SuiteScript Technical Design Document Template
A technical design document is the cheapest place to find a bad customization. This template gives NetSuite developers and consultants a consistent structure for describing a SuiteScript change before any code exists. Fill the fields and export a clean PDF or Word file for sign-off.
Fill in
SuiteScript Technical Design Document Template
TDD-014: Auto-set sales order ship date from item lead time
Company: Acme Precision Ltd Author: R. Mehta Date: 2026-10-20 SuiteScript version: 2.1 Script type: User Event Records touched: Sales Order, Item
1. Business requirement
When a sales order is saved, the expected ship date on each line should be set from the item's lead time plus the customer's transit days, so planners stop keying dates by hand.
2. Trigger and entry points
beforeSubmit on create and edit of Sales Order. Skipped when the context is CSV import or when the order status is Closed.
3. Processing logic
1. Load each line item's lead time custom field. 2. Add customer transit days from the entity record. 3. Write the result to the line's expected ship date. 4. Log a summary at Audit level.
4. Governance and performance
No record loads inside the line loop. Item lead times are read with one search before the loop. Expected usage well under the user event limit.
5. Error handling and logging
Wrap in try/catch. On failure log at Error level with the order internal ID and allow the save to continue so users are not blocked.
6. Script and deployment records
| Item | Value |
|---|---|
| Script ID | customscript_ |
| Deployment ID | customdeploy_ |
| Applies to | Sales Order, Item |
| Execute as role | |
| Audience / status | Testing |
| Log level | Debug in sandbox, Audit in production |
7. Test approach
Sandbox unit cases for create, edit, multi-line, zero lead time, missing transit days, and CSV import. Regression on order approval workflow.
Approvals
This is a starting structure, not a standard. Adjust sections to your change-control process. Keep script IDs consistent between sandbox and production so SDF or bundle deployments do not create duplicates.
Draft design docs from your scripts
Optional: talk to us about generating first-draft documentation from your existing scripts and saved searches.
Optional. The tool and every export work without this. No spam.
How to use the template
Start with the business requirement in the words the requester used, then restate it as a trigger, a set of records and a processing sequence. Pick the script type deliberately: user event for record-save logic, client script for form behavior, scheduled or map/reduce for batch work, RESTlet or Suitelet for endpoints and custom pages. Export the document, attach it to the project ticket and get the functional owner to sign it before development starts.
- Write the requirement as one sentence a user would recognize
- Name every record type and custom field read or written
- State which execution contexts the script must skip, such as CSV import
- List what happens when the script fails
Why governance and error handling are in the design
Most production SuiteScript incidents come from two gaps: scripts that run out of governance units or concurrency on large volumes, and scripts that throw errors that block users from saving a record. Writing the governance approach and the failure behavior down forces the question early. A user event that can block a sales order save deserves a different answer from a nightly scheduled script that can simply retry.
Common mistakes
Teams often skip the deployment details and then discover that the script runs for every role, in every context, including integrations. Define the execution role, audience and status, and decide how you will deploy between accounts, for example with SuiteCloud Development Framework projects or a bundle. Also record the log level you want in production, since debug logging at volume is slow and noisy.
- No context filter, so imports and integrations trigger the script
- Record loads inside loops with no governance estimate
- Hard-coded internal IDs that differ between sandbox and production
- No rollback plan for data the script changes
Frequently Asked Questions
Do I need a design document for small scripts?
Not always a full one. For a small client script a half page covering trigger, records and failure behavior is enough. For anything that writes data on save, runs in batch or exposes an endpoint, the structured version pays for itself during review and support.
Which SuiteScript version should I choose?
SuiteScript 2.1 is the current language version and supports modern JavaScript syntax. Existing 2.0 scripts keep working. Choose 2.1 for new work unless a bundle or customer standard requires otherwise, and record the choice in the document.
Can I export this to Word?
Yes. Every template on this site exports to PDF and Word, so you can paste it into your change-control system or edit it further. Your entries stay in the browser and are not sent anywhere.
Who should sign the document?
At minimum the developer, the functional consultant or admin who owns the requirement, and a reviewer. Add the business owner when the script changes financial postings, approvals or customer-facing documents.
If you would rather generate first drafts of these documents from your existing scripts and saved searches, Netray can help build that against your own account.
Related Tools
NetSuite Script Deployment Inventory Worksheet
Keep an inventory of every SuiteScript and deployment with its owner, status and review date, and export it to Excel.
NetSuiteSuiteScript Code Review Checklist
A practical review checklist for SuiteScript 2.x covering structure, governance, error handling, security and deployment.
NetSuiteNetSuite Sandbox to Production Deployment Runbook Template
Plan a NetSuite release with scope, deployment steps, validation and rollback in one runbook, and export it as PDF or Word.
NetSuiteNetSuite RESTlet API Specification Template
Document a RESTlet endpoint with methods, payloads, authentication and errors so integration partners can build against it, and export to PDF or Word.
More NetSuite tools
See all- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
- NetSuite User Access Request Form Template
- NetSuite Custom Record Design Spec Template
- NetSuite SuiteScript Deployment Handover Template
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- SuiteScript Code Review ChecklistA practical review checklist for SuiteScript 2.x covering structure, governance, error handling, security and deployment.
- NetSuite SuiteScript Deployment Handover TemplateA handover document for a SuiteScript customization: what it does, where it is deployed, dependencies, how to roll it back and who supports it.
- NetSuite SuiteScript Governance Units by Script TypeA lookup of governance unit limits for each SuiteScript script type and the design guidance that follows from them.
ERP fixes and how-tos
- NetSuite workflow customization: how to build a workflow with SuiteFlowNetSuite workflow customization step by step: record type, trigger, states, transitions, actions, custom action scripts, when to use SuiteScript instead, and why workflows silently do not fire.
- Fix NetSuite SSS_USAGE_LIMIT_EXCEEDED ErrorSSS_USAGE_LIMIT_EXCEEDED means your SuiteScript ran out of governance units. Learn the cause, how to check usage, and fixes using submitFields and Map/Reduce.
- Fix NetSuite CANNOT_CONVERT ErrorCANNOT_CONVERT means SuiteScript could not coerce a value into a field's expected data type. Learn the common setValue and format.parse causes and the fix.
AI on your ERP
- SuiteScript N/llm: Building Generative AI Inside NetSuite, and Knowing Its LimitsHow the SuiteScript N/llm module works: generateText, evaluatePrompt, embeddings, document grounding, free usage limits, OCI billing and when to go external.
- AI for NetSuite, Beyond the Built-In Text ToolsNetSuite's built-in AI covers text generation, not grounded answers on your own data. See how a private LLM over SuiteQL adds real Q&A and controls.
Integrations
- How to add WhatsApp to Oracle NetSuiteHow to connect WhatsApp Business to Oracle NetSuite: SuiteScript triggers, RESTlets, template messages, opt-in rules and two-way replies that post back to records.
- How to integrate Microsoft Teams with Oracle NetSuiteConnect Oracle NetSuite to Microsoft Teams: approval cards, alerts, bots and Entra ID sign-in using SuiteScript, RESTlets and Power Automate or Bot Framework.