Oracle Fusion REST API URL Builder
Oracle Fusion Cloud applications expose REST resources under a predictable URL pattern. This builder assembles the host, version, resource and query parameters, so you can test calls quickly and share a clean example with your team.
Fill in
Host name of your Fusion Applications environment, without https://.
Use the version shown in the REST API documentation for your update.
Attribute filters, for example Attr=Value;Attr2 LIKE 'AB%'. Check attribute names in the resource describe.
Comma separated attribute names.
Request URL
GET https://your-pod.fa.us2.oraclecloud.com/fscmRestApi/resources/11.13.18.05/workOrders?q=WorkOrderStatusCode=ORA_RELEASED&fields=WorkOrderNumber,WorkOrderStatusCode,ItemNumber&limit=25&offset=0&orderBy=WorkOrderNumber:asc&onlyData=true&totalResults=true
curl command
curl -u "integration.user" \ -H "Accept: application/json" \ "https://your-pod.fa.us2.oraclecloud.com/fscmRestApi/resources/11.13.18.05/workOrders?q=WorkOrderStatusCode=ORA_RELEASED&fields=WorkOrderNumber,WorkOrderStatusCode,ItemNumber&limit=25&offset=0&orderBy=WorkOrderNumber:asc&onlyData=true&totalResults=true"
Next page
GET https://your-pod.fa.us2.oraclecloud.com/fscmRestApi/resources/11.13.18.05/workOrders?q=WorkOrderStatusCode=ORA_RELEASED&fields=WorkOrderNumber,WorkOrderStatusCode,ItemNumber&limit=25&offset=25&orderBy=WorkOrderNumber:asc&onlyData=true # Keep requesting with offset increased by limit while the response has hasMore = true.
Single record by key
GET https://your-pod.fa.us2.oraclecloud.com/fscmRestApi/resources/11.13.18.05/workOrders/<resource key>?onlyData=true # The key is the value shown in the self link of a collection response, not always the visible number.
Resource names, attribute names, status code values and the latest REST version vary by release and by which feature is enabled. Always confirm in the REST API for Oracle Fusion Cloud SCM guide for your update, and encode special characters in the filter. Use OAuth or a dedicated integration user with minimal roles, and never place passwords in shared scripts.
Read-only agents on Fusion data
Optional: talk through how to expose Fusion data to an internal assistant safely, with queries shown and writes approved.
Optional. The tool and every export work without this. No spam.
How to use the builder
Enter your Fusion host, the REST version from your documentation and pick a resource. Add a q filter, the fields you want back and a page size. The tool outputs a GET URL, a curl command, the next page call and the single record pattern. Paste the curl command in a terminal, or copy the URL into a REST client such as Postman. Replace the sample filter with attribute names from the resource describe in your own environment.
Anatomy of a Fusion REST URL
SCM resources live under fscmRestApi/resources followed by a version and the resource name. Query parameters are standard across Oracle REST: q for filters, fields to trim the payload, limit and offset for paging, orderBy for sorting, expand to include child collections, and onlyData to drop link metadata. totalResults adds a count, at some cost on big collections, so use it deliberately.
- q: filter expression on resource attributes
- fields: comma separated attributes to return
- limit and offset: paging, check hasMore
- onlyData: remove link metadata from responses
Common mistakes
People copy status values from the user interface and wonder why the filter returns nothing: the API often expects an internal code such as one with an ORA_ prefix. Others forget to page, read only the first set of rows and conclude data is missing. Using a dedicated integration user with narrow roles, rather than a personal login, also avoids surprises when the person leaves. Finally, do not hard code the version across scripts; keep it in configuration.
Testing and security
Try new calls in a test pod first. Check rate and size behavior with realistic limits. Keep credentials out of source control, prefer OAuth or token based access for production integrations and assign only the data and function roles the integration needs. Log the full URL, but never the secret.
Frequently Asked Questions
What is the base path for Oracle Fusion SCM REST APIs?
SCM resources are generally served under /fscmRestApi/resources/ followed by a version number and the resource name. Other pillars such as HCM and financials use their own base paths, so check the guide for the application area.
How do I page through large results?
Use limit for the page size and offset for the starting row, then repeat while the response reports hasMore as true. Keep page sizes moderate and sort by a stable attribute so records are not skipped or repeated between pages.
Why does my q filter return no rows?
Usually an attribute name is wrong, the value is a display label rather than the internal code, or special characters are not encoded. Test the filter with a simpler condition and compare to a record fetched by key.
Can I use this for write calls?
The builder produces read requests. Writes use POST, PATCH or action endpoints with JSON bodies and need careful testing and approvals. Follow the resource documentation and test in a non-production pod first.
If you are building integrations or agents on top of Fusion data, Netray can help design them with read-only defaults and human approval for writes. The URL builder is free to use as it is.
Related Tools
Oracle Fusion Work Order Statuses Reference
Look up what each Oracle Fusion Manufacturing work order status means, what you can do in it, and which status usually comes next.
OracleOracle Fusion BI Publisher Report Specification Template
Document a BI Publisher report before you build it: purpose, data model, parameters, layout, schedule and security in one template.
OracleOracle Fusion Role Provisioning Worksheet
Plan who gets which Fusion job role, with which data access, who approved it and whether it raises a segregation of duties concern.
OracleOracle Fusion FBDI Template Field Guide
Map every FBDI column to its source, rule and owner before you load. Editable worksheet that exports to Excel.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- Oracle Fusion SCM Implementation Readiness AssessmentTen questions that show whether data, process, integration and people are ready for a Fusion SCM implementation.
- NetSuite REST Record API URL BuilderGenerate correct REST web services URLs and sample calls for a NetSuite record, a record list, a SuiteQL query or the metadata catalog.
- Oracle Fusion Manufacturing Cutover ChecklistA grouped cutover checklist for moving a plant onto Oracle Fusion SCM and Manufacturing, with critical items marked.
ERP fixes and how-tos
- Oracle Fusion REST API: customers, projects and manufacturing work ordersHow to call Oracle Fusion Cloud REST APIs for customers, projects and manufacturing work orders: base URL, auth, query parameters, expand, paging and examples.
- Project Creation API in Oracle FusionCreate projects in Oracle Fusion Cloud with the Project Management REST API: endpoint, sample JSON payload, template-based creation, roles and common errors.
- Oracle Work Order Tables: WIP_ENTITIES, WIP_DISCRETE_JOBS and the REST RouteOracle work order tables explained: WIP_ENTITIES, WIP_DISCRETE_JOBS, operations and requirements, with a join query for EBS and the Fusion REST route.
Runs with your ERP
- Oracle Fusion Cloud Quality Management with Fusion SCMHow Oracle Fusion Cloud Quality Management logs nonconformance against WIP, receiving and supplier records and drives CAPA: flows, setup and pitfalls.
- Oracle Fusion Cloud Maintenance with Fusion ERP and SCMHow Oracle Fusion Cloud Maintenance handles work orders, preventive maintenance and warranty on Fusion SCM: data flows, setup, pitfalls and private AI ideas.
- Oracle IoT Production Monitoring with Fusion Cloud ManufacturingHow Oracle IoT Production Monitoring syncs resources and work orders with Fusion Manufacturing and writes back status and quantities: flows, setup, pitfalls.
AI on your ERP
- AI for Oracle Cloud SCM and Manufacturing, Grounded in Your Planning DataAdd grounded AI to Oracle Cloud SCM and Fusion Manufacturing: demand plans, work orders, and supplier data, answered on-prem or in a private cloud with full query visibility.
- Oracle Fusion AI Agents: What AI Agent Studio Does and Where a Private Layer FitsWhat Oracle Fusion Cloud ERP AI agents and AI Agent Studio actually do, where they are enough, and when a private agent layer beside Fusion makes more sense.
Integrations
- How to build a mobile app for Oracle Fusion Cloud ERPBuild or extend a mobile app for Oracle Fusion: barcode receiving, inventory moves, labor reporting and approvals over REST, with offline and scanner support.
- How to build an MCP server for Oracle Fusion Cloud ERPHow to build a Model Context Protocol server for Oracle Fusion Cloud ERP: read-only tools, OAuth to Fusion REST, HTTP transport, scoping and audit for any MCP client.
Software
- Oracle Fusion Cloud ERPOracle Fusion Cloud ERP explained: financials, procurement, manufacturing and SCM modules, REST APIs, FBDI and OTBI, limits, alternatives and AI fit.
- Oracle Supply Chain PlanningOracle Supply Chain Planning explained: demand, supply, replenishment and S&OP capabilities in Oracle Fusion Cloud, integrations, limits and alternatives.