NetSuite SuiteQL BUILTIN Functions Reference
Oracle documents exactly ten BUILTIN functions for SuiteQL; this table gives each one with its parameters in order, an example you can paste and the allowed values. Below them are the Oracle SQL functions developers use most in SuiteQL queries.
| Group | Function | Purpose | Signature (parameters in order) | Example | Returns | Notes |
|---|---|---|---|---|---|---|
BUILTIN | BUILTIN.CF | Criteria value of a field with combined values, such as transaction status | BUILTIN.CF(field) | WHERE BUILTIN.CF(t.status) = 'SalesOrd:B' | Type and status combined, for example 'CustInvc:B' | Oracle says to use it in filters on composite key fields to avoid wrong results. |
BUILTIN | BUILTIN.CONSOLIDATE | Convert an amount to a target subsidiary currency using consolidation rates | BUILTIN.CONSOLIDATE(amount_field, view_type, consolidation_rate_type, subsidiary_rate_type, target_subsidiary, period, book) | BUILTIN.CONSOLIDATE(tal.amount, 'LEDGER', 'DEFAULT', 'DEFAULT', 1, t.postingperiod, 'DEFAULT') | Converted amount | view_type 'LEDGER' or 'INCOME'. Rate type 'DEFAULT', 'STANDARD' or 'BUDGET'. Subsidiary rate 'DEFAULT', 'CURRENT', 'HISTORICAL', 'AVERAGE' or an expression. Book 'DEFAULT' or an expression. |
BUILTIN | BUILTIN.CURRENCY | Return the currency code of an amount | BUILTIN.CURRENCY(amount) | BUILTIN.CURRENCY(BUILTIN.CONSOLIDATE(tal.amount, 'INCOME', 'DEFAULT', 'DEFAULT', 1, t.postingperiod, 'DEFAULT')) | Currency code | Accepts amount, SUM(amount), BUILTIN.CONSOLIDATE or BUILTIN.CURRENCY_CONVERT and their SUM. |
BUILTIN | BUILTIN.CURRENCY_CONVERT | Convert an amount to a target currency using the exchange rate effective on a date | BUILTIN.CURRENCY_CONVERT(amount_field [, target_currency_id [, rate_date]]) | BUILTIN.CURRENCY_CONVERT(tl.foreignamount, 1, TO_DATE('2026-09-30', 'YYYY-MM-DD')) | Converted amount | Target defaults to the subsidiary currency; rate date defaults to today, so pass the transaction date for historic reports. |
BUILTIN | BUILTIN.DF | Display value of a reference field without joining the target table | BUILTIN.DF(field) | SELECT BUILTIN.DF(t.status), BUILTIN.DF(tl.item) FROM transaction t JOIN transactionline tl ON tl.transaction = t.id | Display text | The function you will use most. Works on list, record and status fields, including custom ones. |
BUILTIN | BUILTIN.HIERARCHY | Full hierarchical path of a value such as a parent item, department or account | BUILTIN.HIERARCHY(hierarchical_field, expansion_type) | SELECT id, parent, BUILTIN.HIERARCHY(parent, 'DISPLAY_JOINED') FROM item | Path as ids, names or level depending on expansion type | 'DISPLAY_JOINED' returns the joined name path. Other expansion types return ids or the level; take the exact list from the BUILTIN.HIERARCHY help page for your release. |
BUILTIN | BUILTIN.MNFILTER | Filter on a multiple-select field | BUILTIN.MNFILTER(relationship_field, operator, display_field_or_empty, case_sensitive, value) | WHERE BUILTIN.MNFILTER(role.accessprofiles, 'MN_INCLUDE', '', 'TRUE', '-2') = 'T' | Used as a T/F test in WHERE | Operators: 'MN_INCLUDE', 'MN_INCLUDE_ALL', 'MN_INCLUDE_EXACTLY', 'MN_EXCLUDE', 'MN_EXCLUDE_ALL', 'MN_EXCLUDE_EXACTLY'. Third argument 'DF' to filter on display text, '' to filter on ids. |
BUILTIN | BUILTIN.NAMED_GROUP | Records that belong to the current user: me or mine | BUILTIN.NAMED_GROUP(record_type, workgroup) | SELECT * FROM subsidiary WHERE id IN BUILTIN.NAMED_GROUP('subsidiary', 'mine') | A set of ids for an IN clause | 'me' for entity types (employee, customer, vendor, partner); 'mine' for classification, department, location and subsidiary. |
BUILTIN | BUILTIN.PERIOD | Accounting periods for a relative period range, as an IN sub-select | BUILTIN.PERIOD(range_id, range_type, adjustment, operator) | WHERE t.postingperiod IN BUILTIN.PERIOD('LFY', 'START', 'ALL', 'BETWEEN') | Contents of an IN predicate (period ids) | range_type 'START' or 'END'; adjustment 'NOT_LAST' or 'ALL'; operator 'BETWEEN', 'NOT BETWEEN', '<', '<=', '>', '>='. Range IDs come from the query.RelativeDateRange list. |
BUILTIN | BUILTIN.RELATIVE_RANGES | Start or end date of a relative date range such as last fiscal year | BUILTIN.RELATIVE_RANGES(range_id, range_type [, date_flag]) | WHERE t.trandate >= BUILTIN.RELATIVE_RANGES('LFY', 'START') AND t.trandate <= BUILTIN.RELATIVE_RANGES('LFY', 'END') | A date (or timestamp, depending on date_flag) | range_type 'START' or 'END'. The optional third parameter controls the returned data type; check the help page before using it. 'LFY' is last fiscal year, 'LFYTD' last fiscal year to date. |
Oracle SQL functions supported | NVL | Replace NULL with a default | NVL(expr, default) | NVL(tl.quantityshiprecv, 0) | expr or default | Use before arithmetic; NULL plus a number is NULL. |
Oracle SQL functions supported | NVL2 | One value when not NULL, another when NULL | NVL2(expr, if_not_null, if_null) | NVL2(t.duedate, 'Has terms', 'No due date') | Either branch | Both branches must be the same data type. |
Oracle SQL functions supported | COALESCE | First non-NULL of several values | COALESCE(expr1, expr2, ...) | COALESCE(tl.memo, t.memo, '') | First non-NULL value | Cleaner than nested NVL. |
Oracle SQL functions supported | CASE | Conditional logic | CASE WHEN cond THEN a [WHEN ...] ELSE b END | CASE WHEN t.status = 'H' THEN 'Closed' ELSE 'Open' END | Branch value | Prefer it over DECODE for readability. |
Oracle SQL functions supported | DECODE | Map values in a compact form | DECODE(expr, search1, result1, ..., default) | DECODE(t.type, 'SalesOrd', 'Order', 'CustInvc', 'Invoice', 'Other') | Mapped value | Oracle-specific; treats two NULLs as equal. |
Oracle SQL functions supported | TO_CHAR | Format a date or number as text | TO_CHAR(value, format) | TO_CHAR(t.trandate, 'YYYY-MM') | Text | Good for month buckets in GROUP BY. |
Oracle SQL functions supported | TO_DATE | Text to date | TO_DATE(text, format) | t.trandate >= TO_DATE('2026-01-01', 'YYYY-MM-DD') | Date | Always pass the format; account date preferences differ. |
Oracle SQL functions supported | TRUNC | Cut a date to the day, month or year (or a number to n decimals) | TRUNC(date [, unit]) or TRUNC(number [, n]) | TRUNC(t.createddate) | Date or number | Use on timestamp columns before comparing with dates. |
Oracle SQL functions supported | ADD_MONTHS | Date plus or minus months | ADD_MONTHS(date, n) | t.trandate >= ADD_MONTHS(TRUNC(SYSDATE), -12) | Date | Negative n goes back in time. |
Oracle SQL functions supported | SYSDATE | Current date and time | SYSDATE | TRUNC(SYSDATE) - t.trandate | Date | Subtracting dates gives days as a number. |
Oracle SQL functions supported | ROUND | Round a number | ROUND(number [, n]) | ROUND(tl.rate * ABS(tl.quantity), 2) | Number | Also rounds dates when given a date. |
Oracle SQL functions supported | SUBSTR | Part of a string | SUBSTR(text, start [, length]) | SUBSTR(i.itemid, 1, 3) | Text | Positions start at 1. |
Oracle SQL functions supported | INSTR | Position of a substring | INSTR(text, search [, start [, occurrence]]) | INSTR(i.itemid, '-') | Number, 0 if not found | Combine with SUBSTR to split part number prefixes. |
Oracle SQL functions supported | ROWNUM | Limit rows (SuiteQL has no LIMIT keyword) | WHERE ROWNUM <= n | SELECT * FROM (SELECT id, tranid FROM transaction ORDER BY id DESC) WHERE ROWNUM <= 50 | Row number pseudo column | Apply it outside a sub-select when you also ORDER BY. For paging use runSuiteQLPaged in N/query or limit and offset on the REST suiteql endpoint. |
BUILTIN functions and parameter values follow Oracle help 'SuiteQL Supported Built-in Functions' and the page for each function. Parameters are required unless shown in square brackets. SuiteQL accepts SQL-92 and Oracle SQL syntax but has no LIMIT keyword. Test any other Oracle function in your own account before relying on it.
Stuck on a currency or period query?
Send us the SuiteQL and the report it must tie to, and we will check the BUILTIN usage and rate choice.
Optional. The tool and every export work without this. No spam.
How to use it
Search by function name or by the job, such as currency, period, hierarchy or display name. Every BUILTIN call needs the BUILTIN. prefix; DF alone fails. String arguments are in single quotes and are case sensitive, so 'LEDGER' and 'ledger' are not the same. Optional parameters are shown in square brackets; everything else is required, and for CONSOLIDATE you may pass 'DEFAULT' for any parameter except the amount and the view type.
- Labels without joins: BUILTIN.DF
- Status filters: BUILTIN.CF
- Currency: CURRENCY_CONVERT for transaction rates, CONSOLIDATE for consolidation rates
- Relative dates: RELATIVE_RANGES for dates, PERIOD for accounting periods
Worked example: last fiscal year revenue by customer in one currency
SELECT BUILTIN.DF(t.entity) AS customer, SUM(BUILTIN.CURRENCY_CONVERT(tl.foreignamount, 1, t.trandate)) * -1 AS revenue FROM transaction t JOIN transactionline tl ON tl.transaction = t.id WHERE t.type = 'CustInvc' AND tl.mainline = 'F' AND tl.taxline = 'F' AND t.trandate BETWEEN BUILTIN.RELATIVE_RANGES('LFY', 'START') AND BUILTIN.RELATIVE_RANGES('LFY', 'END') GROUP BY BUILTIN.DF(t.entity). The -1 flips the negative revenue sign on invoice lines, currency id 1 is the target currency, and passing t.trandate uses the rate effective on each invoice date instead of today.
Gotchas
CURRENCY_CONVERT without a date uses today's rate, which silently restates history. CONSOLIDATE uses consolidated exchange rates per period, which is what financial statements use; pick it for anything that must tie to a consolidated report. BUILTIN.DF in GROUP BY must repeat the full expression. BUILTIN.PERIOD returns a set for IN, not a single value, while RELATIVE_RANGES returns one date. There is no LIMIT: use ROWNUM in a wrapping query or the paging features of N/query and the REST endpoint.
How to check the result in the system
Run the query for a small set of transactions and compare with the record. For DF, the value should match the field on the form. For CURRENCY_CONVERT, compare with the exchange rate on the Currency Exchange Rates page for that date. For CONSOLIDATE, compare with a consolidated financial report for the same period and subsidiary. Field names come from Setup > Records Catalog.
Frequently Asked Questions
What does BUILTIN.DF do in SuiteQL?
It returns the display value of a reference field, such as a customer name or status label, without joining the target table. BUILTIN.DF(t.entity) gives the customer name and BUILTIN.DF(t.status) gives Pending Fulfillment instead of B.
How many BUILTIN functions does SuiteQL support?
Oracle lists ten: CF, CONSOLIDATE, CURRENCY, CURRENCY_CONVERT, DF, HIERARCHY, MNFILTER, NAMED_GROUP, PERIOD and RELATIVE_RANGES. Each is called with the BUILTIN. prefix. Beyond these, SuiteQL accepts standard Oracle SQL functions such as NVL, CASE, TO_CHAR and TRUNC.
Does SuiteQL support LIMIT?
No. SuiteQL follows Oracle syntax, so use WHERE ROWNUM <= n, wrapping the query in a sub-select when you also sort. For larger results use runSuiteQLPaged in N/query or the limit and offset parameters of the REST suiteql endpoint.
What is the difference between CONSOLIDATE and CURRENCY_CONVERT?
CURRENCY_CONVERT uses the exchange rate table for a given date and target currency. CONSOLIDATE uses consolidated exchange rates (current, average or historical) for a target subsidiary and period, matching how NetSuite consolidates financial statements.
If you would rather have finance and operations ask these questions in plain English, we can set up a private AI layer over NetSuite that writes the SuiteQL and shows it.
Related Tools
NetSuite SuiteQL Tables Reference
The SuiteQL (NetSuite2.com data source) tables you join most often, each with its key, main columns and the exact join condition.
NetSuiteNetSuite SuiteQL Transaction and TransactionLine Columns Reference
Column-by-column guide to the two SuiteQL tables behind every transaction query, with types, example values and the sign conventions that trip people up.
NetSuiteNetSuite Transaction Status Codes Reference (SuiteQL and Search)
Status letter, search filter value and label for sales orders, invoices, purchase orders, fulfillments, bills, RMAs, transfer orders and more.
NetSuiteNetSuite SuiteQL Pagination Time Calculator
Calculate pages, round trips and total extraction time for a large SuiteQL result set, and see how page size and parallel threads change it.
More NetSuite tools
See all- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
- NetSuite User Access Request Form Template
- NetSuite Custom Record Design Spec Template
- NetSuite SuiteScript Deployment Handover Template
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- NetSuite SuiteQL Tables ReferenceThe SuiteQL (NetSuite2.com data source) tables you join most often, each with its key, main columns and the exact join condition.
- NetSuite Saved Search Formula Functions ReferenceEvery common SQL function for Formula (Text), (Numeric), (Date), (Currency) and (Percent) fields, with syntax and an example using real NetSuite field ids.
- NetSuite SuiteQL Transaction Query GeneratorPick a transaction type, date range and row limit and get ready-to-run SuiteQL for headers, lines and the REST call that executes it.
ERP fixes and how-tos
- How to write and run SuiteQL queries in NetSuiteRun SuiteQL from Analytics > SuiteQL Query Tool or via N/query in SuiteScript. Syntax basics, joins, pagination and real examples for NetSuite reporting.
- How to use formula fields in a NetSuite saved searchHow to build formula (text), formula (numeric) and formula (date) fields in a NetSuite saved search, with CASE WHEN, DECODE and NVL examples that actually work.
- N/query versus N/search: choosing the right SuiteScript data access moduleCompare NetSuite's N/query (SuiteQL) and N/search modules for performance, governance cost and capability, and decide which to use for joins, aggregation, sublist reads and large exports in SuiteScript 2.1.
Runs with your ERP
- NetSuite Quality Management SuiteApp: inspections and nonconformanceWhat the NetSuite Quality Management SuiteApp does: inspection specs, queues, sampling and nonconformance workflows. Setup, pitfalls, alternatives and AI uses.
- NetSuite AI Connector Service (MCP) and SuiteAgents with Oracle NetSuiteHow the NetSuite AI Connector Service (MCP) and SuiteAgents work: what external AI assistants can do, setup, pitfalls and where a private AI layer fits.
- NetSuite Manufacturing Mobile and Tablet MES for Shop Floor DataOracle's NetSuite Manufacturing Mobile gives operators a scanner and tablet interface for labor, completions, material moves and receipts. Setup and limits.
AI on your ERP
- AI agents for NetSuite manufacturing operationsAI agents for NetSuite manufacturing: WIP tracking, routing exceptions, and work order status grounded in SuiteQL, with human approval on anything that writes back.
- NetSuite Inventory and Demand Planning With AI That Checks Your Reorder LogicAI for NetSuite inventory and demand planning: review reorder points, safety stock, item demand plans and stockouts using SuiteQL on private infrastructure.
Integrations
- How to add AI agents to Oracle NetSuiteHow to add AI agents to Oracle NetSuite: SuiteQL and REST tool layer, RESTlet writes, role-scoped tokens, human approval, and where a private model fits.
- How to use Claude with Oracle NetSuiteUse Claude with Oracle NetSuite through MCP connectors, the Anthropic API, AWS Bedrock or Vertex, plus the on-prem alternative for controlled data.