Machine Service Contract Pricing Calculator
Pricing a service contract by gut feel either leaves money on the table or loses the customer. This calculator builds the annual price from the work you expect to do, so you can see how visit counts, failure rates and margin drive the number.
Your numbers
Used only to show the contract as a percent of machine value.
Use your own service history.
Your results
A cost-plus model. It does not price risk of uptime guarantees, response time penalties or remote monitoring costs. Add those separately and validate with your own service history.
Price per machine vs corrective calls per year
Sweeps Corrective calls per machine per year from 0 to 3, holding your other inputs fixed.
Check contract profitability against actuals
Optional review of how field service cost and contract revenue can be compared per customer and per machine in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the number of machines and the preventive plan: visits per year, hours per visit and technicians. Add the loaded cost per technician hour, which should include wages, benefits, vehicle and tools. Then estimate corrective calls per machine per year and hours per call from your service history, and the expected parts consumption. Overhead covers dispatch, service management and tooling. Finally set your gross margin. The price, per-machine fee, monthly fee and percentage of machine price appear immediately.
- Use actual call data, not the warranty design target.
- Separate scheduled visits from corrective work in your records.
- Include travel time as paid hours if technicians are paid for it.
- Test the chart to see how sensitive the price is to failure rate.
The model behind it
Direct cost is preventive labor plus travel, expected corrective labor plus travel, and parts. Overhead is added as a percentage of direct cost. The price is cost divided by one minus margin, which delivers the requested gross margin on price. Expected corrective calls are units times the annual failure rate, which is an average; actual calls vary. For small fleets this variance is large, so quote a risk premium or cap the number of included corrective visits and bill extras at a fixed rate.
Reading the result
A common sanity check is the annual fee as a percentage of the machine sale price. Many industrial machinery service contracts fall in a range of roughly 3 to 10 percent per year, depending on complexity, wear and coverage, but your own figure matters more than a benchmark. If the result is far above what the market accepts, review the structure: fewer included visits, parts billed separately, remote support first, or a tiered offer with basic, standard and premium coverage.
Common mistakes
Underpricing usually comes from three errors: using a wage rate instead of a loaded cost, assuming the machine fails like a new one when it is in its fifth year, and promising response times without costing standby capacity. Another is forgetting that parts prices rise during multi-year contracts, so include indexation clauses. Review each contract's actual cost against its price every year; machines that consistently exceed the model need a repricing or a change in scope.
Frequently Asked Questions
What is a typical gross margin for service contracts?
Many OEM aftermarket organizations aim for higher margins on service than on new equipment, often 30 to 50 percent, but it varies by industry and by what is included. Use the margin your finance team targets and test how sensitive the price is to it.
Should parts be included in the contract?
It depends on how predictable consumption is. Wear parts and consumables can be included with confidence. Expensive random failures are often excluded or capped, because one failure can wipe out the margin on several machines. Be explicit about what is covered.
How do I handle multi-year contracts?
Add an annual price escalator tied to an index and a clause for parts and labor cost changes. Consider that older machines fail more often, so a flat price across five years may be underpriced in later years. Model each year separately when risk is meaningful.
Does this cover uptime guarantees?
No. Uptime guarantees add risk of penalties and require standby technicians, spare parts on site and remote monitoring. Estimate those costs separately and add a risk premium. Without them, price the contract as best-effort response with defined hours and visits.
If you want service contract profitability tracked automatically from field service cost and ERP billing, Netray can help build that reporting on your own data.
Related Tools
OEM Recommended Spare Parts List Template
An editable spare parts list for commissioning and two-year operation with criticality class, supplier, lead time and extended cost.
Industry TemplatesEngineer to Order Machine Quote Worksheet
Line-by-line cost build-up for a one-off machine quote with a risk allowance per line and the resulting price at 20 to 35 percent gross margin.
Costing & FinanceProject Milestone Billing Worksheet for Machine Builders
Plan the payment schedule of a machine project with percent per milestone, retention, tax, cash due and margin by milestone.
Industry TemplatesMachine Installation and Commissioning Checklist
A phase-by-phase checklist for installing and commissioning industrial machinery, from site readiness through power-up, tuning and handover.
More Field Service & Quality tools
See all- Machine Warranty Claim Form Template
- Field Service Automation ROI Calculator
- SLA Compliance & Penalty Calculator
- MTTR Improvement Value Calculator
- Spare Parts Inventory Optimization Calculator
- Warranty Cost Calculator
- Technician Utilization Calculator
- Cost of Quality (COQ) Calculator
- SPC Implementation Readiness Assessment
Keep exploring
Free tools
- Machine Warranty Claim Form TemplateA warranty claim form for machine builders and their customers, capturing serial number, run hours, failure details, parts and the accept or reject decision.
- Field Service Automation ROI CalculatorModel how much extra service margin your team can capture by automating scheduling, dispatch, and work orders, and how fast the software pays for itself.
- Machinery Price from Target Margin and Contingency CalculatorCompute the selling price of a custom machine that still delivers your target margin after contingency, warranty reserve and sales commission.
ERP fixes and how-tos
- Price Book Session in Infor LN: Setup and Order PricingHow price books work in Infor LN sales pricing: where they are maintained, how they link to price lists and order lines, and how to troubleshoot a price not found.
- Infor VISUAL Price Book: How Customer Pricing and Price Breaks Are Set UpHow selling prices, quantity breaks and customer pricing are organized in Infor VISUAL, how to maintain them, and how to find why an order picked a price.
- Additional cost setup in Infor LN, including machine costHow additional costs and machine cost rates are set up in Infor LN costing and how they flow into item cost, operation cost and order cost.
Runs with your ERP
- Infor Service Mobile with Infor SyteLine Field ServiceInfor Service Mobile is a field technician app listed as a CloudSuite Industrial add-on. What it connects to in SyteLine service, setup steps, pitfalls, FAQ.
- Corevist Commerce B2B portal with SAP ECCHow Corevist Commerce connects a B2B ordering portal to SAP ECC for contract pricing, ATP, order tracking and invoices: setup, pitfalls and AI use.
- SAP Field Service Management with SAP Business OneHow SAP Field Service Management, with Coresuite, syncs with SAP Business One service calls and billing: data flows, setup, pitfalls and a private AI layer.
Guides
- Service Contract Management with ERP Billing IntegrationManage service contracts, entitlements, and recurring billing through integrated field service and ERP systems for accurate revenue recognition and SLA tracking.
- ERP for Industrial Machinery Manufacturers: ETO, Configuration, and AftermarketERP for industrial machinery manufacturers: engineer-to-order quoting, configurators, project accounting, aftermarket service parts and field service needs.
- Service Contract Management: Entitlement, Renewals, and Contract ProfitabilityService contract management best practices for manufacturers: entitlement, SLA tiers, renewal automation, profitability, and ASC 606 recognition.
AI on your ERP
- AI for Dynamics 365 Business Central in Industrial Equipment ManufacturingPrivate AI for Business Central machinery builders: ETO project cost, assembly orders, service contracts, warranty and spare parts, answered from live data.
- AI on Infor SyteLine for Industrial Machinery Makers: Configured Orders, Projects and Service PartsAI on Infor SyteLine for industrial machinery manufacturers: configure-to-order BOMs, project cost, spare parts and warranty, private and read-only by default.
Software
- Cetec ERPCetec ERP is a browser-based ERP for electronics manufacturers and distributors. Review its modules, integrations, limits and alternatives before you shortlist.
- MachineMetricsMachineMetrics is a machine monitoring and production analytics platform for discrete manufacturers. See features, integrations, limits and alternatives.