ERP Item Master HSN and GST Rate Audit SQL Generator
Wrong or missing HSN codes in the item master travel into every invoice, GSTR-1 HSN summary and ITC reconciliation. These four queries find the usual problems quickly, without touching data.
Fill in
1. Items with blank HSN
SELECT item_code, item_description FROM item_master WHERE hsn_code IS NULL OR LTRIM(RTRIM(hsn_code)) = '' ORDER BY item_code;
2. HSN shorter than your minimum, or not numeric
SELECT item_code, item_description, hsn_code
FROM item_master
WHERE hsn_code IS NOT NULL
AND (LEN(LTRIM(RTRIM(hsn_code))) < 6
OR hsn_code LIKE '%[^0-9]%')
ORDER BY item_code;3. Same HSN carrying more than one GST rate in the master
SELECT hsn_code, COUNT(DISTINCT gst_rate) AS rate_count,
MIN(gst_rate) AS min_rate, MAX(gst_rate) AS max_rate,
COUNT(*) AS item_count
FROM item_master
WHERE hsn_code IS NOT NULL
GROUP BY hsn_code
HAVING COUNT(DISTINCT gst_rate) > 1
ORDER BY item_count DESC;4. Invoice lines that differ from the item master
SELECT l.item_code, m.hsn_code AS master_hsn, l.hsn_code AS line_hsn,
m.gst_rate AS master_rate, l.gst_rate AS line_rate
FROM sales_invoice_lines l
JOIN item_master m ON m.item_code = l.item_code
WHERE l.hsn_code <> m.hsn_code
OR l.gst_rate <> m.gst_rate;Table and column names are generic. Map them to your own schema, for example your ERP's item and invoice line tables. LEN and LTRIM/RTRIM syntax is for SQL Server; on Oracle use LENGTH and TRIM, and replace the LIKE pattern with REGEXP_LIKE. Run read-only on a reporting copy first.
Item master clean-up support
Optional help running a full item master audit directly from ERP data.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter your own table and column names in the fields. The four queries update with your names. Paste them into your database client against a reporting copy or read-only replica and run them in order. Export each result set to Excel and send it to the master data owner for correction. Start with query 1 and 2, because blanks and short codes are the easiest fixes and remove most of the noise.
- Replace default table names with your own
- Set the minimum digits to match your turnover based HSN rule
- Run on a copy first and keep results as evidence
What each query catches
Query 1 lists items with no HSN at all. Query 2 lists items whose HSN is too short or contains non-numeric characters such as spaces or dots. Query 3 groups items by HSN and flags any HSN carrying more than one GST rate, which is sometimes legitimate if the rate depends on price slabs or conditions, but usually means one record is wrong. Query 4 compares posted invoice lines with the master to show where the line level data drifted from the master.
Worked example
A plant with 12,000 items runs query 2 with a minimum of 6 digits and finds 400 items with 4 digit codes copied from old vendor invoices. Query 3 shows one HSN with rates of 12 and 18 percent across 30 items. Reviewing the 30 items shows 8 were created with the old rate before a notification change. After correction, query 4 against the last quarter's invoices shows which invoices need a credit or debit note review with the GST adviser.
Common mistakes
Do not mass update the master without review, because a rate can legitimately differ for the same HSN under different conditions. Do not run the update on production without a backup and an approval trail. Remember that SQL Server and Oracle syntax differ, so adapt the string functions. Finally, treat the results as a list for review, not as a verdict that every flagged item is wrong.
Frequently Asked Questions
Which database does this SQL work on?
The syntax is SQL Server style with LEN, LTRIM and RTRIM. For Oracle, replace LEN with LENGTH, use TRIM, and use REGEXP_LIKE in place of the LIKE character class. The notes under the generator explain the swaps.
Can I use it on SAP or Oracle EBS tables?
Yes, but you must map the generic names to the real tables and fields in your system. The query shapes remain the same, though SAP stores tax classification in different structures, so confirm the right fields with your functional consultant.
Is it safe to run on production?
The queries are read-only SELECT statements, but heavy joins can still slow a live system. Run them on a reporting copy or off peak hours, and agree access with your database administrator first.
How many HSN digits should the master hold?
At least the digits you are required to show on invoices, which depends on turnover and supply type under current GST notifications. Many plants store 8 digits so they can serve both domestic and export needs.
If you want these checks scheduled inside your ERP with approval workflows and alerts, we can help build that around your data, on your own infrastructure.
Related Tools
India HSN Chapter Guide for Manufacturing Inputs
A searchable list of the HSN chapters most used by Indian manufacturers, with a plain description and typical use. Use it to narrow down the chapter before you look up the full 8-digit code.
Developer ToolsGSTR-1 HSN Summary Pandas Script Generator
Name the columns in your ERP invoice line export and get a pandas script that rolls them up into an HSN-wise summary with quantity, value, taxable value and taxes.
Country & TaxIndia ERP GST Readiness Assessment for Manufacturers
Ten questions that test whether your ERP handles the main GST workflows for a manufacturer without manual workarounds, with a score and next steps.
Country & TaxE-Way Bill Bulk Upload JSON Generator (India)
Fill in the invoice, parties, vehicle and one item line to produce the JSON structure used for bulk generation of e-way bills.
More Developer Tools tools
See all- GSTIN Validator Code Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
Keep exploring
Free tools
- GSTR-1 HSN Summary SQL Query GeneratorProduces SQL for the HSN-wise summary of outward supplies and a data quality check for missing HSN, using table and column names you provide.
- SyteLine SQL Query Generator for Item, Job and Order TablesFill in site, item prefix, job status and date to produce read-only SQL for item master, jobs and open customer order lines.
- GST Tax Invoice Format Template for Indian ManufacturersA fill-in GST tax invoice with the mandatory fields for a manufacturer: GSTIN, HSN, place of supply, taxable value and CGST/SGST/IGST lines.
ERP fixes and how-tos
- How to Create an Item in Oracle EBSCreate an inventory item in Oracle EBS: Master Items form, master organization, templates, attributes, organization assignment, categories and common errors.
- Infor LN Item Group: Setup and MaintenanceHow item groups work in Infor LN: what they control for items, accounting and reporting, the Item Groups session, and a safe way to set up and maintain them.
- How to Create ERP Items from CAD AutomaticallyHow to get part numbers and attributes from CAD or PDM into the ERP item master without retyping, duplicates or missing fields. Practical rules for engineering.
Guides
- How to Set Up Item Master Defaults in Infor SyteLineStep-by-step guide to setting up item master defaults in Infor SyteLine. Configure default planning, costing, and inventory settings for new items.
- Building an ERP Data Quality Framework for ManufacturingAn ERP data quality framework for manufacturers: profiling item and BOM data, six quality dimensions, automated rules, scorecards, and remediation workflows.
- ERP Master Data Cleanup with AI: A Practical GuideClean up ERP master data with AI: duplicate detection, standardization, and a governance model that keeps your item and customer records clean long term.