SAPFree generatorPDF, Excel, Word exportSAP ECC / S/4HANAAfricaAll SAP ECC 6.0 tools

SAP VAT Tax Code ABAP SELECT Generator

Finance teams in African entities that run SAP often reconcile the VAT return to the ledger by exporting tax lines to Excel. This generator writes the ABAP SELECT statements for the common queries: tax code texts, tax lines for one code and period, and totals by tax code.

Fill in

Four character SAP company code.

Tax procedure (calculation schema) assigned to the country, for example TAXZA for South Africa.

One tax code, for example an input or output VAT code in your system.

Generated code
Free, optional. Reopen it on any device.
Download:

Tax code texts for the procedure

REPORT zvat_by_tax_code.

DATA: lv_bukrs TYPE bukrs VALUE '1000',
      lv_kalsm TYPE kalsm_d VALUE 'TAXZA',
      lv_mwskz TYPE mwskz VALUE 'V1',
      lv_from  TYPE budat VALUE '20260901',
      lv_to    TYPE budat VALUE '20260930',
      lv_spras TYPE spras VALUE 'E'.

" Tax code descriptions for the procedure
SELECT kalsm, mwskz, text1
  FROM t007s
  WHERE spras = @lv_spras
    AND kalsm = @lv_kalsm
  INTO TABLE @DATA(lt_codes).

VAT lines for one tax code and period

" Tax lines posted in the period for the chosen tax code
SELECT bset~bukrs, bset~belnr, bset~gjahr, bset~buzei,
       bset~mwskz, bset~shkzg, bset~hwbas, bset~hwste,
       bkpf~budat, bkpf~blart
  FROM bset
  INNER JOIN bkpf
    ON  bkpf~bukrs = bset~bukrs
    AND bkpf~belnr = bset~belnr
    AND bkpf~gjahr = bset~gjahr
  WHERE bset~bukrs = @lv_bukrs
    AND bset~mwskz = @lv_mwskz
    AND bkpf~budat BETWEEN @lv_from AND @lv_to
  ORDER BY bkpf~budat, bset~belnr
  INTO TABLE @DATA(lt_vat).

Totals by tax code

" Summary of base and tax amount by tax code in the period
SELECT bset~mwskz,
       SUM( bset~hwbas ) AS base_amount,
       SUM( bset~hwste ) AS tax_amount
  FROM bset
  INNER JOIN bkpf
    ON  bkpf~bukrs = bset~bukrs
    AND bkpf~belnr = bset~belnr
    AND bkpf~gjahr = bset~gjahr
  WHERE bset~bukrs = @lv_bukrs
    AND bkpf~budat BETWEEN @lv_from AND @lv_to
  GROUP BY bset~mwskz
  ORDER BY bset~mwskz
  INTO TABLE @DATA(lt_totals).

cl_demo_output=>display( lt_totals ).

Verify table and field names in SE11 on your release. BSET holds tax data per document line in classic FI, and S/4HANA keeps it available, but check how your system stores tax data and whether authorization checks are required for production use. HWBAS and HWSTE are in local currency. Sign handling depends on SHKZG (debit or credit), so sum with care when reconciling to the VAT return. cl_demo_output is for quick checks in a sandbox only.

Want VAT reconciliation automated from SAP?

Optional: a read only reconciliation view that ties tax codes to return boxes, built on your own data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter your company code, the tax procedure assigned to the country, the tax code you want to inspect and the posting date range. Copy the generated code into a new report in SE38 or into ABAP Development Tools, activate it in a development or sandbox client, and run it. The first block reads the text of each tax code from T007S. The second block joins BSET to BKPF to get the tax lines and posting date. The third block sums base and tax by code.

  • Use a sandbox client first.
  • Change dates in YYYYMMDD format.
  • Add the document type filter if you want to exclude reversals or opening postings.

Where the data lives

BKPF is the accounting document header and holds posting date and document type. BSET holds tax data per document line, with the tax code in MWSKZ, the base amount in HWBAS and the tax amount in HWSTE. T007S stores tax code descriptions by language and tax procedure. The tax procedure in KALSM is assigned per country, and TAXZA is the standard procedure delivered for South Africa. Other African countries may use other delivered procedures or custom ones.

Reconciling to the VAT return

Run the totals block for the return period and compare each tax code to the matching box on the return, for example standard rated output, zero rated output and input tax. Differences usually come from manual journals, cut off dates, tax codes mapped to the wrong box, or reversed documents. Remember that the tax point on the return may differ from the posting date, so check how your return logic treats invoice date and payment date.

Common mistakes

Frequent errors include ignoring SHKZG so credit notes add instead of subtract, forgetting that foreign currency documents carry both local and foreign amounts, and running the report across all company codes. Do not build a production report straight from this snippet without authority checks and performance testing on large BSET volumes.

Frequently Asked Questions

Does this work on S/4HANA?

The table names are still available, but S/4HANA changes how accounting data is stored, and some customers prefer CDS views or the universal journal. Verify in SE11 and test in a sandbox before using the code in production.

What does TAXZA mean?

It is the tax procedure delivered for South Africa. A tax procedure defines the calculation schema for taxes in a country. Your system may use TAXZA or a copy, so check the assignment of your country in customizing.

Why are my totals different from the VAT return?

Common causes are manual journals, differing tax points, reversed documents, tax codes mapped to the wrong return box, and ignoring the debit credit indicator. Reconcile one tax code at a time to find the gap.

Can I use this for other African countries?

Yes, change the tax procedure and tax codes. The table logic is the same. Local requirements such as e-invoicing identifiers are held elsewhere, so this code covers ledger side reconciliation only.

If your VAT reconciliation still depends on manual exports, Netray can help build a read only reconciliation view over your SAP finance data, on-prem if required.

Get SAP HANA and Basis alerts

Support and maintenance deadlines, release changes that affect SAP HANA and Basis sites, and new free SAP HANA and Basis tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP HANA and Basis: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.

Keep exploring

Free tools

Runs with your ERP

AI on your ERP

Integrations