GST SAC Code List for Manufacturers in India
SAC stands for Services Accounting Code. It plays the same role for services that HSN plays for goods. This list gives the four-digit groups a factory sees most often, from job work under 9988 to freight under 9965.
| SAC | Service group | Where a factory meets it |
|---|---|---|
9954 | Construction services | Plant building, civil works, shed erection |
9961 | Services in wholesale trade | Trading margin services |
9965 | Goods transport services | Road, rail, air and water freight; GTA services |
9967 | Supporting services in transport | Cargo handling, warehousing, storage, packing for transport |
9968 | Postal and courier services | Courier of samples and documents |
9969 | Electricity, gas and water distribution | Power wheeling and distribution services |
9971 | Financial and related services | Bank charges, guarantees, forex services |
9972 | Real estate services | Industrial land and building rent, leasing of property |
9973 | Leasing or rental services without operator | Rental of machinery, vehicles, equipment |
9981 | Research and development services | Contract R and D, prototyping studies |
9982 | Legal and accounting services | Audit, tax and legal fees |
9983 | Other professional, technical and business services | Engineering consulting, testing and analysis, design, IT consulting |
9984 | Telecommunications, broadcasting and information services | Telecom, internet, data hosting |
9985 | Support services | Manpower supply, security, housekeeping, travel agency |
9986 | Support services to agriculture, hunting, forestry, fishing, mining and utilities | Support services for mining and utilities |
9987 | Maintenance, repair and installation services (except construction) | Machine repair, AMC, installation and commissioning |
9988 | Manufacturing services on physical inputs owned by others | Job work: machining, plating, heat treatment, assembly for another party |
9989 | Other manufacturing services; publishing, printing and reproduction | Printing of labels and manuals |
9991 | Public administration services | Licences, fees and levies paid to authorities |
9992 | Education services | Employee training programmes |
9993 | Human health and social care services | Occupational health services |
9994 | Sewage and waste collection, treatment and disposal | Effluent treatment, scrap and waste handling |
9995 | Services of membership organisations | Industry association membership |
9996 | Recreational, cultural and sporting services | Events, sponsorship |
9997 | Other services | Services not classified elsewhere |
General guidance at the four-digit group level. Invoices often need six digits, so confirm the exact code and the GST rate notification before use. Not tax advice.
Service item master clean-up
Optional: we can scan purchase service items in your ERP and flag missing SAC codes.
Optional. The tool and every export work without this. No spam.
How to use the list
Search by the service you buy or sell, such as repair, rent or freight, and read the matching SAC group. Copy the code onto the vendor master, the service purchase order or the sales invoice. Then confirm the six digit code against the GST service code list and the rate notification. Export the list to Excel if you want to attach it to a vendor setup checklist.
Job work is SAC 9988
Many factories send material to a job worker for machining, plating or heat treatment. The job worker invoices for a service, and the service falls under manufacturing services on physical inputs owned by others, SAC 9988. The principal tracks the goods on a delivery challan and an ITC-04 return, while the job worker charges GST only on the job work charge unless the job worker also supplies material. Keep the two flows separate in your ERP.
- Material out on challan, no GST invoice for the principal's own goods
- Job work charge invoiced under SAC 9988
- ITC-04 filed by the principal for goods sent and received
Mistakes to avoid
A common mistake is placing repair and installation under professional services. Machine repair and AMC fall under 9987. Another is using the construction SAC for a machine foundation that is part of a plant installation, which changes the input credit position. Freight bought from a goods transport agency is also an area where the reverse charge rules can apply, so the SAC alone does not tell you who pays the tax.
ERP notes
In SAP the SAC is held as a service master or material master with a service type and the India tax code. In other ERPs it is typically a tax category on a service item. Make sure purchase service items carry the SAC so that your GSTR-2B reconciliation and your reverse charge register can group by it.
Frequently Asked Questions
How many digits does a SAC have?
SAC codes start with 99 and run to six digits. The four-digit group tells you the broad category, and the full six digit code tells you the exact service. Invoices must show the SAC at the digit level required by your turnover and the current notification.
Is job work always SAC 9988?
Job work on goods owned by someone else is generally 9988, although some job work has a special rate in the notification. The rate can differ for specific sectors, so check the current entry and do not assume it is the same as the goods rate.
Where is freight classified?
Transport of goods by road is under 9965, with 996511 for road transport. Supporting services such as loading and warehousing are 9967. The GTA rules and reverse charge can apply, so check who must pay the tax on the invoice you received.
Do I need a SAC for exempt services?
Yes, an exempt or nil rated service still carries its SAC on a tax invoice or bill of supply where reporting is required. The code identifies the service for the return tables and for audits, even when the tax rate is zero.
If you are cleaning up service items and vendor masters before an ERP change, we can help assess the data and automate the checks.
Related Tools
HSN Chapter Guide for Indian Manufacturers
A searchable lookup of the HSN chapters and common 4-digit headings that manufacturing companies in India use on invoices, item masters and GSTR-1 HSN summaries.
Country & TaxGST Blocked Credit (Section 17(5)) Reference for India
A plain-language lookup of the supplies on which input tax credit is blocked under Section 17(5) of the CGST Act, with the main exceptions a factory should know.
Country & TaxGSTR-9 and GSTR-9C Annual Return Preparation Checklist
A step-by-step checklist for assembling the GST annual return and the reconciliation statement for a manufacturing company, from books to portal.
Country & TaxJob Work Challan Register and ITC-04 Worksheet
An editable register of goods sent to job workers with received quantity, balance, days out and an overdue flag for the one-year and three-year limits.
More Country & Tax tools
See all- GST Tax Invoice Format Template for Indian Manufacturers
- Delivery Challan Format Template for Goods Movement in India
- Purchase Order Format Template for Indian Manufacturers
- TDS Deduction Tracker Worksheet for Vendor Payments
- MSME Vendor Payment Due Date Tracker (45 Day Rule)
- GSTR-2B ITC Reconciliation Worksheet (Books vs Portal)
- GST Inclusive and Exclusive Price Calculator
- GST Bill of Supply Format Template India
- GST Export Invoice Under LUT Template India
Keep exploring
Free tools
- India ERP GST Readiness Assessment for ManufacturersTen questions that test whether your ERP handles the main GST workflows for a manufacturer without manual workarounds, with a score and next steps.
- India GST Return Due Dates ReferenceSearchable table of GST returns, who files them and the usual due date, for Indian manufacturers and accountants.
- India Export Documents Reference for ManufacturersA searchable table of the documents Indian exporters commonly prepare or obtain, with issuer, purpose and when each is used.
Guides
- Infor LN Global Tax Configuration for VAT, GST, and Sales TaxConfigure global tax handling in Infor LN including VAT, GST, sales tax, withholding tax, and tax reporting for multi-country compliance with automated returns.
- GPU Buy vs Rent vs Colocation: A Financial Analysis for Enterprise AIGPU buy vs rent vs colocation compared with real 2026 numbers: capex, cloud hourly rates, breakeven utilization, and when each model wins for enterprise AI.
- SyteLine REST API Error Codes and Troubleshooting ReferenceComplete SyteLine REST API error code reference. Diagnose HTTP status codes, IDO error responses, and ION API Gateway errors in CloudSuite Industrial integrations.