MCP and JSON-RPC Error Codes Reference
An MCP server speaks JSON-RPC 2.0, and mixing up protocol errors with tool failures is the most common reason an agent seems confused after something goes wrong. This table separates the two so you can return the right signal.
| Code or signal | Name | Layer | Meaning | Example in an ERP MCP server |
|---|---|---|---|---|
-32700 | Parse error | JSON-RPC | Invalid JSON was received by the server | A client sent a truncated message over the transport |
-32600 | Invalid Request | JSON-RPC | The JSON is not a valid request object | Missing jsonrpc or method member |
-32601 | Method not found | JSON-RPC | The method does not exist or is not available | Client calls a capability the server did not declare |
-32602 | Invalid params | JSON-RPC | Invalid method parameters | tools/call names a tool that is not in the tool list, or arguments fail the schema |
-32603 | Internal error | JSON-RPC | Internal JSON-RPC error in the server | Unhandled exception in the server before a tool result is built |
-32000 to -32099 | Server error range | JSON-RPC | Reserved for implementation defined server errors | Custom code for ERP connection pool exhausted |
-32002 | Resource not found | MCP | Code used by MCP for a resource that cannot be found | resources/read for a document URI that does not exist |
isError: true | Tool execution error | MCP | A tool result with isError set reports a failure the model can see and react to | ERP returned 422 closed period, returned as readable text so the model can explain it |
error object | Protocol error | MCP | A JSON-RPC error response for problems with the request itself, not the tool work | Unknown tool name or malformed arguments |
HTTP 202 | Accepted | Streamable HTTP | Server accepts a notification or response that needs no reply body | Client sends notifications/initialized |
HTTP 400 | Bad Request | Streamable HTTP | Request is invalid at the transport level, for example a missing session header when one is required | Client omits the Mcp-Session-Id header after initialize |
HTTP 404 | Not Found | Streamable HTTP | Session ID is unknown or expired, so the client should start a new session | Server restarted and lost in-memory sessions |
HTTP 405 | Method Not Allowed | Streamable HTTP | Server does not offer a stream for GET on the endpoint | Stateless server that only answers POST |
Mcp-Session-Id | Session header | Streamable HTTP | Header a server may return on initialize and clients must send afterward | Used to bind a conversation to one ERP user context |
MCP-Protocol-Version | Version header | Streamable HTTP | Header clients send after negotiation to state the protocol version in use | Server rejects versions it does not support |
Codes -32700 to -32603 come from the JSON-RPC 2.0 specification. MCP specifics can change between protocol revisions, so confirm details against the revision your SDK implements.
MCP server design review
Optional: share your tool list and we will comment on error handling and permissions.
Optional. The tool and every export work without this. No spam.
How to use it
Find the code or situation you are handling and check the layer column. JSON-RPC rows describe malformed messages and unknown methods. MCP rows describe what happens when a tool runs but the work fails. Streamable HTTP rows cover the transport. Use the ERP example column to map each case to a realistic situation, then apply it to your server's exception handling. Export to Excel for a design review.
Protocol error versus tool error
If the request itself is wrong, such as an unknown tool name or arguments that break the input schema, return a JSON-RPC error. If the request was valid but the ERP refused the work, return a normal tool result with isError set and a plain-language message. This matters because the model sees tool results and can adapt, while protocol errors are usually handled by the client application and may never reach the model in a useful form.
- Unknown tool or bad schema: JSON-RPC error -32602
- ERP says period closed: tool result with isError true
- Server bug before any tool runs: -32603
- Expired HTTP session: 404, client reinitializes
Writing messages the model can use
A tool error should say what happened, what the model can do next and what it must not do. 'Order 41822 is on credit hold, ask the user to release it in the ERP' is better than 'Error 500'. Strip stack traces, connection strings and internal table names before returning text, since the content can be shown to users and stored in conversation logs.
Common mistakes
Developers raise exceptions for ERP business rule failures, so the client shows a generic failure and the model retries blindly. Others return success text that hides the failure. A third mistake is leaking raw SQL errors. Decide a small set of error categories, such as not found, not permitted, validation and temporary, and map every ERP response into them.
Frequently Asked Questions
What does error -32602 mean in MCP?
It is the JSON-RPC Invalid params code. In MCP servers it is commonly used when a tools/call request names an unknown tool or the arguments do not satisfy the tool schema. It signals a problem with the request, not with the ERP work.
When should I use isError instead of a JSON-RPC error?
Use isError in a normal tool result when the tool ran but failed, for example the ERP rejected the transaction. The model receives that text and can react. Use a JSON-RPC error when the request itself is invalid.
Why does my MCP client get 404 after the server restarts?
With Streamable HTTP, a server that tracks sessions returns 404 for a session ID it no longer knows. The client is expected to start a new session with an initialize request. Servers that keep sessions only in memory lose them on restart.
Can I define my own JSON-RPC error codes?
Yes, the range -32000 to -32099 is reserved for implementation defined server errors. Keep a documented list, map each to a clear message, and avoid reusing codes the specification already defines.
Netray builds MCP servers and agents on top of ERP data with read-only defaults and clear error behavior. We can review your server design if you want a second opinion.
Related Tools
HTTP Status Codes for ERP API Agents Reference
Look up an HTTP status code and see what it usually means on an ERP API and whether an agent should retry, fix the request or escalate.
Developer ToolsERP MCP Server Python Tool Skeleton Generator
Get a runnable Python MCP server with one read-only ERP lookup tool, argument validation and errors that the model can understand.
Developer ToolsERP Agent API Integration Readiness Assessment
Answer ten questions about APIs, roles, limits and logging to see whether your ERP is ready for an AI agent or MCP integration.
Developer ToolsAgent SQL Read-Only Guard Python Generator
Add a first line of defense before agent-written SQL reaches an ERP database: single statement, SELECT only, allow-listed tables and a row cap.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- WhatsApp Cloud API Error Codes ReferenceA searchable lookup of common WhatsApp Business Cloud API error codes, what they mean and the first thing to check.
- SAP HANA SQL Error Codes ReferenceSearchable table of common SAP HANA 2.0 SQL error codes with the error text, typical cause, the view or trace to check first and the fix.
- ERP MCP Server Python Tool Skeleton GeneratorGet a runnable Python MCP server with one read-only ERP lookup tool, argument validation and errors that the model can understand.
ERP fixes and how-tos
- Odoo External API: Authenticate and search_read with XML-RPC and JSON-RPCHow to call the Odoo external API with XML-RPC or JSON-RPC: authenticate, API keys, search_read, create and write, plus why authenticate returns False.
- SyteLine error -30006: how to find the real causeHow to find the real cause behind SyteLine error -30006 and other numbered messages: details dialog, message logs, server logs and SQL, in a repeatable order.
- Private AI Layer for SyteLine On-Prem: Reference ArchitectureReference architecture to add a private AI assistant to SyteLine on-prem: data access paths, retrieval, permissions, sizing and rollout, no cloud needed.
Guides
- SyteLine REST API Error Codes and Troubleshooting ReferenceComplete SyteLine REST API error code reference. Diagnose HTTP status codes, IDO error responses, and ION API Gateway errors in CloudSuite Industrial integrations.
- MCP Enterprise Integration: Servers, Auth, and Tool GovernanceA practical guide to enterprise MCP integration: server architecture, authentication, and governing which tools an AI agent is allowed to call.
- Troubleshooting SyteLine IDO ErrorsTroubleshoot SyteLine IDO errors: read the full error stack, identify the error family, enable IDO Runtime tracing, and fix extension class failures.
AI on your ERP
- JD Edwards MCP Server: Exposing EnterpriseOne to AI Agents SafelyBuild an MCP server for JD Edwards EnterpriseOne: expose AIS data services and Orchestrator as governed AI agent tools, with security, approval and audit.
- An MCP Server for SAP: Giving AI Agents Safe, Governed Access to ECC and S/4HANAHow to build an MCP server for SAP so AI agents read ECC and S/4HANA safely: OData and BAPI tools, per-user auth, read-only defaults, gated write tools.
Integrations
- How to build an MCP server for Infor LNHow to build a Model Context Protocol server for Infor LN: which read-only tools to expose, auth through ION API, stdio versus HTTP, permission scoping and audit.
- How to build an MCP server for SAP Business OneBuild a Model Context Protocol server for SAP Business One: tools to expose, Service Layer auth, stdio versus HTTP, permission scoping and audit logging.