India HSN Chapter Guide for Manufacturing Inputs and Products
Most HSN mistakes start with the wrong chapter. This guide lists the chapters Indian manufacturers use most, so you can narrow down a product before looking up the full code in the tariff.
| HSN chapter | Chapter coverage | Typical use in a plant |
|---|---|---|
25 | Salt, sulphur, earths and stone, plastering materials, lime and cement | Cement, lime, sand and stone used in civil work and castings |
27 | Mineral fuels, mineral oils and products of their distillation | Furnace oil, diesel, coal, bitumen |
28 | Inorganic chemicals | Acids, caustic soda, industrial gases, process chemicals |
29 | Organic chemicals | Solvents, intermediates, organic reagents |
32 | Tanning and dyeing extracts, pigments, paints, varnishes, putty and inks | Industrial paints, coatings, printing inks |
34 | Soap, organic surface-active agents, lubricating preparations, waxes | Cutting fluids, lubricating preparations, cleaning agents |
35 | Albuminoidal substances, modified starches, glues and enzymes | Industrial adhesives and glues |
38 | Miscellaneous chemical products | Anti-corrosion preparations, coolants, prepared additives |
39 | Plastics and articles thereof | Moulded parts, plastic sheets, tubes, pipes, packaging film |
40 | Rubber and articles thereof | Seals, gaskets, hoses, belts, tyres |
44 | Wood and articles of wood, wood charcoal | Pallets, crates, wooden packaging |
48 | Paper and paperboard, articles of paper pulp, paper or paperboard | Corrugated boxes, cartons, labels |
52 | Cotton | Cotton yarn and fabric for textile and garment units |
54 | Man-made filaments | Polyester and nylon filament yarn |
55 | Man-made staple fibres | Spun yarn inputs for textile mills |
68 | Articles of stone, plaster, cement, asbestos, mica or similar materials | Grinding wheels, refractory-type articles, cement products |
69 | Ceramic products | Refractory bricks, ceramic insulators |
70 | Glass and glassware | Glass components, fibre glass, sight glasses |
72 | Iron and steel | Ingots, bars, coils, sheets, plates, stainless steel |
73 | Articles of iron or steel | Fasteners, tubes, pipe fittings, springs, castings, structures |
74 | Copper and articles thereof | Copper wire, bus bars, tubes, brass products |
76 | Aluminium and articles thereof | Aluminium extrusions, sheets, die castings, foil |
79 | Zinc and articles thereof | Zinc for galvanising, zinc die castings |
81 | Other base metals, cermets, articles thereof | Titanium, tungsten, magnesium, nickel-class materials |
82 | Tools, implements, cutlery, spoons and forks of base metal | Cutting tools, dies, hand tools, tool bits |
83 | Miscellaneous articles of base metal | Locks, hinges, fittings, brackets |
84 | Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof | Machine tools, pumps, compressors, engines, bearings, parts |
85 | Electrical machinery and equipment and parts; sound and television equipment | Motors, transformers, switchgear, cables, PCBs, batteries, electronics |
86 | Railway or tramway locomotives, rolling stock and track fixtures | Wagons, coaches, railway components |
87 | Vehicles other than railway; parts and accessories | Automotive components, tractors, trailers |
88 | Aircraft, spacecraft and parts thereof | Aerospace components and assemblies |
89 | Ships, boats and floating structures | Marine components, shipbuilding |
90 | Optical, photographic, measuring, checking, precision, medical or surgical instruments | Gauges, meters, sensors, test equipment, medical devices |
91 | Clocks and watches and parts thereof | Timing devices and components |
93 | Arms and ammunition; parts and accessories thereof | Defence manufacturing (licence conditions apply) |
94 | Furniture, bedding, lamps and lighting fittings, prefabricated buildings | Industrial furniture, luminaires, modular buildings |
95 | Toys, games and sports requisites | Toy and sports goods manufacturing |
This is a chapter-level guide only. The full classification needs the 4, 6 or 8 digit code under the General Rules of Interpretation, and GST rates change by notification. Always confirm the rate and code against the current CBIC tariff and GST rate notifications before filing.
Item master HSN audit
Want your ERP item master checked for missing or inconsistent HSN codes? Ask for an optional expert review.
Optional. The tool and every export work without this. No spam.
How to use the chapter guide
Type a material or product word into the search box, for example steel, rubber, motor or paint. The matching chapters appear with their coverage and typical use in a plant. Pick the chapter, then open the CBIC tariff or your GST portal HSN search and drill down to the 4, 6 and 8 digit level. Export the filtered list to Excel if you want to share it with purchase and stores teams who maintain the item master.
- Search by material, product or chapter number
- Use the chapter to start the full code lookup, not to finish it
- Share the Excel export with whoever creates new items in the ERP
How HSN works for GST in India
HSN is the Harmonised System of Nomenclature, an international scheme where the first 2 digits are the chapter, 4 digits the heading, 6 digits the subheading. India extends it to 8 digits in the customs tariff. For GST invoices, the number of digits you must show depends on your aggregate turnover and whether the supply is a B2B or export supply, and the rule has changed over time, so check the latest notification. Classification itself follows the General Rules of Interpretation, which look at the heading text and section and chapter notes first.
Worked example
A plant buys stainless steel hex bolts, stainless steel sheet and an aluminium die casting. The bolts are articles of iron or steel and normally sit in chapter 73. The raw sheet is a flat-rolled product of stainless steel in chapter 72. The die casting could fall under chapter 76 as an article of aluminium, but if it is a recognisable part of a machine, section notes can push it to chapter 84 or 87. This is why the chapter guide is a starting point and the notes are what decide the final code.
Common mistakes
Teams copy a code from a supplier invoice without checking it. Another frequent mistake is classifying a machine part by the material it is made of, when section notes often send parts to the machinery chapters. Mixed or inconsistent HSN for the same item across the item master causes ITC mismatches and notice risk. Fix the item master once, keep a change log and review it when GST rate notifications change.
- Copying the supplier HSN without verifying it
- Classifying parts by material instead of by function
- Using different HSN for the same item in different plants
- Ignoring chapter and section notes
Frequently Asked Questions
What does an HSN code number mean?
The first two digits are the chapter, the next two complete the heading, and the next two give the subheading. India adds two more digits for the 8 digit tariff item. Each level narrows the product description.
How many digits of HSN must I print on a GST invoice?
It depends on your aggregate turnover and whether the supply is B2B or B2C, and the rule has been revised by notification. Check the current CBIC and GST portal instructions, because the thresholds have changed more than once.
Can I rely on this list for the GST rate?
No. This guide shows chapter coverage only and carries no rates. Rates depend on the specific tariff item and are changed by notification, so verify the rate on the current rate schedule or your GST advisor.
Who is responsible if the HSN on my invoice is wrong?
The supplier who issues the invoice is responsible for correct classification. A wrong code can still affect the buyer through ITC mismatches, so buyers should review supplier invoices for obvious classification errors.
If your item master has thousands of items with unverified HSN codes, we can help you audit it directly from ERP data without moving the data off your servers.
Related Tools
ERP Item Master HSN and GST Rate Audit SQL Generator
Enter your item master and invoice line table and column names to get SQL that finds blank HSN codes, wrong digit counts, items with several rates and invoice lines that disagree with the master.
Developer ToolsGSTR-1 HSN Summary Pandas Script Generator
Name the columns in your ERP invoice line export and get a pandas script that rolls them up into an HSN-wise summary with quantity, value, taxable value and taxes.
Country & TaxIndia ERP GST Readiness Assessment for Manufacturers
Ten questions that test whether your ERP handles the main GST workflows for a manufacturer without manual workarounds, with a score and next steps.
More Country & Tax tools
See all- GST Tax Invoice Format Template for Indian Manufacturers
- Delivery Challan Format Template for Goods Movement in India
- Purchase Order Format Template for Indian Manufacturers
- Job Work Challan Register and ITC-04 Worksheet
- TDS Deduction Tracker Worksheet for Vendor Payments
- MSME Vendor Payment Due Date Tracker (45 Day Rule)
- GSTR-2B ITC Reconciliation Worksheet (Books vs Portal)
- GST Inclusive and Exclusive Price Calculator
- GST Bill of Supply Format Template India
Keep exploring
Free tools
- HSN Chapter Guide for Indian ManufacturersA searchable lookup of the HSN chapters and common 4-digit headings that manufacturing companies in India use on invoices, item masters and GSTR-1 HSN summaries.
- India Export Documents Reference for ManufacturersA searchable table of the documents Indian exporters commonly prepare or obtain, with issuer, purpose and when each is used.
- HS Code Sections and Chapters ReferenceFind which HS section and chapter a product family falls in, with notes on the chapters manufacturers classify most often.