Aerospace & DefenseFree checklistPDF, Excel, Word exportAerospace MRO

Suspected Unapproved Parts (SUP) Receiving Inspection Checklist

Suspected unapproved parts are parts that may not meet approved design or production requirements, or whose documents do not support their claimed status. This checklist structures the checks a receiving inspector can make before a part is accepted into stock.

0%

0 of 34 items complete

10 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Paperwork and traceability

Part identification and marking

Physical condition and packaging

Supplier and purchase checks

Disposition and reporting

Every critical item must be answered yes before the part is accepted into serviceable stock. Any critical item answered no means the part goes to quarantine and the case goes to your quality department.

Receiving hold workflow in your ERP

Optional review of how quarantine and release statuses are enforced in your system.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

Work through the groups in order on every incoming safety relevant part, or on a sampling plan agreed with your quality department for lower risk items. Tick each item as checked. Critical items are marked because failure of any one of them is a reason to stop and quarantine. Save the completed list or export it to PDF and attach it to the receiving record so there is evidence of what was checked.

  • Do not accept on a verbal assurance
  • Photograph plates and documents
  • When in doubt, quarantine and ask quality

What the checks are looking for

Unapproved parts rarely announce themselves. The signs are small: a release document with the wrong approval reference, a serial plate that has been re-stamped, fresh paint over a data plate, dates that do not add up, or a price far below the market. No single sign proves a part is unapproved, but a pattern of small mismatches justifies a hold. The checklist forces the inspector to compare paperwork against the physical unit rather than checking each in isolation.

Common mistakes

Common failures include trusting a document because it looks official, skipping checks on small hardware or consumables, and returning a suspect part to the supplier before quality has seen it. That last action can destroy evidence and send the part back into the supply chain. Make sure stores staff understand that they may not release a quarantined item, even to a senior manager, without a recorded quality decision.

  • Hardware and consumables can be unapproved too
  • Keep the suspect part and its packaging
  • Record who tagged it and when

Frequently Asked Questions

What is a suspected unapproved part?

It is a part that may not conform to an approved design, may have been produced or repaired without authority, or has documents that do not support its claimed status. The term covers counterfeit, bogus and fraudulently documented parts.

Does this checklist replace my procedures?

No. It is a general aid. Your approved procedures, quality system and regulator requirements take priority, and your quality department decides what must be checked and reported.

Which parts need the full checklist?

Apply it to all safety relevant parts and to any part with unusual risk, such as a new supplier or a price well below market. Lower risk items can follow a sampling plan that quality approves.

What should I do if I suspect a part?

Stop, tag and segregate the part, keep all packaging and documents, take photographs and inform your quality manager. Do not return it, scrap it or install it until quality has made a decision.

If you want these checks enforced as hold statuses in your ERP receiving flow, we can help you set up the rules and the quarantine workflow.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring