Pressure Conversion Calculator (psi, bar, MPa, kPa)
Hydraulic pumps, pneumatic regulators, test rigs and vessels are rated in psi, bar, MPa, kPa or kgf/cm2 depending on the country and the age of the equipment. This calculator converts between them with exact definitions.
Your numbers
Gauge or absolute, as written on the spec. The converter does not change the reference.
Your results
Unit conversion only. Gauge versus absolute reference is not converted. Pressure vessel and piping design must follow the applicable code and manufacturer ratings.
bar and psi for the same pressure
Sweeps Pressure value from 10 to 400, holding your other inputs fixed.
Maintenance plan unit review
Optional: we can scan PM plans for pressure and torque values written in mixed units.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Type the pressure value, choose the unit it is written in, and read bar, psi, kPa, MPa, atm, kgf/cm2 and mmHg in the results. Everything is first converted to pascals and then to each target unit, so there is no chaining error. The chart plots bar against psi over a range, which helps when you are printing a gauge card or checking a test plan for a mixed-unit fleet.
- Quick rule: 1 bar is about 14.5 psi
- 1 MPa equals 10 bar equals 145 psi
- kgf/cm2 is within about 2 percent of bar
- Match your gauge range to the converted value
Definitions and factors
One bar is exactly 100,000 Pa. One standard atmosphere is exactly 101,325 Pa. One psi is 6894.757 Pa, defined from the pound-force and the inch. One kgf/cm2 is 98,066.5 Pa from standard gravity, and one mmHg is 133.322368 Pa. Inches of water depend on the reference temperature, so the factor used here is the 60 F convention.
Worked example
A hydraulic press manual rates a relief valve at 210 bar. Entering 210 bar returns 3,046 psi and 21 MPa. A European test spec of 6 bar converts to 87 psi, so a US regulator with a 0 to 100 psi gauge would be suitable but with limited headroom. For sizing, choose a gauge with the operating pressure around 50 to 70 percent of the full scale range.
Common mistakes
The classic error is ignoring gauge versus absolute: psig is relative to local atmosphere while psia is relative to vacuum, so 100 psig is about 114.7 psia. Others are treating bar and kgf/cm2 as identical in a critical test, confusing kPa and MPa by a factor of 1,000, and reading vacuum values in mmHg as positive pressures.
- Always record gauge or absolute with the value
- Vacuum specs are often in mmHg, torr or kPa absolute
- Do not exceed the lowest-rated component in the circuit
- Hydrostatic test pressure is a code multiple of design pressure
Frequently Asked Questions
How many psi is 1 bar?
One bar equals 14.5038 psi. For quick shop-floor math use 14.5, so 6 bar is about 87 psi and 10 bar is about 145 psi.
How do I convert MPa to psi?
Multiply MPa by 145.038. For example, 25 MPa is about 3,626 psi. Going the other way, divide psi by 145.038.
Is bar the same as kgf/cm2?
Almost, but not exactly. One kgf/cm2 equals 0.980665 bar, about 2 percent lower. Older Japanese and Indian equipment documents often use kgf/cm2, so convert before ordering parts or setting relief valves.
What is the difference between psig and psia?
Psig is measured relative to ambient atmosphere, psia relative to absolute vacuum. At sea level, psia equals psig plus about 14.7. Specs must say which one applies, especially for compressors and vacuum systems.
If your preventive maintenance plans store pressure settings in mixed units, Netray can help build a read-only check across your ERP and CMMS data. Ask for a scoping call.
Related Tools
Torque Conversion Calculator
Convert any torque value between Newton-metres, pound-feet, pound-inches, kgf-m, kgf-cm, ounce-inches and Newton-centimetres.
ERP OperationsUnit of Measure Conversion Reference
Searchable table of common UoM conversion factors for ERP item masters, with exact definitions where they exist.
Engineering & PLMMetal Density Reference Table
Searchable table of nominal densities for common engineering metals in three units, with typical use notes.
Engineering & PLMSteel and Aluminum Plate and Bar Weight Calculator
Weight and material cost of plate, round bar, square bar and hex bar in common metals, with kg per metre and a thickness sweep chart.
More Engineering & PLM tools
See all- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Engineering Change Affected Materials Impact Worksheet
- Cloud MRP BOM Data Cleanup Worksheet
Keep exploring
Free tools
- Pressure Test Record Report TemplateDocument a hydrostatic or pneumatic test with pressure in bar and psi, hold time, gauge details, observations and sign-off.
- Hydrostatic Test Pressure and Water Volume CalculatorCompute test pressure from MAWP and lowest stress ratio, recommended gauge range, and the fill volume and water weight of a cylindrical vessel.
- ASME B16.5 Flange Pressure Class Rating ReferenceSearchable table of ASME B16.5 flange classes 150 to 2500 with ambient pressure ratings in psi and bar and the approximate shell test pressure.
ERP fixes and how-tos
- JD Edwards table conversion: how it works and how to run oneWhat a JD Edwards table conversion does to a JDE table's structure and data, when it runs in a package build, and how to run or design one manually.
- Conversion Factor Session in Infor LN: Setup and Common ErrorsHow unit conversion factors work in Infor LN: general factors versus item-specific factors, where to maintain them and how to fix missing conversion factor errors.
- Data Conversion in Oracle EBS: Interface Tables, Open Interfaces and ReconciliationHow data conversion works in Oracle EBS: extract, stage, validate, load through interface tables and APIs, then reconcile. Practical steps and common failures.
Guides
- SyteLine Upgrade Data Conversion GuideHandle data conversion during SyteLine upgrades including schema migration, data transformation rules, open transaction handling, and historical data archival.
- ERP for Energy and Power Equipment ManufacturersERP for energy and power equipment manufacturers: ASME code compliance, long-lead castings, project-based costing, NERC and grid equipment traceability.