Country & TaxFree referencePDF, Excel, Word exportIndia

HSN Code Chapter Guide for Indian Manufacturers

This lookup lists the HSN chapters and common four-digit headings that Indian manufacturers meet most often. Use it to sanity check an item master, speed up GSTR-1 table 12 preparation, or train new accounts staff on where a product family sits.

Download:
ChapterCommon 4-digit headingGoods covered (general)Typical manufacturing use
28
2801 to 2853
Inorganic chemicals
Process chemicals, industrial gases, acids
29
2901 to 2942
Organic chemicals
Solvents, intermediates, specialty chemicals
32
3208, 3209
Paints and varnishes (non-aqueous / aqueous)
Coatings for fabricated products
34
3403
Lubricating preparations
Cutting oils, greases, mould release agents
38
3824
Prepared binders for foundry moulds, other chemical products
Foundry binders, coolants
39
3917, 3923, 3926
Plastic tubes, containers, other plastic articles
Moulded parts, packaging, fittings
40
4009, 4016
Rubber tubes and other rubber articles
Gaskets, seals, hoses
48
4819
Cartons, boxes and cases of paper
Corrugated packaging
68
6804
Grinding stones and wheels
Abrasives for machining
70
7010
Glass containers and closures
Bottles, jars
72
7208, 7210, 7228
Flat-rolled steel, coated steel, alloy bars
Sheet, coil, bar stock for fabrication
73
7318, 7326
Screws, bolts, nuts, other articles of iron or steel
Fasteners, fabricated components
74
7407, 7411
Copper bars and tubes
Busbars, heat exchanger tubes
76
7604, 7606, 7610
Aluminium bars, plates, structures
Extrusions, enclosures
82
8207, 8211
Interchangeable tools, knives
Cutting tool inserts, tooling
83
8302
Base metal mountings and fittings
Hinges, brackets
84
8408, 8413, 8414
Engines, pumps, compressors and fans
Pump sets, blowers
84
8421, 8431
Filtering machinery, parts of lifting machinery
Filters, crane and hoist parts
84
8456 to 8466
Machine tools and their parts and accessories
CNC machines, chucks, tool holders
84
8481, 8483
Taps and valves, transmission shafts, gears
Valves, gearboxes
84
8482
Ball or roller bearings
Bearings
85
8501, 8504
Electric motors, transformers
Motors, power supplies
85
8507
Electric accumulators
Batteries
85
8535, 8536, 8537
Switchgear, connectors, control panels
Panels, relays, connectors
85
8541, 8542
Semiconductor devices, electronic integrated circuits
Diodes, LEDs, ICs
85
8544
Insulated wire, cable and optical fibre cables
Wire harness, fibre optic cable assemblies
85
8517
Telephone sets and communication apparatus
Networking and telecom equipment
85
8537
Boards and panels for electric control
PLC and control cabinets
87
8708
Parts and accessories of motor vehicles
Automotive components
88
8803
Parts of aircraft and spacecraft
Aerospace components
90
9001
Optical fibres and optical fibre bundles, lenses
Optical components
90
9015, 9017, 9024, 9031
Surveying, drawing, testing, measuring and checking instruments
Gauges, CMM, test equipment
94
9403
Other furniture and parts
Metal furniture

General guidance only. Always classify against the current Customs Tariff and the GST rate notification for the exact 6 or 8 digit code, and confirm with your tax adviser. Rates are intentionally not listed because they change by notification.

HSN exception report from your ERP

Optional: we can run a read-only scan of your item master for blank or inconsistent HSN codes.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the guide

Type a product word, a chapter number or a heading into the search box. The result shows the chapter, the common four-digit headings under it and the kind of manufacturing goods they cover. Treat the heading as the starting point, then drill down to the 6 or 8 digit tariff item in the Customs Tariff schedule. Export the filtered rows to Excel to attach to an item master clean-up task or a vendor onboarding pack.

  • Search by product word, chapter or heading
  • Confirm the full tariff item before saving it on the item master
  • Export to Excel for audit working papers

How HSN digits work and what is required

HSN is the Harmonised System of Nomenclature. The first two digits are the chapter, four digits give the heading, six digits the sub-heading and India extends it to eight digits in the Customs Tariff. For GST invoices, the number of digits you must report depends on your aggregate turnover in the previous financial year. Taxpayers with turnover up to Rs 5 crore have used a lower digit requirement than those above it, and the exact figure has been revised by notification. Check the current notification before configuring your ERP.

Common classification mistakes

The most common error is classifying a part by what it is made of rather than by what it is. A bracket for a machine may belong with the machine parts, not with articles of steel. Parts of goods are often classified by the Section and Chapter notes, which override the heading text. Another frequent problem is one HSN code used for a whole product family when the family spans different headings with different tax rates. Review any item with a changed rate for the last twelve months.

  • Read Section and Chapter notes before choosing a heading
  • Do not default every part to the heading of its raw material
  • Re-check HSN after any GST rate notification
  • Keep a record of the reasoning for disputed items

ERP notes

In SAP the HSN or SAC is held as a control code against the material master (the India tax data). In Oracle, Infor, Epicor, Tally and Busy it is usually a field on the item or a tax category. Whatever the system, run a check for blank or short HSN values before filing GSTR-1, because the HSN summary table is built from invoice line data and a blank code produces a validation error on the portal.

Frequently Asked Questions

Does this list give GST rates?

No. Rates are set by notification and change, so a static list would mislead. Use this guide to find the heading, then check the current rate notification or your ERP tax determination for the rate on the exact tariff item.

Is the four-digit heading enough for my invoice?

That depends on your previous year aggregate turnover and on the current notification. Many mid-size and larger manufacturers must report six digits on B2B invoices. Check the latest rule and set the ERP validation to the stricter number to be safe.

Where do I find the full eight digit code?

The eight digit tariff item is in the Customs Tariff schedule published by the CBIC. The GST rate schedules refer to the same headings. Search the tariff by heading, then match your product description to the tariff item text.

What if two headings seem to fit?

Apply the General Rules for the Interpretation of the Harmonised System in order, starting with the heading text and the Section and Chapter notes. If still unclear, a written advance ruling or a classification opinion from your tax adviser protects you.

If your item master has thousands of parts with inconsistent HSN values, we can run a read-only analysis of your ERP data and list the exceptions for your finance team to review.