Quality & InspectionFree templatePDF, Excel, Word exportAutomotive

IATF 16949 FMEA, Control Plan and PPAP Example Templates

This IATF 16949 example pack links a PFMEA, a control plan and a PPAP element summary for one machined part. Seeing the three documents agree with each other is the fastest way to learn what customers and auditors expect.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

IATF 16949 PFMEA, Control Plan and PPAP Example Pack

Pack header

Supplier: Northgate Machining Ltd Customer: Tier 1 brake systems customer Part: BK-4471-B rev C, Brake caliper piston bore sleeve PPAP level: Level 3

1. Process FMEA extract (AIAG-VDA format)

StepFailure modeEffectSCausePreventionODetectionDAP
OP 30: CNC finish boreBore oversizeSeal leak, loss of braking pressure in assembly test or field9Tool wear or thermal drift not compensatedTool life counter; automatic offset update; scheduled in-process probing4In-process probe on every part; air gauge check every 25 parts; SPC chart3High
OP 30: CNC finish boreBore undersizePiston will not assemble; caught at assembly6Wrong offset after tool changeTool change setup sheet; first piece approval3First piece plus probe3Medium
OP 40: DeburrBurr left at cross holeDebris in brake fluid circuit9Brush wearBrush change interval4Visual 100% with boroscope sample5High

2. Control plan extract

StepCharacteristicSpecMethodSample size and frequencyControl methodReaction plan
OP 30: CNC finish boreBore diameter 25.000 +0.013 / 0 mmPer drawing BK-4471-B rev CIn-process probe, air gauge100% probe; air gauge 1 in 25SPC chart, tool life counterStop machine, contain parts since last good check, adjust offset, 100% sort back to last good gauge check, notify quality
OP 40: DeburrCross hole burr freeNo burr visible at 10xVisual with boroscope5 parts per hourOperator check sheetHold lot, re-deburr, re-inspect

3. PPAP element summary

ElementEvidence for this partStatus
Design recordsCustomer drawing BK-4471-B rev C, ballooned copyComplete
Engineering change documentsECN list since rev BComplete
DFMEACustomer-owned design; supplier has process responsibility onlyNot applicable
Process flow diagramReceiving to shipping, with OP 10 to OP 60Complete
PFMEASection 1 of this packComplete
Control planSection 2 of this packComplete
Measurement system analysisGauge R&R on bore gauge, target under 10% of toleranceComplete
Dimensional resultsFull layout on 5 sample parts, all ballooned characteristicsComplete
Initial process studyCpk on key characteristic from 30 or more consecutive parts, target at or above 1.67 for new processesComplete
Part submission warrantSigned PSWPending signature

Review and approval

Process engineer / Date
Quality engineer / Date
Plant quality manager / Date

Examples are illustrative for a machined part. Ratings must come from your own team using the customer-approved AIAG-VDA scales, and action priority comes from the AP table, not from multiplying S, O and D. Check your customer-specific requirements for PPAP level and capability targets. Do not submit example data as real records.

Connect quality records to your ERP

Optional: a conversation about linking PFMEA, control plan and PPAP records to your ERP data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the pack

Change the part, process step, characteristic and failure mode. The same entries flow into the PFMEA row, the control plan row and the PPAP summary, which keeps the documents consistent. Add more process steps in your editor after export. The example covers one critical bore and one burr risk, but a real pack has a row for every step and every failure mode.

How the three documents connect

The PFMEA says what can go wrong and which controls you rely on. The control plan turns those controls into specific methods, sample sizes and reactions that operators follow. The PPAP shows the evidence that the process actually delivers the characteristic. A high action priority in the PFMEA should always appear as a defined control and a stronger reaction plan in the control plan.

  • Every special or key characteristic in the PFMEA appears in the control plan
  • Every control plan method has a validated measurement system
  • Every PFMEA detection control is something that really runs on the floor
  • Capability study results back up the occurrence rating

AIAG-VDA action priority, not just RPN

The current AIAG-VDA FMEA handbook replaces the old risk priority number with action priority: High, Medium or Low, set from severity, occurrence and detection through a lookup table. A severity 9 failure with moderate occurrence and detection can still be High. Do not rank actions only by multiplying S x O x D. The example shows a High row to demonstrate that a recommended action and a strong reaction plan are expected.

Common mistakes

Auditors and customers repeatedly find the same weaknesses.

  • A PFMEA copied from another part with no link to this process
  • Control plan methods that do not match what operators actually do
  • Detection ratings that assume checks that are not performed
  • Capability studies from too few parts or from non-consecutive parts
  • Forgetting to update the PFMEA and control plan after a process change

Frequently Asked Questions

What is included in a PPAP submission?

A full PPAP has up to 18 elements, from design records and PFMEA to control plan, MSA, dimensional results, capability studies and the part submission warrant. The level you submit decides which are sent and which are kept on file. The customer specifies the level.

Is the example data real?

No. All part numbers, ratings and results are illustrative. Use them for structure and the logic linking the documents, then replace them with your own team's ratings and your own measured data.

Does IATF 16949 require AIAG-VDA FMEA?

IATF 16949 requires FMEA and control plans with customer-specific requirements applied. Many OEMs now expect the AIAG-VDA method. Confirm in your customer-specific requirements which format and rating scales apply to you.

Can I export this to Word or Excel?

Yes. Export to Word, PDF or Excel after filling the fields. The tables export as tables, so you can extend them with more process steps and keep working in your preferred editor.

If your PFMEA, control plan and quality records live in different systems, we can help connect them to your ERP so changes flow through, with the AI layer running on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs