Infor LN AFS (stpapi) Session Automation Script Generator
The Application Function Server (AFS) runs a standard Baan or LN 4GL session without its form, so a program can insert, update and delete records with all of the session's own checks. This generator writes the stpapi calls in the order Infor documents, with error recovery and session cleanup.
Fill in
A 4GL session code, e.g. tcmcs0145m000 (Areas, table tcmcs045).
Header
|****************************************************************************** |* AFS functions driving session tcmcs0145m000 |* Values are passed as strings: use str$() for numbers, etol() for enums |****************************************************************************** #pragma used dll ottstpapihand
Insert
function extern long afs.area.insert(ref string o.mess())
{
long retval
string recover.msg(500)
stpapi.put.field("tcmcs0145m000", "tcmcs045.creg", "EU1")
stpapi.put.field("tcmcs0145m000", "tcmcs045.dsca", "Europe region 1")
retval = stpapi.insert("tcmcs0145m000", true, o.mess)
if not retval then
| ends the update mode of the session after an error
retval = stpapi.recover("tcmcs0145m000", recover.msg)
endif
stpapi.end.session("tcmcs0145m000")
return(isspace(o.mess))
}Update
function extern long afs.area.update(ref string o.mess())
{
long retval
string recover.msg(500)
stpapi.put.field("tcmcs0145m000", "tcmcs045.creg", "EU1")
retval = stpapi.find("tcmcs0145m000", o.mess)
if retval <> 1 then
| 0 = not found or error, 2 = a different record was found
stpapi.end.session("tcmcs0145m000")
return(false)
endif
stpapi.put.field("tcmcs0145m000", "tcmcs045.dsca", "Europe region 1")
retval = stpapi.update("tcmcs0145m000", true, o.mess)
if not retval then
retval = stpapi.recover("tcmcs0145m000", recover.msg)
endif
stpapi.end.session("tcmcs0145m000")
return(isspace(o.mess))
}Delete
function extern long afs.area.delete(ref string o.mess())
{
long retval
string recover.msg(500)
stpapi.put.field("tcmcs0145m000", "tcmcs045.creg", "EU1")
retval = stpapi.find("tcmcs0145m000", o.mess)
if retval <> 1 then
stpapi.end.session("tcmcs0145m000")
return(false)
endif
| do.save must be true for delete
retval = stpapi.delete("tcmcs0145m000", true, o.mess)
if not retval then
retval = stpapi.recover("tcmcs0145m000", recover.msg)
endif
stpapi.end.session("tcmcs0145m000")
return(isspace(o.mess))
}Signatures follow the Infor Integration 6.2 Developer's Guide for Application Function Server: stpapi.put.field(session, field, value), stpapi.find(session, err) returning 0, 1 or 2, stpapi.insert / stpapi.update / stpapi.delete(session, do.save, err) returning 1 on success, stpapi.recover(session, err) and stpapi.end.session(session). Compile with #pragma used dll ottstpapihand or link ottstpapihand. Multi-occurrence and main sessions with a separate detail session (such as sales orders) need stpapi.synchronize.dialog and stpapi.change.view calls; check the guide and the session's own AFS DLL before driving them.
Move an AFS program to BODs or REST
Send us an existing AFS program and your LN version, and we will outline the BOD or REST replacement and the risks.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the session code, the key field and value, and one data field and value, both as table.field names exactly as the session form uses them. The output has one function each for insert, update and delete. Add more stpapi.put.field lines for extra fields, in the order a user would enter them, because AFS runs the session's field logic and a field can depend on one entered earlier. Put the code in a library or 3GL script in your own VRC and call the function from your integration program. Every function returns true when the action succeeded and hands back the error text in o.mess when it did not.
How AFS works
The first stpapi call for a session starts it and creates the field buffer; before.program and the main table and form before sections run at that point. stpapi.put.field only fills the buffer. stpapi.insert then runs the add choice, the field loop with each field's checks and the session's DAL check.property hooks, and with do.save set to true also the update.db choice. If anything fails, the function returns 0 with the message, and stpapi.recover must be called to leave update mode before any other call. stpapi.end.session ends the session and runs its end.program choice. For update and delete, stpapi.find with the key fields makes the record current first.
- AFS library naming: parent session with f after the module, e.g. tcmcsf0145m000
- stpapi.find returns 0 (not found or error), 1 (found) or 2 (a different record found)
- stpapi.delete only supports do.save = true
Worked example
With the defaults the generator drives Areas (tcmcs0145m000), a simple single-occurrence session on table tcmcs045 with the area code creg and description dsca. The insert function puts EU1 and the description, inserts with do.save true and ends the session. The update function puts the key, finds the record, checks for return value 1, changes the description and updates. If you run the insert twice, the second call returns false with the session's duplicate key message in o.mess, which is exactly what a user would see.
Version notes and alternatives
AFS follows UI logic, so a session redesign in a new feature pack can break an AFS program even though the table did not change. Sessions with question boxes need answers set in advance through the AFS functions for questions, and sessions with a main and detail form need dialog synchronization. Infor community answers report that calling standard sessions through AFS is not available in multi-tenant LN Cloud. For new integrations, BODs through ION or the LN REST APIs are the paths Infor develops further; keep AFS for existing on-prem programs and quick internal automation.
Frequently Asked Questions
How do I start an LN session from a program?
With AFS you do not start it explicitly: the first stpapi call that names the session, usually stpapi.put.field, starts it in the background and creates the field buffer. End it with stpapi.end.session when you are done, otherwise the session instance stays active for later calls.
Why does stpapi.insert fail when the same data works in the session?
Usually the field order or a missing field. AFS runs the field checks in the session's order, so a field validated against an earlier one fails if that one is not put first. Questions the session asks also need preset answers. Read the message in the error string and compare with a manual entry.
Do I have to call stpapi.recover after an error?
Yes. After an insert, update or delete fails, call stpapi.recover before any other stpapi call on that session. Otherwise the session stays in update mode, and the later end.session call can still write the record you meant to reject.
Where can I see which AFS steps a session needs?
Look for an existing AFS DLL for the session (the session name with f after the module) and read its functions, such as the ones Infor generates with ttstpcreatdll. The Infor Developer's Guide for Application Function Server lists every stpapi function.
If you want routine LN updates driven from a plain-English request with a human approving each change, we can build that on your own servers on top of AFS or BODs.
Related Tools
Infor LN Inbound Process.SalesOrder BOD XML Template
Generate an OAGIS ProcessSalesOrder BOD skeleton with ApplicationArea, ActionCriteria, a sales order header and order lines for testing LN inbound orders.
Developer ToolsInfor LN ION API OAuth 2.0 REST Call Generator (Python)
Generate a Python script that authenticates with an ION API .ionapi service account file and calls an LN REST or OData service, with clear error handling.
Developer ToolsInfor LN DAL Script Template Generator
Generate a Data Access Layer (DAL) script skeleton for an LN table with object hooks, a field check hook, a mandatory hook and error message handling.
Infor LN & BaanInfor LN Session and Module Code Reference
Searchable list of the Infor LN / Baan package and module codes (tisfc, tdsls, whinh and others) with what each one covers.
More Developer Tools tools
See all- Infor LN 4GL Database Insert/Update Transaction Generator
- Infor LN 4GL Embedded SQL Select Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- Infor LN 4GL Session Script TemplateGenerate a clean Baan / Infor LN 4GL session script skeleton with declaration, field, choice and table I/O sections.
- Infor LN Session Test Script TemplateUAT test script for an LN process or session with prerequisites, numbered steps, expected results and tester sign-off.
- Infor LN Report Script Template GeneratorGenerate a 4GL report script for an LN report with program sections, layout sections, a suppress condition and a running total.
ERP fixes and how-tos
- Baan IV to Infor LN migration checklistPlan a Baan IV to Infor LN move as a re-implementation, not a patch: inventory customizations, convert data, rebuild logic, and run a real parallel test.
- How to Add Users in the Baan / Infor LN GUI (Including Admin Access)Step by step: create a user in Baan or Infor LN with the User Data session, copy from a template, assign roles and authorizations, and what admin access you need.
- How to create a custom session in Infor LN StudioBuild a custom maintenance or overview session in Infor LN Studio from a table, wire up authorization and menus, and deploy it safely through your VRCs.
Guides
- Infor LN Session Programming GuideComplete guide to Infor LN session programming. Session architecture, form design, data handling, and business logic implementation for LN developers.
- Building and Modifying Infor LN Sessions: Developer GuideLearn to create and modify Infor LN sessions including form design, field triggers, choice fields, zoom sessions, and session-to-session communication patterns.
- Baan ERP End of Life: What Are Your Real Options?Baan IV and Baan V are end-of-life. Explore your migration options to Infor LN, CloudSuite, or alternative ERPs with realistic timelines and costs.
Integrations
- How to add AI agents to Baan IV and Baan VHow to add AI agents to Baan IV or Baan V: tool layer over read-only database access and AFS, human approval on writes, and an on-prem model. A practical guide.
- How to build an MCP server for Baan IV and Baan VHow to build a Model Context Protocol server for Baan IV or Baan V: which read-only tools to expose, database or AFS access, auth, transports and audit.