Free Infor M3 & CloudSuite tools

48 templates, calculators, worksheets and reference tables. Each runs in your browser and exports to PDF, Excel, Word or CSV.

Calculators and simulators

Infor M3 Implementation Effort Estimator

Rule of thumb calculator for M3 implementation effort from scope drivers, with cost, team size and duration, plus a chart by site count.

M3 Safety Stock and Reorder Point Calculator

Work out statistically sound safety stock and reorder point values before you key them into the M3 item/warehouse planning parameters.

M3 Economic Order Quantity (EOQ) Calculator

Find the cost-minimising order quantity and see how ordering and holding costs trade off, before setting order quantity parameters in M3.

M3 Manufacturing Lead Time Calculator

Estimate lead time for a manufacturing order from setup, run, queue and move time, and see how it scales with lot size.

M3 Exponential Smoothing Forecast Calculator (Holt Trend)

Step a Holt level and trend forecast forward one period and see how the smoothing constant changes the result.

M3 Standard Cost Rollup Calculator

Roll up a single-level unit cost and see how lot size changes the setup cost per piece.

M3 MI API Batch Load Time Estimator

Estimate how long a bulk load through M3 APIs will run and how added parallel threads change it, using your own measured response time.

M3 Customer Order Margin and Discount Calculator

Test how stacked discounts, rebates and freight erode margin on a customer order line before you set up price lists and discount models.

M3 Inventory Turnover and Days on Hand Calculator

Calculate inventory turns and days on hand, then see how much working capital a higher target turn rate would release.

VISUAL to CloudSuite Migration Cost Estimator

Estimate a first pass budget for moving from Infor VISUAL to a cloud ERP, with a chart showing how report and customization count drives the total.

Infor M3 AI Assistant Sizing and Value Calculator

Size the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor M3.

Infor M3 BE Upgrade Modification Retrofit Effort Calculator

Size the retrofit of MAK modifications, H5 scripts, MEC maps and custom list APIs plus test cycles for an on-prem M3 BE 13.x upgrade.

Infor M3 ION BOD Message Volume Calculator

Size the BOD volume M3 13.x publishes through ION from your order lines and master data changes, with peak hour load and retention storage.

Infor Factory Track Scanner Device and Wireless Coverage Sizing Calculator

Plan a Factory Track Warehouse Mobility and Time Track rollout: access points, devices with spares, peak transaction load and kiosks for shift change.

Reference tables

Infor M3 Program Reference (MMS001, OIS100, PMS100)

Searchable lookup of frequently used Infor M3 programs by code, area and purpose, so you stop hunting through menus.

Infor M3 Core Database Tables Reference

Look up the main M3 tables, their two-letter column prefix and the key fields you join on. Searchable and exportable.

Infor M3 Field Name Glossary

Searchable list of common M3 field codes and what they mean, useful for MI APIs, reports and mapping documents.

Infor ION BOD Verbs and Nouns Reference for M3

Look up what each ION BOD verb does, common nouns used with M3, and key ION components in plain language.

Infor M3 MI API Program List Reference (MMS200MI, OIS100MI, PPS200MI...)

The M3 MI programs integrations use most, grouped by area, with the M3 program each mirrors, confirmed transaction names, main tables and how to list the rest in MRS001 and MRS002.

Infor M3 Order Status Codes Reference (CO, PO, MO, DO)

Two-digit M3 status codes for customer order header, lines and deliveries that are confirmed in Infor documentation, with the program that sets each and the fields that hold PO and MO status.

Infor M3 H5 Hot Keys and Function Keys Reference

Keyboard shortcuts for M3 programs in the H5 client: function keys, list options, paging, and the Mac setting that makes them work.

Infor M3 OOHEAD and OOLINE Customer Order Columns Reference

Column-level reference for M3 customer order tables OOHEAD and OOLINE and the delivery tables they join to, with keys, joins and the OIS100MI fields that fill them.

Infor M3 Inventory and Allocation Tables Reference (MITBAL, MITLOC, MITALO, MITTRA)

Column-level reference for M3 stock, balance identity, allocation, material plan and transaction tables, with keys, joins and the programs that maintain them.

Infor Factory Track Warehouse Mobility and Time Track Transaction Reference (CSI / SyteLine)

Every common Factory Track Warehouse Mobility transaction for CloudSuite Industrial and SyteLine, with what the user scans, what it does and the usual gotcha.

Checklists