Heat Exchanger LMTD and Required Surface Area Calculator
Sizing or checking a heat exchanger starts with duty and the log mean temperature difference. Enter the stream temperatures and U, and you get the heat duty, the required surface area and the cold stream flow in one step.
Your numbers
Water to organics in shell and tube is often 250 to 750. Plate exchangers reach higher.
1.0 for pure counter-current. Use the chart value for multi-pass shell and tube.
Your results
Preliminary sizing only. Valid when both temperature differences are positive (no temperature cross for counter-current). Fouling allowance, pressure drop and mechanical design need a full rating.
Required area vs overall U
Sweeps Overall heat transfer coefficient U from 100 to 1500, holding your other inputs fixed.
Connect exchanger cleaning history to performance
Optional: we review how maintenance records can feed performance checks.
Optional. The tool and every export work without this. No spam.
How to use it
Fill in the hot stream flow, specific heat and both temperatures, then the cold inlet and outlet temperatures. Choose an overall heat transfer coefficient based on your fluids and exchanger type, and the correction factor F if the unit is multi-pass. The result gives the area to specify or compare with your existing unit. The chart sweeps U to show how sensitive the area is to fouling.
The equations
Duty Q = m x cp x (T hot in minus T hot out). The two terminal differences for counter-current flow are delta T1 = Thi - Tco and delta T2 = Tho - Tci. LMTD equals (delta T1 minus delta T2) divided by the natural log of their ratio. Area A = Q / (U x F x LMTD). If both differences are equal, LMTD is simply that value, which the calculator handles.
- Counter-current gives the highest LMTD and smallest area
- Co-current flow needs a different delta T definition
- F below about 0.8 signals a poor arrangement
- Add 10 to 25 percent area for fouling where appropriate
Reading the result
With the defaults, the duty is 350 kW and the LMTD about 52 K, so a 500 W/m2.K exchanger needs roughly 13 square metres. If the cold stream flow shown is more than your utility can supply, relax the cold outlet temperature or accept a larger area. Check that both differences stay positive, otherwise the stated outlet temperatures are physically impossible.
- Heat balance: hot duty must equal cold duty
- Check metallurgy for chloride or acid service
- Verify pressure drop against pump capability
- Cleaning intervals drive the real fouling margin
Frequently Asked Questions
Why use LMTD instead of the average temperature difference?
The temperature difference between the streams changes along the exchanger. The log mean is the correct average for constant U and specific heats, and the arithmetic mean overstates it when the two ends differ a lot.
What F factor should I use?
Use 1.0 for pure counter-current or double-pipe units. For multi-pass shell and tube, read F from standard charts using the R and P parameters, or from your rating software, and aim for 0.8 or higher.
How do I choose U?
Use vendor data or past units in similar service. Typical clean values range from about 250 W/m2.K for gas-liquid to over 1000 for water-water in plate exchangers. Include fouling in the effective U.
What if the temperatures cross?
A cold outlet hotter than the hot outlet is not possible in pure counter-current flow only if the second differential turns negative. Here, the second end must remain positive. A cross needs multi-pass analysis and an F correction.
If your equipment register and maintenance plans sit in an ERP, Netray can help tie exchanger cleaning history to performance checks. Ask for a review.
Related Tools
Chemical Reactor Adiabatic Temperature Rise Calculator
Calculate how far a reactor mass heats up if cooling fails, and how much margin remains to the boiling point or decomposition onset.
Maintenance & ReliabilityChemical Transfer Pump Power and Energy Cost Calculator
Size pump power from flow, differential head and fluid density, then estimate yearly electricity cost.
Discrete ManufacturingAgitator Power and Reynolds Number Calculator
Calculate agitator power from power number, speed and diameter, with Reynolds number and kW per cubic metre.
Safety & WorkforceChemical Reactor Pre-Charge Checklist
A pre-start checklist an operator can walk through before charging a batch reactor, with critical items flagged.
More Engineering & PLM tools
See all- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Engineering Change Affected Materials Impact Worksheet
- Cloud MRP BOM Data Cleanup Worksheet
Keep exploring
Free tools
- Welding Heat Input CalculatorCompute arc energy and net heat input from amps, volts, travel speed and process efficiency, and see how speed changes the result.
- Metric Thread Dimensions and Tensile Stress Area CalculatorBasic and design dimensions for an ISO metric thread plus the tensile stress area and breaking load for a given property class.
- Sheet Metal Density and Weight per Area ReferenceDensity and weight per area per millimetre of thickness for steel, stainless, aluminum, copper, brass and titanium sheet.
ERP fixes and how-tos
- Acumatica: How to Make a Field RequiredHow to make a field required in Acumatica using workflow, attributes or a DAC extension, plus honest pros and cons of Acumatica for manufacturers.
- Production version in SAP S/4HANA: how to create it and why it is requiredHow to create and maintain a production version in SAP S/4HANA with C223, how to mass-maintain them, and why production orders and MRP require one.
- Fix Wrong Row Counts When Joining Across OTBI Subject AreasMixing folders from two OTBI subject areas without a real relationship inflates or empties row counts. Learn safe join patterns and when to switch tools.
Guides
- AI-Powered Chemical Manufacturing with Infor M3Optimize Infor M3 for chemical manufacturing with AI. Batch management, formula optimization, regulatory compliance, and yield improvement.
- Scheduling Cold Heading, Thread Rolling and Heat Treat in a Fastener PlantHow fastener plants schedule headers, thread rollers, heat treat and plating: bottlenecks, die changeovers, batch loads, outside processing and capacity checks.
- ERP for Fastener Manufacturers: Cold Heading and Thread RollingWhat fastener manufacturers need from ERP: wire rod heat lots, cold heading and thread rolling routings, heat treat and plating, lot genealogy and certs.
AI on your ERP
- Epicor Kinetic AI for Metal Fabrication: Jobs, Heat Numbers and Outside Processing in Plain EnglishPrivate AI on Epicor Kinetic for metal fabricators: ask about jobs, nests, heat numbers and outside processing in plain English, grounded in live data.
- AI on Infor SyteLine for Metal Fabricators: Quotes, Heat Lots, Routings and Job CostAI on Infor SyteLine for metal fabricators: quote and routing history, remnant and heat-lot traceability, outside processing, and job costing, kept private.
Manufacturing hubs
- Industrial Fasteners Institute (IFI): standards, traceability and ERP for fastener makersIndustrial Fasteners Institute (IFI) ecosystem: fastener standards, lot traceability, heat treat and plating realities, plus ERP, quoting and private AI for makers.
- Aerospace manufacturing in Wichita, KansasGuide to aerospace manufacturing in Wichita, Kansas: anchor OEMs, supplier tiers, NIAR and Kansas MEP resources, AS9100 and ITAR needs, ERP and quoting problems.