Oracle Fusion Work Order Statuses Reference
Oracle Fusion Cloud Manufacturing work orders move through a small set of statuses, and almost every shop floor question starts with which one an order is in. This reference lists each status, what it allows and what usually comes next.
| Work order status | What it means | Shop floor execution | Typical next status | Watch out for |
|---|---|---|---|---|
Unreleased | Work order exists but is not yet released to the shop floor. Planned quantities and dates can still be edited. | No material issue or operation reporting | Released, Canceled | Components are not reserved for execution yet, so shortages show only in planning views. |
Released | Work order is authorized for execution on the floor. | Material issues, operation completions and resource transactions allowed | On Hold, Completed | Release is the point where pick and issue demand typically begins, check your release and pick settings. |
On Hold | Execution is temporarily suspended, for example for a quality or engineering issue. | Reporting is blocked while the hold applies | Released, Canceled | Held orders still show in open work order reports, so filter them out of plant dashboards on purpose. |
Completed | Finished quantity has been reported and the work order has reached completion. | Limited: corrections may still be allowed within controls | Pending Close, Closed | Completed does not mean costed. Variances are settled only when the order is closed. |
Pending Close | Close request has been submitted and the order is waiting for close processing and cost variance handling. | No new execution transactions | Closed | Orders that stay in this state usually point to an unprocessed close job or a costing exception. |
Closed | Work order is financially closed and variances have been calculated. | None | None (final) | Reopening rules depend on your release and setup, test the behavior before promising it to users. |
Canceled | Work order was abandoned before completion and will not produce output. | None | None (final) | Cancel only after returning any issued material, or issued cost has to be dealt with at close. |
Status names and allowed transitions can differ slightly by release and by whether you use standard discrete, process or maintenance work orders. Confirm against your own pod and the Using Manufacturing guide for your update before building training material.
Ask your Fusion data in plain English
Optional: see how a read-only assistant can answer work order status questions from your Fusion data, with the query shown.
Optional. The tool and every export work without this. No spam.
How to use this reference
Search by status name or by the symptom you are chasing, such as stuck close or no issue allowed. Each row gives the meaning, what execution is possible, the usual next status and a common trap. Use the Excel export as a training handout for production supervisors or paste the rows into a test script so each status is exercised on purpose rather than by accident. Because the table is read only, it is safe to share with users who should not touch setup.
The lifecycle in one pass
A typical discrete work order is created Unreleased, released to the floor, reported through operations and material issues, completed, then closed. Hold and cancel are side exits. The financial meaning arrives late: cost variances are not final until close, so a Completed order can still move cost later. Plan your period end around that fact, not around production completion dates.
- Unreleased to Released: authorizes execution
- Released to Completed: output reported against the order
- Completed to Closed: variances calculated and posted
- On Hold and Canceled: exits that need clear business rules
Common consultant mistakes
The most frequent problem is treating Completed as the end. Planners then see clean shop floor reports while the cost accountant still has open variances. A second problem is mass releasing orders to make a dashboard look busy, which pulls demand for components forward. A third is cancelling with material still issued. Agree a standard operating procedure for each status before go live and put it in the test plan.
Testing status behavior
For every status, record in your test plan what a user can do, what the system blocks and which reports include the order. Run the same cases after each quarterly update, since small behavior changes appear there. Keep one scenario per exit path: normal close, hold then resume, cancel with issued material, and a close that fails costing validation.
Frequently Asked Questions
Does Completed mean the work order is finished financially?
No. Completed means output has been reported. Cost variances are settled when the work order is closed, so a Completed order can still carry open cost until close processing runs. Finance and production should agree when close is run.
Can I move a Closed work order back to an open status?
That depends on your release and your configuration, and it is not something to promise in a design document. Test it in a non-production pod, and treat close as final in your standard operating procedure unless you have verified otherwise.
Why is a work order stuck in Pending Close?
Usually the close process has not been run, it failed on a costing or transaction validation, or a scheduled process is waiting. Check the scheduled processes monitor for the close job and read its log before changing anything on the order.
Are statuses the same for maintenance work orders?
Not exactly. Maintenance work orders in Fusion Maintenance have their own status model. This reference targets Manufacturing work orders, so check the Maintenance documentation separately for asset work.
If your team keeps asking the same status questions, Netray can put a read-only natural language layer over your Fusion manufacturing data so supervisors can ask where an order is stuck. It is optional, the reference works on its own.
Related Tools
Oracle Fusion Supply Planning Checklist
Work through plan setup, data collection, item and sourcing attributes, plan runs and exception review for Fusion Supply Planning.
Developer ToolsOracle Fusion REST API URL Builder
Fill in host, version and resource to generate a Fusion Cloud REST URL with query parameters and a ready curl command.
OracleOracle Fusion Quarterly Update Test Checklist
A step-by-step regression checklist for each Oracle Fusion Cloud quarterly update, from release notes review to production sign-off.
OracleOracle Fusion Item Class Design Worksheet
Plan item classes, parent classes, attribute groups and templates before you configure Fusion Product Hub, then export the design to Excel.
More Oracle tools
See all- Oracle EBS Discrete Job Statuses Reference
- Oracle EBS Inventory Transaction Types Reference
- Oracle EBS Item Attribute Template Worksheet
- Oracle EBS MRP Exception Messages Reference
- Oracle EBS BOM Interface Load Worksheet
- Oracle EBS Inventory Period Close Checklist
- Oracle EBS WIP Accounting Class Reference
- Oracle EBS Cycle Count Setup Worksheet
- Oracle EBS WIP Job Close Variance Worksheet
Keep exploring
Free tools
- Oracle Fusion Manufacturing Tables ReferenceA searchable list of the main Oracle Fusion Manufacturing tables for work orders and work definitions, with purpose, key columns and join notes for BI Publisher reports.
- Oracle EBS Discrete Job Statuses ReferenceLook up every Oracle WIP discrete job status, its numeric code, what transactions it allows and the usual next step.
- Oracle EBS Module to Fusion Cloud Product ReferenceSee which Oracle Fusion Cloud product replaces each E-Business Suite module, with the key change to plan for.
ERP fixes and how-tos
- Oracle Fusion Manufacturing: Work Order Cannot Complete or CloseWhy an Oracle Fusion Manufacturing work order will not complete or close: open operations, unissued components, pending transactions, cost variances and status holds.
- Oracle Fusion Manufacturing User Guide: Setup Order, Daily Use and Where the Official Docs and Training AreA practical guide to Oracle Fusion Manufacturing: setup order, work definitions, work orders, shop floor execution and where official docs and training live.
- Oracle Fusion REST API: customers, projects and manufacturing work ordersHow to call Oracle Fusion Cloud REST APIs for customers, projects and manufacturing work orders: base URL, auth, query parameters, expand, paging and examples.
Runs with your ERP
- Oracle Fusion Cloud Maintenance with Fusion ERP and SCMHow Oracle Fusion Cloud Maintenance handles work orders, preventive maintenance and warranty on Fusion SCM: data flows, setup, pitfalls and private AI ideas.
- Oracle Fusion Cloud Quality Management with Fusion SCMHow Oracle Fusion Cloud Quality Management logs nonconformance against WIP, receiving and supplier records and drives CAPA: flows, setup and pitfalls.
- Oracle IoT Production Monitoring with Fusion Cloud ManufacturingHow Oracle IoT Production Monitoring syncs resources and work orders with Fusion Manufacturing and writes back status and quantities: flows, setup, pitfalls.
AI on your ERP
- AI for Oracle Cloud SCM and Manufacturing, Grounded in Your Planning DataAdd grounded AI to Oracle Cloud SCM and Fusion Manufacturing: demand plans, work orders, and supplier data, answered on-prem or in a private cloud with full query visibility.
- Oracle Fusion AI Agents: What AI Agent Studio Does and Where a Private Layer FitsWhat Oracle Fusion Cloud ERP AI agents and AI Agent Studio actually do, where they are enough, and when a private agent layer beside Fusion makes more sense.
Integrations
- How to connect ChatGPT to Oracle Fusion Cloud ERPHow to use ChatGPT with Oracle Fusion Cloud ERP: custom GPT actions over REST, exports versus live access, enterprise data controls and private model options.
- How to use Claude with Oracle Fusion Cloud ERPHow to use Claude with Oracle Fusion Cloud ERP through MCP connectors, Anthropic API, AWS Bedrock or Google Vertex, and when a private on-prem model is better.
Software
- Oracle Fusion Cloud ERPOracle Fusion Cloud ERP explained: financials, procurement, manufacturing and SCM modules, REST APIs, FBDI and OTBI, limits, alternatives and AI fit.
- Oracle Supply Chain PlanningOracle Supply Chain Planning explained: demand, supply, replenishment and S&OP capabilities in Oracle Fusion Cloud, integrations, limits and alternatives.