Oracle Fusion Data Migration Mapping Worksheet
Data migration is where Oracle Fusion SCM projects slip. This worksheet keeps the field level mapping, transform rule and cleansing status in one table that you can export and hand to the loading team.
| Source table | Source field | Fusion object | Fusion attribute | Transform | Source records | Known bad data (%) | Records after cleansing | Status | |
|---|---|---|---|---|---|---|---|---|---|
46,754 | |||||||||
47,477 | |||||||||
1,978 | |||||||||
59,780 | |||||||||
8,930 |
Use the Fusion object and attribute names from the FBDI templates or the REST resource you intend to load through. Check names against your release.
Want the first mapping drafted from your schema?
Optional expert review of your legacy tables against Oracle Fusion load objects.
Optional. The tool and every export work without this. No spam.
How to fill it in
Start from the source side. List each legacy table and field that matters, then name the Fusion object and attribute that receives it. Choose a transform rule so developers know whether a field moves as is, needs a cross reference table, or is derived. Enter source record counts and the percentage of known bad data from profiling. The sheet then shows the records expected to pass cleansing.
Using the transform column
Lookup rows deserve extra attention because each needs a published cross reference, such as legacy unit of measure to Fusion unit of measure or legacy category to catalog category. Derived rows need written logic. Drop rows should be agreed with the business, since a dropped field is often someone's report column. Keep a count of each type and review them in the mapping sign off.
- One row per source field
- Cross reference tables are deliverables
- Derived logic is written, not verbal
- Drops need business sign off
Reading the survival rate
The summary divides cleansed records by source records. It is only as good as your profiling. If a high volume object such as on-hand balances or item attributes shows a poor survival rate, plan extra cleansing cycles before the mock loads. Compare it with load results from each mock cycle, because the real error rate often differs from the profiled rate.
Common mistakes
Mapping to display names rather than the load column, ignoring required attributes that have no legacy source, and forgetting dependency order. Items must exist before structures, and organizations and locations before on-hand quantities. Add a sequence note in the transform column when order matters.
Frequently Asked Questions
Which load method should I map to?
Most bulk SCM loads use File Based Data Import templates, while smaller or ongoing updates often use REST services. Map to whichever you will run in production. Attribute names can differ between methods, so state the method in the Fusion object column.
How many mock loads do projects usually run?
Typically two to four full mock loads before cutover, with each cycle shrinking the error count. The right number depends on volume and cleansing quality, and the plan should hold time for a final dress rehearsal.
What error percentage is acceptable?
There is no universal threshold. Master data such as items and suppliers should be near clean, while historical transactions may be partly archived instead of migrated. Set targets per object and record them in the sign off.
Should inactive records be migrated?
Usually only if they are referenced by open transactions or needed for history. Migrating dead items inflates load times and clutters search. Agree an activity cut off date with the business.
If the source is Infor SyteLine, Baan or another legacy ERP, we can profile the tables and draft the first mapping from the schema.
Related Tools
Oracle Fusion FBDI Load Time Estimator
Estimate the duration of a bulk data load from the record count, throughput, batch size and expected error rate.
OracleOracle Fusion Cutover Plan Worksheet
Plan a go-live weekend task by task, with start offsets, durations, owners and a calculated end hour for each step.
OracleOracle Fusion Cloud SCM Fit Gap Worksheet
Log each requirement, classify it as standard, configuration, extension or gap, and total the effort and cost before the design workshops end.
OracleOracle Fusion SCM UAT Test Script Template
A fill-in test script with preconditions, step table, expected results and sign off for user acceptance testing of Oracle Fusion SCM.
More Oracle tools
See all- Oracle Fusion FBDI Template Field Guide
- Oracle Fusion Item Class Design Worksheet
- Oracle Fusion Supply Planning Checklist
- Oracle Fusion BI Publisher Report Specification Template
- Oracle Fusion Quarterly Update Test Checklist
- Oracle Fusion Role Provisioning Worksheet
- Oracle Fusion Inventory Organization Design Worksheet
- Oracle Fusion SCM Implementation Statement of Work Template
- Oracle Fusion Min-Max and Safety Stock Calculator
Keep exploring
Free tools
- Oracle Fusion Supply Planning ChecklistWork through plan setup, data collection, item and sourcing attributes, plan runs and exception review for Fusion Supply Planning.
- Oracle Fusion Integration Design Document TemplateFill in interface details once and get a clean design document covering method, mapping, scheduling, error handling and approvals.
- Oracle Fusion SCM Implementation Readiness AssessmentTen questions that show whether data, process, integration and people are ready for a Fusion SCM implementation.
ERP fixes and how-tos
- Oracle Fusion Manufacturing: Work Order Cannot Complete or CloseWhy an Oracle Fusion Manufacturing work order will not complete or close: open operations, unissued components, pending transactions, cost variances and status holds.
- Oracle Fusion Inventory: Cycle Count Setup and Adjustment ApprovalSet up cycle counts in Oracle Fusion Inventory: count definitions, ABC classes, tolerances, approval of adjustments and where the accounting lands in costing.
- Oracle Fusion Supply Planning: No Recommendations or Plan Run FailsTroubleshoot an Oracle Fusion Supply Planning run that fails or returns no planned orders: planning data collection, plan options, item attributes and supply netting.
Runs with your ERP
- Oracle Fusion Cloud Quality Management with Fusion SCMHow Oracle Fusion Cloud Quality Management logs nonconformance against WIP, receiving and supplier records and drives CAPA: flows, setup and pitfalls.
- Oracle Fusion Cloud Maintenance with Fusion ERP and SCMHow Oracle Fusion Cloud Maintenance handles work orders, preventive maintenance and warranty on Fusion SCM: data flows, setup, pitfalls and private AI ideas.
- Oracle IoT Production Monitoring with Fusion Cloud ManufacturingHow Oracle IoT Production Monitoring syncs resources and work orders with Fusion Manufacturing and writes back status and quantities: flows, setup, pitfalls.
Guides
- Oracle JD Edwards to Infor: Migration Planning GuidePlan your Oracle JD Edwards EnterpriseOne migration to Infor CloudSuite or LN. Data mapping, functional comparison, and migration timeline.
- AI-Assisted ERP Data Migration Best PracticesMaster ERP data migration with AI. Automated data cleansing, validation, and mapping for Infor SyteLine, LN, M3, and Salesforce migrations.
AI on your ERP
- AI for Oracle Cloud SCM and Manufacturing, Grounded in Your Planning DataAdd grounded AI to Oracle Cloud SCM and Fusion Manufacturing: demand plans, work orders, and supplier data, answered on-prem or in a private cloud with full query visibility.
- AI-assisted data migration for ERP implementationsAI speeds ERP data migration by profiling legacy data, proposing field mappings, and flagging cleansing issues before cutover, with a human validating every rule.
Integrations
- How to connect ChatGPT to Oracle Fusion Cloud ERPHow to use ChatGPT with Oracle Fusion Cloud ERP: custom GPT actions over REST, exports versus live access, enterprise data controls and private model options.
- How to use Claude with Oracle Fusion Cloud ERPHow to use Claude with Oracle Fusion Cloud ERP through MCP connectors, Anthropic API, AWS Bedrock or Google Vertex, and when a private on-prem model is better.
Software
- Oracle Fusion Cloud ERPOracle Fusion Cloud ERP explained: financials, procurement, manufacturing and SCM modules, REST APIs, FBDI and OTBI, limits, alternatives and AI fit.
- Oracle Supply Chain PlanningOracle Supply Chain Planning explained: demand, supply, replenishment and S&OP capabilities in Oracle Fusion Cloud, integrations, limits and alternatives.