NetSuite SuiteQL Transaction and TransactionLine Columns Reference
A column reference for the transaction and transactionline tables in NetSuite SuiteQL, with data types, sample values and the gotchas that make totals wrong. It applies to SuiteQL in N/query, the REST suiteql endpoint and the NetSuite2.com ODBC schema.
| Table | Column | Data type | Meaning | Example value | Gotcha |
|---|---|---|---|---|---|
transaction | id | integer | Internal ID of the transaction | 48213 | Same number space across all transaction types. |
transaction | tranid | text | Document number users see | SO10432 | Not unique across types; an invoice and an order can share a number. |
transaction | trandisplayname | text | Type plus number as shown in lists | Sales Order #SO10432 | For display only; do not parse it. |
transaction | type | text | Transaction type code | SalesOrd | Codes are case sensitive: CustInvc, PurchOrd, VendBill, ItemShip. |
transaction | recordtype | text | Record type id as used by SuiteScript | salesorder | Lowercase script id, different from type. |
transaction | trandate | date | Transaction date | 2026-10-14 | Compare with TO_DATE('2026-10-01', 'YYYY-MM-DD'), not a bare string. |
transaction | entity | reference | Customer, vendor or other entity on the header | 1187 | Points at different entity types per transaction type; use BUILTIN.DF(entity) for the name. |
transaction | status | text | Status letter for this transaction type | B | Bare letter. BUILTIN.DF(status) gives the label, BUILTIN.CF(status) gives 'SalesOrd:B'. |
transaction | postingperiod | reference | Accounting period | 301 | Join accountingperiod.id; empty on non-posting types such as sales orders. |
transaction | posting | boolean T/F | Whether the transaction posts to the GL | T | Sales orders and estimates are 'F'. |
transaction | currency | reference | Transaction currency | 2 | Join currency.id; symbol holds the ISO code. |
transaction | exchangerate | currency | Rate from transaction currency to subsidiary base currency | 1.0846 | 1 when transaction and subsidiary currency match. |
transaction | foreigntotal | currency | Document total in transaction currency | 12450.00 | Header total; do not add it to line sums or you double count. |
transaction | memo | text | Header memo | Rush order, ship complete | Line memo is a separate column on transactionline. |
transaction | approvalstatus | reference | Approval status list value | 2 | Use BUILTIN.DF(approvalstatus) for Pending Approval, Approved or Rejected. |
transaction | createddate | date | When the record was created | 2026-10-14 09:12 | Datetime, unlike trandate; TRUNC() it before comparing to a date. |
transaction | lastmodifieddate | date | Last change timestamp | 2026-10-15 16:40 | Use for incremental extracts: lastmodifieddate > last run time. |
transaction | voided | boolean T/F | Whether the transaction is voided | F | Filter voided = 'F' in financial reports. |
transaction | duedate | date | Payment due date | 2026-11-13 | Filled on invoices and bills, empty on most other types. |
transaction | employee | reference | Employee field on the header | 57 | Meaning varies by type; confirm in Records Catalog for yours. |
transaction | terms | reference | Payment terms | 3 | Join term.id or use BUILTIN.DF(terms). |
transaction | otherrefnum | text | Customer PO number or vendor reference | PO-77821 | Free text; trim and upper-case before matching. |
transaction | shipdate | date | Header ship date | 2026-10-20 | Line-level expected ship dates can differ. |
transactionline | transaction | reference | Parent transaction id | 48213 | Join key to transaction.id. |
transactionline | id | integer | Line id within the transaction | 3 | Unique only inside one transaction; the mainline row is usually id 0. |
transactionline | uniquekey | integer | Line key unique across all transactions | 915532 | Use as a single-column line key in extracts. |
transactionline | linesequencenumber | integer | Order of the line as displayed | 2 | Not the same as id; sort by this for print order. |
transactionline | mainline | boolean T/F | Header summary row | T | Every transaction has one mainline = 'T' row holding header-level values. |
transactionline | taxline | boolean T/F | Tax line | F | Exclude with taxline = 'F' when summing item amounts. |
transactionline | item | reference | Item on the line | 922 | Empty on mainline and on many journal lines. |
transactionline | itemtype | text | Type of the item on the line | InvtPart | Saves a join to item when you only need to filter by type. |
transactionline | quantity | number | Line quantity in the line unit | -25 | Negative on sales order lines; test on your account and use ABS() for display. |
transactionline | rate | currency | Unit price | 18.50 | Can be empty for lines priced by amount only. |
transactionline | netamount | currency | Line amount in subsidiary base currency | -462.50 | Revenue lines carry a negative sign on sales transactions. |
transactionline | foreignamount | currency | Line amount in transaction currency | -426.43 | Same sign rule as netamount: negative for revenue on sales transactions. |
transactionline | creditforeignamount | currency | Credit side of the line in transaction currency | 426.43 | Positive number; empty when the line is a debit. |
transactionline | memo | text | Line memo or description | Bracket, zinc plated | Separate from the header memo. |
transactionline | location | reference | Inventory location of the line | 4 | Can differ from the header location. |
transactionline | subsidiary | reference | Subsidiary of the line | 2 | Read it here; the header subsidiary is on the mainline row. |
transactionline | department | reference | Department segment | 7 | Line value can override the header. |
transactionline | class | reference | Class segment | 5 | Joins to the classification table, not a table named class. |
transactionline | entity | reference | Entity on the line | 1187 | Useful on journals where each line can name a different entity. |
transactionline | createdfrom | reference | Source transaction this line was created from | 48190 | Points at one source; use the link tables when a line has several. |
transactionline | isclosed | boolean T/F | Line closed | F | Filter isclosed = 'F' for open order reports. |
transactionline | quantityshiprecv | number | Quantity fulfilled or received so far | 10 | Open quantity = ABS(quantity) - quantityshiprecv; check signs on a test order. |
transactionline | quantitybilled | number | Quantity invoiced or billed so far | 10 | Compare with quantityshiprecv to find shipped-not-billed lines. |
transactionline | quantitycommitted | number | Quantity committed from stock | 15 | Depends on commitment settings per line. |
transactionline | isinventoryaffecting | boolean T/F | Line moves inventory | T | Use with fulfillments, receipts and adjustments for stock movement reports. |
transactionline | iscogs | boolean T/F | Line is a COGS line | F | Fulfillments create COGS lines; exclude them when you want item lines only. |
transactionline | expenseaccount | reference | Expense account on the line | 112 | For GL truth use transactionaccountingline.account. |
transactionline | units | reference | Unit of measure used on the line | 3 | Needs Multiple Units of Measure; quantity is in this unit. |
Columns verified for the NetSuite2.com data source used by SuiteQL. Sign conventions can surprise you: run a test query on one known sales order and compare quantity, netamount and foreignamount with the screen before building reports. Availability of some columns depends on enabled features and role permissions; Setup > Records Catalog (Transaction and Transaction Line) is the final word for your account.
Totals not matching the screen?
Send us the SuiteQL and one example transaction and we will point out the sign, mainline or join issue.
Optional. The tool and every export work without this. No spam.
How to use it
Filter the table column to transaction or transactionline, then search for the concept you need: date, quantity, amount, status, segment. The gotcha column is the part to read before you write the WHERE clause. The two tables split the work: transaction holds one row per document with header facts such as type, date, status and period; transactionline holds every line including a mainline = 'T' summary row. Segments (subsidiary, department, class, location) are read from the line in SuiteQL.
- Header facts: transaction
- Item lines: transactionline with mainline = 'F' AND taxline = 'F'
- GL accounts: transactionaccountingline, not transactionline
Worked example: open order quantity
SELECT t.tranid, BUILTIN.DF(t.status) AS status_label, tl.linesequencenumber, BUILTIN.DF(tl.item) AS item, ABS(tl.quantity) AS ordered, tl.quantityshiprecv AS shipped FROM transaction t JOIN transactionline tl ON tl.transaction = t.id WHERE t.type = 'SalesOrd' AND t.status IN ('B', 'D', 'E') AND tl.mainline = 'F' AND tl.taxline = 'F' AND tl.isclosed = 'F' ORDER BY t.tranid, tl.linesequencenumber. Status B, D and E are Pending Fulfillment, Partially Fulfilled and Pending Billing/Partially Fulfilled. Check one order on screen to confirm the sign of quantity in your account before subtracting shipped from ordered.
Version differences and gotchas
On sales transactions, revenue lines come back with negative netamount and foreignamount and sales line quantity is negative, because SuiteQL exposes the accounting sign rather than the screen value. The mainline row duplicates header totals, so summing all lines of a transaction without mainline = 'F' double counts. status is stored as one letter per type, so 'B' means Pending Fulfillment on a sales order and Paid In Full on an invoice: always pair it with type. trandate is a date while createddate and lastmodifieddate are timestamps.
How to check the result in the system
Open Setup > Records Catalog and search Transaction, then Transaction Line. The Fields tab lists every column with its type for your account, including custbody and custcol custom fields, which appear as extra columns on these same tables. Run your query for one tranid and compare each value with the transaction form and its GL Impact subtab. If a column is missing, a feature is off or the role lacks permission.
Frequently Asked Questions
Why is quantity negative in SuiteQL transactionline?
SuiteQL returns the stored accounting sign. On sales orders and invoices, line quantity and revenue amounts come back negative even though the form shows positive numbers. Use ABS() or multiply by -1 in the SELECT, and test on one known order first.
What does mainline mean in transactionline?
Each transaction has one line with mainline = 'T' that summarises the header, plus regular lines with mainline = 'F'. Filter mainline = 'F' for item detail, or mainline = 'T' for one row per transaction. Mixing them double counts totals.
How do I get the status label instead of a letter?
Wrap the column: BUILTIN.DF(t.status) returns the label such as Pending Fulfillment. BUILTIN.CF(t.status) returns the combined code such as SalesOrd:B, which Oracle recommends for filters on composite fields like status.
Where are custom body and column fields in SuiteQL?
custbody fields are columns on transaction and custcol fields are columns on transactionline, named by their script IDs. Use BUILTIN.DF() on list or record fields to get the text value.
If your planners and controllers want to ask open order and billing questions in plain English, we can put a private AI layer over NetSuite that writes and shows this SuiteQL for them.
Related Tools
NetSuite SuiteQL Tables Reference
The SuiteQL (NetSuite2.com data source) tables you join most often, each with its key, main columns and the exact join condition.
NetSuiteNetSuite Transaction Status Codes Reference (SuiteQL and Search)
Status letter, search filter value and label for sales orders, invoices, purchase orders, fulfillments, bills, RMAs, transfer orders and more.
NetSuiteNetSuite SuiteQL BUILTIN Functions Reference
The ten BUILTIN functions Oracle documents for SuiteQL, with exact parameter order and one-line examples, plus the Oracle SQL functions you will use beside them.
NetSuiteNetSuite SuiteQL Transaction Query Generator
Pick a transaction type, date range and row limit and get ready-to-run SuiteQL for headers, lines and the REST call that executes it.
More NetSuite tools
See all- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
- NetSuite User Access Request Form Template
- NetSuite Custom Record Design Spec Template
- NetSuite SuiteScript Deployment Handover Template
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- NetSuite SuiteQL Transaction Query GeneratorPick a transaction type, date range and row limit and get ready-to-run SuiteQL for headers, lines and the REST call that executes it.
- NetSuite SuiteQL Tables ReferenceThe SuiteQL (NetSuite2.com data source) tables you join most often, each with its key, main columns and the exact join condition.
- SuiteQL Query GeneratorFill in a table, columns, filter and sort and get a SuiteQL statement ready for the N/query module, the REST SuiteQL endpoint or the SuiteAnalytics Workbook.
ERP fixes and how-tos
- How to write and run SuiteQL queries in NetSuiteRun SuiteQL from Analytics > SuiteQL Query Tool or via N/query in SuiteScript. Syntax basics, joins, pagination and real examples for NetSuite reporting.
- Setting up NetSuite SuiteAnalytics Connect for ODBC and JDBC accessEnable and configure SuiteAnalytics Connect for read-only ODBC/JDBC access to NetSuite from Power BI, Tableau or Excel, including DSN setup, role permissions, and why large joins time out.
- N/query versus N/search: choosing the right SuiteScript data access moduleCompare NetSuite's N/query (SuiteQL) and N/search modules for performance, governance cost and capability, and decide which to use for joins, aggregation, sublist reads and large exports in SuiteScript 2.1.
AI on your ERP
- AI agents for NetSuite manufacturing operationsAI agents for NetSuite manufacturing: WIP tracking, routing exceptions, and work order status grounded in SuiteQL, with human approval on anything that writes back.
- AI for NetSuite, Beyond the Built-In Text ToolsNetSuite's built-in AI covers text generation, not grounded answers on your own data. See how a private LLM over SuiteQL adds real Q&A and controls.
Integrations
- How to add AI agents to Oracle NetSuiteHow to add AI agents to Oracle NetSuite: SuiteQL and REST tool layer, RESTlet writes, role-scoped tokens, human approval, and where a private model fits.
- How to use Claude with Oracle NetSuiteUse Claude with Oracle NetSuite through MCP connectors, the Anthropic API, AWS Bedrock or Vertex, plus the on-prem alternative for controlled data.