Part 145 Repair Station Audit Preparation Checklist
Whether the visitor is a national authority, a customer or an external auditor, the same areas tend to attract findings: out of date manuals, expired authorisations, overdue tools and incomplete release documents. This checklist helps you check each one before the audit.
0 of 40 items complete
14 critical items still open - these are the highest-risk gaps.
Manuals and procedures
People and training
Tooling, equipment and facilities
Parts, materials and stores
Work records and release
Quality system and corrective actions
Critical items are those an auditor will most likely raise first. Resolve all unticked critical items before the audit date, then record the evidence location for each ticked item.
Audit evidence search
Optional review of how quickly you can retrieve records from your systems.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Assign each group to the person who owns the area, such as quality for manuals and corrective actions, stores for parts, and the training coordinator for people records. Ask them to tick an item only when they can show the evidence. Review unticked critical items in a weekly meeting until the audit date. Export the list to PDF at the end so the pre-audit review itself is on record.
- Tick only with evidence in hand
- Name an owner for each unticked item
- Rehearse the retrieval of a few random records
Where findings usually come from
Most findings are not about missing procedures. They come from a gap between the written procedure and what staff do, a missed expiry date or a record that cannot be found in time. For that reason, spot checks beat document reviews. Pick a recent work order and follow it from induction to release, checking the data used, the parts fitted, the tools used and the people who signed. If the trail breaks anywhere, the audit would find it too.
Common mistakes
Teams often start preparing a week before, discover systemic gaps and patch them with paperwork, which auditors recognise quickly. Another mistake is closing a corrective action with a retraining note instead of fixing the cause. Make sure each action addresses why the problem occurred, check later that it worked, and keep the evidence where the auditor can find it. This list is a general aid and does not replace the requirements of your regulation or your approved system.
- Do not backdate records
- Verify, do not just close, corrective actions
- Confirm requirements with your authority
Frequently Asked Questions
Does this work for both FAA and EASA?
It covers topics common to both, such as manuals, authorisations, tooling and records. The regulatory text differs, so check items against the specific rule set that applies to your approval, and add any local requirements.
How often should we run it?
Run it before any external audit and at least once per internal audit cycle. Some stations review the critical items monthly, because expiry dates and calibration status can lapse between audits.
Who should complete the checklist?
The quality manager usually coordinates it, but area owners should confirm their sections. An independent person, not the owner, should verify a sample of ticked items.
Is passing this checklist the same as passing the audit?
No. It is a preparation aid and cannot cover every requirement. Auditors may sample areas that you did not expect, so keep the whole system healthy, not only the items on the list.
If audit evidence lives in several systems, we can set up a private search over your records so owners can pull proof quickly and in a read-only way.
Related Tools
Suspected Unapproved Parts Receiving Checklist
A receiving inspection checklist for catching suspected unapproved aircraft parts before they reach stock or an aircraft.
Aerospace & DefenseMRO Digital Records Readiness Self-Assessment
A ten question self-assessment of how well your repair station holds traceability data across planning, stores, shop floor and finance.
Aerospace & DefenseAircraft Time-in-Service Abbreviations Reference
A searchable glossary of the abbreviations used for component life, repair status and maintenance records in aviation MRO.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- Inspection Station Audit ChecklistAudit an incoming, in process or final inspection station for gauges, calibration, environment, documentation and nonconforming material control.
- MRO Component Repair Order Request TemplateFill in a clean repair request covering part identity, history, removal reason, requested scope and release documents, then export to PDF or Word.
- MRO Component Repair Quote TemplateProduce a clear component repair quote with scope, price basis, turn time, warranty and beyond-economic-repair terms.
Guides
- AI in MRO: Aerospace Use Cases That Work and Realistic ROIAI in MRO and AI for MRO: predictive maintenance, tech-log classification, 8130-3 drafting and repair quoting. What works today, data needed, realistic payback.
- NADCAP Heat Treat Audit Preparation for a Small Heat Treating ShopPreparing a small heat treating shop for a NADCAP audit: AMS 2750 pyrometry, TUS and SAT records, AC7102 checklist items and the paperwork auditors pull first.
- Preparing Your ERP Data for AI: A Practical GuidePrepare ERP data for AI use: extraction patterns, schema documentation, and the data quality checks that determine whether your copilot is trustworthy.
AI on your ERP
- AI for ERP in Singapore Aerospace MRO: On-Prem and PDPA-ReadyOn-prem AI for IFS, SAP, and AMOS-type MRO systems in Singapore aerospace: PDPA-aligned, CAAS-ready, built for the Seletar Aerospace Park hub.
- AI for ProShop quality and documentationHow AI reads ProShop quality records, work instructions, and inspection data to answer audit questions and prep FAIs, read-only via its API and private.
Manufacturing hubs
- Aerospace MRO and energy equipment manufacturing in TulsaTulsa aerospace maintenance, repair and overhaul plus energy equipment manufacturing: FAA Part 145, AS9100, API standards, ERP and private AI for shops.
- Manufacturing in San Antonio, Texas: aerospace MRO and automotiveSan Antonio manufacturing guide: aerospace MRO at Port San Antonio, automotive supply for Toyota Texas, standards, ecosystem, ERP and quoting problems, and private AI.