | Machine / device | Characteristic | Special class | Spec / tolerance | Measurement method | Sample size and frequency | Control method | Reaction plan |
|---|---|---|---|---|---|---|---|---|---|
| 20 | CNC turn bore | Lathe L-04 | Bore diameter | Critical | 25.000 +0.021 / 0 mm | Air gauge | 5 pcs per hour | SPC X-bar and R chart | See default reaction plan |
| 30 | Deburr cross holes | Deburr cell | No burrs at cross hole | Per drawing note 4 | Visual with 10x loupe | 100 percent | Fixture with presence sensor | See default reaction plan | |
| 50 | Torque cover bolts | Torque tool T-12 | Torque value | Critical | 28 Nm +/- 2 Nm | Torque tool with angle monitor | 100 percent | Tool lockout on fault | See default reaction plan |
Reaction Plan
Stop the process, contain suspect parts back to the last good check, notify supervisor and quality, and record in the nonconformance log.
Approvals
A control plan describes the controls for a process. It is a starting layout, not a copy of any customer form. Check your customer's requirements and keep it aligned with the PFMEA and process flow. It does not constitute legal or regulatory advice.
Turn your control plan into ERP inspection plans
Optional: discuss keeping control plans and ERP inspection plans in step.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill in the header fields at the top, then export the document and complete the process table in Word or after pasting into Excel. Add one row per operation and characteristic. Pull the characteristic names, special classifications and controls from the PFMEA and process flow, so the three documents agree. Choose a phase: prototype, pre-launch or production, as control intensity differs. Sign off with the core team before releasing to the floor.
- One row per characteristic per operation
- Use the same operation numbers as the routing and PFMEA
- State the sample size and frequency, not just inspect
- Name a specific reaction plan, not just notify quality
Where the control plan sits in APQP
In APQP and IATF 16949 practice the control plan is built from the process flow diagram and PFMEA, and is then used on the shop floor for inspection instructions and audits. Prototype, pre-launch and production plans escalate as the process matures. Every PFMEA control that matters, whether preventive or detective, should appear in the plan, and any process change or nonconformance that affects a characteristic should trigger a review.
Reading and checking the result
A good control plan answers four questions for each characteristic: what is controlled, how it is measured, how often, and what happens on a failure. Check that special characteristics from the PFMEA appear with a capability-based method such as SPC, that measurement methods match the tolerance and the gauge capability from MSA, and that reaction plans name containment steps. Sample sizes should link to process stability, with tighter checks at launch.
Common mistakes and ERP links
Plans frequently copy the drawing instead of the PFMEA, leave sample frequencies vague, or are not updated after a process change. In ERP or MES, link each control plan line to the routing operation and inspection plan so instructions appear at the work center. Revision control matters: the plan on the shop floor must be the released revision, and old copies should be removed.
Frequently Asked Questions
What is the difference between a control plan and a PFMEA?
The PFMEA analyses what could fail and ranks risk. The control plan states the controls used during production, including methods, frequencies and reactions. The PFMEA feeds the control plan, and both should be revised together.
Is a control plan required?
It is required by IATF 16949 for automotive suppliers and requested by many aerospace and industrial customers. Even where not mandated it is a practical way to document inspection and process controls.
What are the three control plan phases?
Prototype covers controls during prototype builds, pre-launch covers controls after prototype and before full production, and production documents the full controls for mass production. Each is a separate revision.
Can I add more rows?
Yes. Export to Word, then add rows to the process table as needed. You can also build a separate row list in the PFMEA worksheet tool and paste it across.
If you want control plan lines to drive inspection plans in your ERP, Netray can discuss how that integration might work. The template itself needs no sign-up.
Related Tools
PFMEA Worksheet with RPN (Excel Export)
Fill a process FMEA row by row. RPN is calculated from S, O and D and the worst risk is summarised for you.
Quality & InspectionProcess Flow Diagram Worksheet (Excel Export)
Tabulate each process step with symbol type, equipment, characteristics and cycle time ahead of PFMEA and control plan work.
Quality & InspectionFMEA Review Checklist
Check a DFMEA or PFMEA for scope, failure logic, ratings consistency, actions and links to the control plan.
Quality & InspectionAIAG-VDA FMEA Action Priority Reference
A quick lookup of the AIAG-VDA FMEA steps, action priority meaning and how it replaces RPN.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- SPC Control Plan WorksheetRow-by-row control plan that picks the chart type, sample size and reaction plan for each characteristic. Export to Excel.
- Production Control Plan Worksheet for PPAPEditable control plan table covering characteristic, specification, measurement method, sample size, frequency and reaction plan.
- Key Characteristic Control Plan TemplateA control plan document for key characteristics with measurement method, sample plan, capability target and reaction plan, ready for AS9103 style variation management.
ERP fixes and how-tos
- How to create an inspection plan in SAP QM (QP01)Create an inspection plan in SAP QM with QP01: header, operations, master inspection characteristics, sampling procedure and material assignment, plus a plan report.
- SYSPRO Application Designer: Customize Screens and FieldsWhat SYSPRO Application Designer does, how to change screen layouts and add fields, and the upgrade and security risks to plan for before customizing.
Guides
- Infor LN Production Order Management and Control SetupConfigure Infor LN production control with production order types, routing setup, material issuing methods, and shop floor integration for manufacturing.
- SyteLine Statistical Process Control (SPC) Implementation GuideImplement statistical process control in SyteLine for manufacturing quality. Configure control charts, Cpk calculations, and process monitoring in CloudSuite Industrial.
- How to Set Up Document Control in SyteLineGuide to implementing document control in Infor SyteLine. Configure document types, revision management, approval workflows, and distribution control for ISO 9001 and AS9100 compliance.