MACRS Property Class and Recovery Period Reference for Manufacturers
Assigning the right MACRS class decides how fast a machine or building is written off for tax. This reference lists each recovery period with the method, convention and the manufacturing assets that usually fall into it.
| Recovery period | Method (general depreciation system) | Convention | Typical examples |
|---|---|---|---|
3-year | 200% declining balance | Half-year or mid-quarter | Tractor units for over-the-road use, certain manufacturing tools in specific asset classes |
5-year | 200% declining balance | Half-year or mid-quarter | Computers and peripheral equipment, automobiles, light trucks, copiers |
5-year | 200% declining balance | Half-year or mid-quarter | Property used in research and experimentation |
7-year | 200% declining balance | Half-year or mid-quarter | Office furniture and fixtures, most production machinery and equipment not assigned another class |
7-year | 200% declining balance | Half-year or mid-quarter | Railroad track, agricultural machinery and equipment |
10-year | 200% declining balance | Half-year or mid-quarter | Vessels, barges, tugs, single purpose agricultural structures |
15-year | 150% declining balance | Half-year or mid-quarter | Land improvements such as fences, roads, sidewalks, parking lots, landscaping |
15-year | Straight line | Half-year or mid-quarter | Qualified improvement property, qualified leasehold and restaurant improvements (current law) |
20-year | 150% declining balance | Half-year or mid-quarter | General purpose farm buildings, municipal sewers |
25-year | Straight line | Mid-month | Water utility property |
27.5-year | Straight line | Mid-month | Residential rental property |
39-year | Straight line | Mid-month | Nonresidential real property such as factories, warehouses and office buildings (building shell) |
Land | Not depreciable | Not applicable | Land itself, including the cost of clearing and grading to acquire it |
Alternative system | Straight line over class life | As applicable | Required for tax-exempt use property, foreign use property and certain listed property |
Recovery periods follow IRS Publication 946 and its asset class tables. A building's cost segregation study can move some components into shorter classes. Special depreciation rules (Section 179 and bonus depreciation) change the timing of the deduction but not the class. Confirm the asset class for your NAICS activity before assigning.
Tax depreciation book review
Optional: we can look at how your ERP fixed asset module carries tax classes and conventions.
Optional. The tool and every export work without this. No spam.
How to use the table
Find the asset in the examples column, then read across for the recovery period, method and convention. Your fixed asset register should carry a separate tax book with the class code, placed in service date and convention, so the depreciation run matches the return. If your asset does not appear, check the asset class tables in Publication 946, which classify by business activity as well as asset type.
Conventions that change the first year
The half-year convention treats all assets as placed in service at mid-year. If more than 40 percent of the year's depreciable basis (excluding real property) is placed in service in the last quarter, the mid-quarter convention applies and the first year deduction falls. Real property uses the mid-month convention instead.
- Half-year: default for personal property
- Mid-quarter: triggered by the 40 percent last-quarter test
- Mid-month: nonresidential and residential real property
- Section 179 amounts are removed before running the 40 percent test
Common mistakes
Plants often depreciate everything on book life and never maintain a tax book, which makes bonus depreciation and Section 179 elections hard to audit later. Another error is putting the whole building into 39-year property when parts qualify as land improvements or qualified improvement property. A cost segregation study, done by qualified engineers, is the usual way to support that split.
Frequently Asked Questions
What MACRS class is most manufacturing machinery?
Most production machinery falls in 7-year property unless its asset class assigns another period. Computers and research property are generally 5-year. Confirm the specific asset class in IRS Publication 946 for your industry, because the activity-based tables can override the general guess.
Are factory buildings 39-year property?
The building shell of a nonresidential factory is 39-year straight line property. Components that are really land improvements or qualified improvement property can be shorter, and a cost segregation study can support that. Land is never depreciable.
Does bonus depreciation change the class?
No. Bonus depreciation and Section 179 change how much you deduct in the first year, not the MACRS recovery period. Any remaining basis is still depreciated over the original class.
Which convention applies to equipment bought in December?
If December purchases push more than 40 percent of the year's depreciable personal property basis into the last quarter, the mid-quarter convention applies to all that year's additions. That gives a much smaller first year deduction for the December items.
If your ERP asset module only carries one depreciation book, Netray can help design a tax book and reporting that ties to the return.
Related Tools
MACRS and Bonus Depreciation Fixed Asset Tax Worksheet
List new machines and estimate first year tax deduction from Section 179 expensing, bonus depreciation and the MACRS first year rate.
Costing & FinanceBonus Depreciation and MACRS First-Year Deduction Calculator
Estimate the year-one federal deduction for a new CNC, press or line using Section 179, bonus depreciation and the MACRS half-year convention.
Compliance & ContractsUS Business Tax Forms for Manufacturers Reference
Plain-language lookup of the IRS and Texas forms a US manufacturing company touches, with what each one is for and who files it.
Costing & FinanceUS Manufacturer Tax Filing Calendar Worksheet
Track federal and Texas tax deadlines, owners and estimated payments in one editable worksheet you can export to Excel.
More Costing & Finance tools
See all- Qualified Research Expense Wage Allocation Worksheet
- Property Tax Abatement NPV Calculator for New Plant Equipment
- Section 174 R&D Expensing vs Amortization Calculator
- Manufacturing Sales Tax Exemption Savings Calculator
- State Income Tax Apportionment Calculator (Single Sales Factor vs Three Factor)
- Employer Payroll Tax Cost per Employee Calculator (FICA, FUTA, SUTA)
- QBI Deduction Calculator for Manufacturers (W-2 Wage and UBIA Limit)
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
Keep exploring
Free tools
- MACRS and Bonus Depreciation Fixed Asset Tax WorksheetList new machines and estimate first year tax deduction from Section 179 expensing, bonus depreciation and the MACRS first year rate.
- Bonus Depreciation and MACRS First-Year Deduction CalculatorEstimate the year-one federal deduction for a new CNC, press or line using Section 179, bonus depreciation and the MACRS half-year convention.
- Metric Bolt Property Class Reference (ISO 898-1)Strength values for the common metric bolt property classes with a computed yield-to-tensile ratio.
ERP fixes and how-tos
- SAP MMPV Period Closing Error: Opening and Closing MM PeriodsHow to open and close MM posting periods with MMPV, MMRV and OMSY, what the MARV table holds, and how to fix MMPV period closing errors in SAP MM.
- MMPV and MMRV in SAP: Which Table, and What They ControlMMPV and MMRV are transactions, not tables. Both read and update table MARV, the MM posting period control record. Learn what each does and how to check periods.
- JD Edwards Fixed Assets: Setup, Depreciation and the Account Ledger FlowHow JD Edwards EnterpriseOne Fixed Assets works: asset master setup, ledger types, depreciation runs and how asset cost and depreciation flow to the general ledger.
Guides
- SyteLine IDO Custom Property and Method CreationCreate custom IDO properties and methods in SyteLine. Property mapping, method signatures, stored procedures, and .NET method development guide.
- SyteLine Fixed Assets Management Configuration GuideConfigure fixed asset management in Infor SyteLine including asset creation, depreciation methods, disposal workflows, and book-tax depreciation tracking.
- SyteLine Database Backup and Recovery StrategyPlan database backup and disaster recovery for Infor SyteLine SQL Server environments. Configure full, differential, and transaction log backup strategies.