Oracle Fusion Integration Design Document Template
Interfaces are where most Oracle Fusion programs lose weeks. A short, consistent design document per interface keeps method, mapping, error handling and ownership clear before anyone builds.
Fill in
Oracle Fusion Integration Design Document Template
Integration Design Document: MES work order completion to Fusion
Project: Fusion SCM Wave 1 Interface ID: INT-014 Date: 2026-11-02 Business owner: Plant Operations Manager
1. Business purpose
Report completed quantities and scrap from the shop floor so inventory and work order status in Fusion stay current.
2. Scope and systems
| Item | Detail |
|---|---|
| Source system | Plant MES |
| Target system | Oracle Fusion Manufacturing |
| Method | REST API |
| Frequency | Every 5 minutes |
| Expected volume | About 800 messages per day, peak 100 per hour |
3. Field mapping
| Source field | Target field | Transformation | Required |
|---|---|---|---|
4. Security and access
Document the integration user, assigned roles, data security scope, how credentials are stored and rotated, and network path between Plant MES and Oracle Fusion Manufacturing.
5. Error handling and monitoring
Failed messages are logged with correlation ID, retried three times with back off, then routed to an error queue reviewed by support each morning.
6. Reconciliation
Describe how counts and values are compared between Plant MES and Oracle Fusion Manufacturing, who runs the check, how often, and the tolerance for differences.
7. Testing and cutover
List test scenarios, test data, performance test volumes and the cutover steps for this interface including how in-flight messages are handled.
Approvals
Starter document. Add API resource names, payload examples and release specific details from your own environment before approval.
Interface design review
Send an interface design and get comments on method, error handling and monitoring.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill the fields at the top, then export the formatted document to PDF or Word. Complete the mapping table in a workshop with both system owners. Each interface gets one document and one interface ID, which becomes the reference for build, test and support.
- One document per interface
- Complete mapping before build
- Obtain sign off from both system owners
Choosing the integration method
Use REST for transactional, near real time interactions. FBDI with scheduled ESS import suits high volume, batch style loads. Business events and Oracle Integration help when changes in Fusion must trigger outbound flows. File transfer persists for legacy partners. Choose based on volume, latency and error handling needs, not on habit.
Common mistakes
Documents often skip error handling, so the first failed message at go live has no owner. Reconciliation is another omission, which lets silent data drift go unnoticed. Security is often a footnote when it should list the integration user, roles and credential rotation.
- Name who watches the error queue
- Define a reconciliation check
- List integration user roles explicitly
Frequently Asked Questions
Do I need a document for every interface?
For production interfaces, yes. Even a short one forces a decision on method, owner and error handling. Keep it brief for simple flows and detailed for high volume or financially significant ones.
REST or FBDI?
REST suits individual transactions and moderate volume with immediate feedback. FBDI suits large batches, where you load files and run import jobs. Many programs use both, depending on each interface's volume and latency needs.
Who approves the document?
The business owner for purpose and data, the integration developer for feasibility, the architect for pattern fit and security for access. All four signatures are included in the template.
Should payload examples be included?
Yes. Add sample request and response payloads from your environment after the first successful test. They shorten onboarding of new support staff and help regression testing after quarterly updates.
If you are designing many interfaces, we can help review the pattern and show how AI assisted monitoring summarizes failed messages for support teams.
Related Tools
Oracle Fusion Manufacturing Cutover Checklist
A grouped cutover checklist for moving a plant onto Oracle Fusion SCM and Manufacturing, with critical items marked.
OracleOracle EBS to Fusion Fit Gap Worksheet
Capture each requirement, classify it as standard, configuration, extension or gap, and total the effort in days.
OracleOracle Fusion SCM BI Publisher SQL Query Generator
Fill in organization, item and BU filters and get starter SQL for item, on-hand and open PO data models.
More Oracle tools
See all- Oracle Fusion FBDI Template Field Guide
- Oracle Fusion Item Class Design Worksheet
- Oracle Fusion Supply Planning Checklist
- Oracle Fusion BI Publisher Report Specification Template
- Oracle Fusion Quarterly Update Test Checklist
- Oracle Fusion Role Provisioning Worksheet
- Oracle Fusion Cloud SCM Fit Gap Worksheet
- Oracle Fusion Data Migration Mapping Worksheet
- Oracle Fusion Cutover Plan Worksheet
Keep exploring
Free tools
- Oracle Fusion Item Class Design WorksheetPlan item classes, parent classes, attribute groups and templates before you configure Fusion Product Hub, then export the design to Excel.
- Oracle Fusion SCM Implementation Readiness AssessmentTen questions that show whether data, process, integration and people are ready for a Fusion SCM implementation.
- Oracle Fusion Cloud SCM Fit Gap WorksheetLog each requirement, classify it as standard, configuration, extension or gap, and total the effort and cost before the design workshops end.
ERP fixes and how-tos
- Oracle Fusion Manufacturing: Work Order Cannot Complete or CloseWhy an Oracle Fusion Manufacturing work order will not complete or close: open operations, unissued components, pending transactions, cost variances and status holds.
- Oracle Fusion Inventory: Cycle Count Setup and Adjustment ApprovalSet up cycle counts in Oracle Fusion Inventory: count definitions, ABC classes, tolerances, approval of adjustments and where the accounting lands in costing.
- Oracle Fusion: Cost Accounting Distributions Not CreatedOracle Fusion inventory transactions not costed or without distributions: check cost organization, cost book, valuation setup, missing item cost, and the processing jobs.
Runs with your ERP
- Oracle Fusion Cloud Quality Management with Fusion SCMHow Oracle Fusion Cloud Quality Management logs nonconformance against WIP, receiving and supplier records and drives CAPA: flows, setup and pitfalls.
- Oracle Fusion Cloud Maintenance with Fusion ERP and SCMHow Oracle Fusion Cloud Maintenance handles work orders, preventive maintenance and warranty on Fusion SCM: data flows, setup, pitfalls and private AI ideas.
- Oracle IoT Production Monitoring with Fusion Cloud ManufacturingHow Oracle IoT Production Monitoring syncs resources and work orders with Fusion Manufacturing and writes back status and quantities: flows, setup, pitfalls.
AI on your ERP
- AI for Oracle Cloud SCM and Manufacturing, Grounded in Your Planning DataAdd grounded AI to Oracle Cloud SCM and Fusion Manufacturing: demand plans, work orders, and supplier data, answered on-prem or in a private cloud with full query visibility.
- Oracle Fusion AI Agents: What AI Agent Studio Does and Where a Private Layer FitsWhat Oracle Fusion Cloud ERP AI agents and AI Agent Studio actually do, where they are enough, and when a private agent layer beside Fusion makes more sense.
Integrations
- How to connect ChatGPT to Oracle Fusion Cloud ERPHow to use ChatGPT with Oracle Fusion Cloud ERP: custom GPT actions over REST, exports versus live access, enterprise data controls and private model options.
- How to add AI agents to Oracle Fusion Cloud ERPHow to build AI agents on Oracle Fusion Cloud ERP: REST tool layer, BICC and OTBI for reads, FBDI and approvals for writes, and where private models fit.
Software
- Oracle Fusion Cloud ERPOracle Fusion Cloud ERP explained: financials, procurement, manufacturing and SCM modules, REST APIs, FBDI and OTBI, limits, alternatives and AI fit.
- Oracle Supply Chain PlanningOracle Supply Chain Planning explained: demand, supply, replenishment and S&OP capabilities in Oracle Fusion Cloud, integrations, limits and alternatives.