Engineering & PLMFree referencePDF, Excel, Word export

Metal Density Reference Table (g/cm3, kg/m3, lb/in3)

Density is the first number you need for any weight, freight or material cost estimate. This table lists nominal densities for the steels, stainless grades, aluminum alloys, copper alloys, titanium and nickel alloys that machine shops and buyers handle most.

Download:
MaterialFamilyDensity g/cm3Density kg/m3Density lb/in3Note
Carbon steel (general)
Steel
7.85
7850
0.284
Default for plate, bar, tube
Alloy steel 4140 / 4340
Steel
7.85
7850
0.284
Same as carbon steel for weight work
Tool steel D2
Steel
7.70
7700
0.278
High chromium raises alloy content, lowers density
Tool steel H13
Steel
7.80
7800
0.282
Hot work die steel
Stainless 304 / 304L
Stainless
7.93
7930
0.286
Austenitic
Stainless 316 / 316L
Stainless
8.00
8000
0.289
Austenitic, molybdenum bearing
Stainless 430
Stainless
7.70
7700
0.278
Ferritic
Stainless 410
Stainless
7.74
7740
0.280
Martensitic
Stainless 17-4 PH
Stainless
7.78
7780
0.281
Precipitation hardening
Duplex 2205
Stainless
7.80
7800
0.282
Ferritic-austenitic
Grey cast iron
Cast iron
7.20
7200
0.260
Range roughly 6.9 to 7.3
Ductile iron
Cast iron
7.10
7100
0.256
Range roughly 7.0 to 7.2
Aluminum 1100
Aluminum
2.71
2710
0.098
Commercially pure
Aluminum 5052
Aluminum
2.68
2680
0.097
Sheet, marine
Aluminum 6061
Aluminum
2.70
2700
0.098
General structural
Aluminum 7075
Aluminum
2.81
2810
0.102
High strength aerospace
Copper (C11000)
Copper alloy
8.96
8960
0.324
Electrical tough pitch
Brass (C36000 free-cutting)
Copper alloy
8.50
8500
0.307
Screw machine stock
Bronze (C93200 bearing)
Copper alloy
7.60
7600
0.275
Leaded tin bronze
Titanium Grade 2
Titanium
4.51
4510
0.163
Commercially pure
Titanium Grade 5 (Ti-6Al-4V)
Titanium
4.43
4430
0.160
Aerospace workhorse
Inconel 718
Nickel alloy
8.19
8190
0.296
Superalloy
Inconel 625
Nickel alloy
8.44
8440
0.305
Corrosion resistant superalloy
Monel 400
Nickel alloy
8.80
8800
0.318
Nickel copper
Magnesium AZ31B
Magnesium
1.77
1770
0.064
Lightest structural metal here
Zinc (die cast ZAMAK 3)
Zinc
6.60
6600
0.238
Die casting
Lead
Lead
11.34
11340
0.410
Shielding, ballast
Tungsten
Refractory
19.25
19250
0.695
Counterweights, tooling

Values are nominal handbook figures rounded for weight estimating. Casting, porosity, temper and exact chemistry shift real density by a small amount. Use the certificate value when mass matters.

Material master cleanup review

Optional: send us a sample of your item weights and we will flag likely unit and density errors.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Type a material or family into the search box, for example 316, aluminum or titanium. Read the density in the unit your calculation needs: g/cm3 for dimension-in-mm formulas, kg/m3 for SI work, or lb/in3 for US customary drawings. Export the filtered table to Excel or CSV if you want to paste densities into an item master, costing sheet or estimating workbook.

  • g/cm3 times 1000 gives kg/m3
  • g/cm3 times 0.036127 gives lb/in3
  • lb/in3 times 27.68 gives g/cm3
  • Search by family to compare alternatives

Where the numbers come from

Figures are standard handbook values, the same ones you see in producer datasheets and engineering references. Carbon and alloy steels cluster around 7.85 g/cm3. Austenitic stainless is slightly heavier because of nickel and molybdenum, while ferritic grades are lighter. Aluminum alloys range from about 2.66 to 2.84 g/cm3 depending on copper and zinc content. Densities are given at room temperature.

Reading the result in practice

A 1 m long 50 mm round bar weighs about 15.4 kg in carbon steel, 15.6 kg in 304 and 5.3 kg in 6061 aluminum. The spread between steel and stainless is only about 1 percent, so many shops use one steel density for both when estimating, but the difference matters when you invoice by weight or ship near a truck limit. For titanium and aluminum, always use the specific alloy value.

Common mistakes

People often pick the density of pure metal for an alloy, confuse lb/in3 with lb/ft3, or use a casting density for wrought stock. Another frequent mistake is storing weight in an ERP without recording the unit of measure and density basis, so later users cannot tell whether the figure is theoretical or weighed.

  • Pure copper is heavier than most brasses and bronzes
  • Cast iron varies more than wrought steel
  • Hot-rolled and cold-drawn bar have the same density
  • Record the source of weights in your item master notes

Frequently Asked Questions

What is the density of steel in kg/m3?

Carbon and low alloy steel are taken as 7850 kg/m3, which is 7.85 g/cm3 or 0.284 lb/in3. Stainless steels run from about 7700 to 8000 kg/m3 depending on the grade.

How much lighter is aluminum than steel?

Aluminum alloys at about 2.7 g/cm3 are roughly one third the density of steel at 7.85 g/cm3. For the same volume, aluminum weighs about 34 percent of steel, though strength differences usually change the design volume.

Does density change with heat treatment?

Only very slightly. Heat treatment changes microstructure and can alter density by a fraction of a percent, which is below the tolerance of normal weight estimating. Chemistry and porosity matter far more.

Which unit should I store in my ERP?

Store the unit your ERP base unit of measure needs, typically kg or lb per piece, and keep density only in a costing sheet. Weight per unit drives freight and costing, while density is a calculation input.

If you maintain material weights across thousands of ERP items, Netray can help automate a read-only check against these densities. Ask for a scoping call.