NetSuite Custom Field Specification Worksheet
Custom fields multiply quietly. Without a spec, the same idea gets built three times under different IDs. This worksheet lets an admin or developer plan every field in one table, agree it with the business owner, and export to Excel as the build list.
| Field label | Field ID | Field family | Type | Applies to | Populated by | Mandatory | Business owner | |
|---|---|---|---|---|---|---|---|---|
NetSuite prefixes script IDs by field family: custentity, custbody, custcol, custitem and custrecord. Keep IDs short, lowercase and stable because scripts, saved searches and integrations reference them. Confirm the type options against your account, since available types depend on the field family.
Keep the spec and account in sync
Optional: ask how a read-only metadata view of your NetSuite account could keep documentation current.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add one row per field. Fill the label first, then choose the field family because that decides the ID prefix and where the field can appear. Record who owns the field and how it is populated. A field filled by a script or integration needs a different review from one users type in. Export to Excel and use it as the checklist while you create the fields, then keep it as your data dictionary.
- One row per field per family
- Record the source so you know what breaks when an integration changes
- Name a business owner for every field
- Mark mandatory fields carefully, since they affect imports and integrations
Naming and ID conventions
NetSuite builds the full ID from a prefix and the suffix you type, for example custbody_contract_ref. Pick a team convention before you build: lowercase, underscores, no abbreviations that only one person understands, and no dates or version numbers. Scripts and saved searches refer to the ID, so renaming later is expensive. Use the label for the human wording and keep the ID about the data.
Common mistakes
The usual problems are creating a free-form text field where a list would enforce clean data, making a field mandatory and then breaking CSV imports or web service integrations that do not send it, and applying a field to every record type when only one needs it. Also check whether a standard field or an existing custom field already holds the information before building another.
- Free text where a list or record type would prevent typos
- Mandatory fields that block integrations
- Applying fields to all subsidiaries or roles by default
- Duplicate fields with similar labels
Frequently Asked Questions
What are the custbody, custcol and custentity prefixes?
They are the ID prefixes NetSuite uses for custom transaction body fields, transaction column fields and entity fields. Item fields use custitem and custom record fields use custrecord. The prefix is added for you when you save the field.
Can I change a field ID later?
You can edit the suffix in many cases, but scripts, saved searches, workflows and integrations that reference the old ID will break. Treat the ID as permanent and plan it in a spec like this one before creating the field.
Should I use a list or free text?
Use a list or record type when the value comes from a controlled set, because it prevents typos and supports filtering. Use free text only for genuinely open values such as a customer reference number.
Does this replace the account's field list?
No. It is a planning and documentation tool. The account remains the source of truth, so reconcile the worksheet against the custom field list in NetSuite periodically.
If you maintain hundreds of custom fields, Netray can help build a read-only view over your account metadata so the spec and the account stay in sync.
Related Tools
NetSuite Integration Field Mapping Worksheet
Map source system fields to NetSuite fields with transforms, defaults and validation notes, and export the table to Excel for the build team.
NetSuiteSuiteScript Technical Design Document Template
Fill in a technical design document for a SuiteScript customization and export it as PDF or Word for sign-off before you write code.
NetSuiteNetSuite Script Deployment Inventory Worksheet
Keep an inventory of every SuiteScript and deployment with its owner, status and review date, and export it to Excel.
NetSuiteNetSuite RESTlet API Specification Template
Document a RESTlet endpoint with methods, payloads, authentication and errors so integration partners can build against it, and export to PDF or Word.
More NetSuite tools
See all- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
- NetSuite User Access Request Form Template
- NetSuite Custom Record Design Spec Template
- NetSuite SuiteScript Deployment Handover Template
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- NetSuite Integration Field Mapping WorksheetMap source system fields to NetSuite fields with transforms, defaults and validation notes, and export the table to Excel for the build team.
- NetSuite RESTlet API Specification TemplateDocument a RESTlet endpoint with methods, payloads, authentication and errors so integration partners can build against it, and export to PDF or Word.
- NetSuite Script Deployment Fields and Status ReferenceWhat each field on a Script Deployment record does, which script types have it, and the setting to use for testing and for production.
ERP fixes and how-tos
- How to Create a Custom Record Type in NetSuiteCreate a NetSuite custom record type: Customization > Lists, Records, & Fields > Record Types, script IDs, permissions, sublists and saved searches.
- How to use formula fields in a NetSuite saved searchHow to build formula (text), formula (numeric) and formula (date) fields in a NetSuite saved search, with CASE WHEN, DECODE and NVL examples that actually work.
- NetSuite Quality Management: Incoming Inspection and QuarantineNetSuite has no full QMS, but inventory status, workflows and custom records give incoming inspection, quarantine and NCR tracking. Setup steps and limits.
Runs with your ERP
- NetSuite Field Service Management (formerly NextService) for equipment manufacturersWhat NetSuite Field Service Management, formerly NextService, offers equipment makers: scheduling, dispatch, mobile app, asset history and work orders, plus setup tips.
- NetSuite Quality Management SuiteApp: inspections and nonconformanceWhat the NetSuite Quality Management SuiteApp does: inspection specs, queues, sampling and nonconformance workflows. Setup, pitfalls, alternatives and AI uses.
- NetSuite SuiteCommerce B2B for manufacturers: a portal on native NetSuite recordsWhat NetSuite SuiteCommerce B2B does for manufacturers: account pricing, catalogs, terms and role-based ordering on native NetSuite records, plus setup and pitfalls.
AI on your ERP
- Is Your NetSuite Data Ready for AI? A Practical Readiness Check for Admins and ControllersHow to get NetSuite data ready for AI assistants and agents: custom fields, saved search sprawl, duplicate items and customers, segments, roles, definitions.
- NetSuite Agentic AI: SuiteAgents, Connector Agents and When to Build Your OwnNetSuite agentic AI explained: what SuiteAgents and connector-based agents can do, where approvals belong, and when a custom NetSuite AI agent is worth it.
Integrations
- How to use ChatGPT with Oracle NetSuiteConnect ChatGPT to Oracle NetSuite: custom GPT actions, exports versus live access, enterprise data controls, and when a private model is the safer choice.
- How to build a mobile app for Oracle NetSuiteBuild or choose a mobile app for Oracle NetSuite: barcode scanning, receiving, inventory moves and labor reporting over RESTlets and SuiteTalk REST, with offline limits.