SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP Controlling (CO) Database Tables List

When a controller asks why a cost center number differs between two reports, the answer is usually in the tables. This reference lists the main SAP CO, product costing and valuation tables with a plain description of what each holds.

Download:
TableDescriptionAreaTypical use
TKA01
Controlling areas
Master data
Defines the CO area and its currency.
TKA02
Controlling area assignment to company code
Master data
Links company codes to a CO area.
CSKS
Cost center master data
Cost centers
Cost center, validity dates, hierarchy area.
CSKT
Cost center texts
Cost centers
Join to CSKS for names.
CSLA
Activity type master data
Cost centers
Activity types such as machine or labor hours.
CSSL
Cost center and activity type combinations
Cost centers
Where activity prices are tied to a cost center.
CSKA
Cost element master data (chart of accounts level)
Cost elements
Cost element categories.
CSKB
Cost elements data dependent on controlling area
Cost elements
Cost element type per CO area.
CSKU
Cost element texts
Cost elements
Names for cost elements.
CEPC
Profit center master data
Master data
Profit center and segment.
AUFK
Order master data
Orders
Internal orders and production orders share this header.
AFKO
Order header data for PP orders
Production orders
Planned dates, BOM and routing links.
AFPO
Order item
Production orders
Material, planned quantity.
AFRU
Order completion confirmations
Production orders
Confirmed yield, scrap and hours.
RESB
Reservation and dependent requirements
Production orders
Component requirements and issued quantities.
COBK
CO object: document header
Actual postings
One row per CO document.
COEP
CO object: line items by period
Actual postings
Line-level postings to cost objects.
COSP
CO object: cost totals for external postings
Actual postings
Period totals for primary costs.
COSS
CO object: cost totals for internal postings
Actual postings
Period totals for allocations and secondary costs.
COBRA
Settlement rule for order settlement
Settlement
Where order costs are settled.
COBRB
Distribution rules for settlement rule by object number
Settlement
Receivers and percentages.
PRPS
WBS (Work Breakdown Structure) element master data
Projects
Project cost object.
PROJ
Project definition
Projects
Header for WBS structures.
KEKO
Product costing header
Product costing
One cost estimate per material, plant, version and costing variant.
KEPH
Product cost estimate cost components
Product costing
Cost split by cost component.
MBEW
Material valuation
Valuation
Price control, standard price, moving average price.
MARC
Plant data for material
Valuation
Procurement type, MRP data.
T001W
Plants and branches
Organization
Plant master.
T001K
Valuation area
Organization
Links valuation area to company code.
CKMLHD
Material Ledger header
Material Ledger
Material Ledger document anchor per material and valuation area.
CKMLPP
Material Ledger period totals, quantities
Material Ledger
Period quantity data.
CKMLCR
Material Ledger currency and valuation views
Material Ledger
Period prices and values by currency type.
CRHD
Work center header
Work centers
Work center id, plant, category.
CRCO
Assignment of work center to cost center
Work centers
Links work center activities to cost centers.
PLKO
Task list header
Routing
Routing header.
PLPO
Task list operation
Routing
Standard values per operation.
MAST
Material to BOM link
BOM
Finds the BOM number for a material.
STKO
BOM header
BOM
BOM status and base quantity.
STPO
BOM item
BOM
Component and quantity.
ACDOCA
Universal Journal entry line items (S/4HANA)
S/4HANA
Holds FI and CO line items together.

In S/4HANA, many classic CO totals tables such as COSP and COSS are replaced by compatibility views over ACDOCA. Verify table availability in SE11 on your release.

SAP CO reporting without ABAP

An optional conversation on read-only, natural-language reporting over your SAP controlling data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the list

Search by table name or keyword. Each row shows the area, so you can filter to cost centers, production orders, product costing or Material Ledger. The typical-use column tells you why you would open the table in SE16N or SE11. Export to Excel to share with developers building custom reports.

  • Search a table such as COEP to see its description
  • Filter by area to see all product costing tables
  • Export for your documentation set

How the tables connect

A cost center in CSKS is posted to through CO documents: COBK holds the header, COEP the lines, and COSP and COSS the period totals. Production orders start in AUFK with AFKO and AFPO, pull component demand from RESB, and settle through COBRA and COBRB. Product costing writes headers to KEKO and component splits to KEPH, while MBEW stores the resulting standard price or moving average price on the material.

S/4HANA differences

From S/4HANA, the Universal Journal ACDOCA stores finance and controlling line items in one table, and several older CO tables are accessible only through compatibility views. Custom reports that read COEP or COSP directly may still work through those views, but new development should read ACDOCA or the released CDS views. Always confirm in your own system because behavior depends on release.

Common mistakes

Developers often read COSP and COSS separately and forget that COEP holds the line detail with a different period structure. Another mistake is joining KEKO to MBEW without matching the costing variant and version. When pulling cost center names, remember CSKT is language dependent and CSKS is time dependent, so filter on validity date.

  • Filter CSKS on the validity date
  • Match costing variant and version in KEKO
  • Include language key when joining text tables

Frequently Asked Questions

Which table holds SAP cost center master data?

CSKS holds cost center master data with validity dates, and CSKT holds the language-dependent names. Hierarchy relationships come from the standard hierarchy tables. Always filter CSKS by validity date because a cost center can have several time slices.

What is the difference between COSP and COSS?

COSP holds totals for external postings, which are primary costs posted from financial accounting or materials. COSS holds totals for internal postings such as allocations and activity allocations. Together they give period totals by cost object and cost element.

Where is the standard price of a material stored?

In MBEW. The VPRSV field shows the price control, S for standard or V for moving average. STPRS holds the standard price, VERPR the moving average price, and PEINH the price unit.

Does ACDOCA replace the old CO tables?

In S/4HANA, ACDOCA is the single line-item source for FI and CO, and older tables such as COEP are provided as compatibility views. Behavior depends on your release, so verify in the data dictionary before writing new reports.

If you need natural-language answers over SAP CO data without writing joins by hand, Netray can set up a read-only assistant on your own infrastructure.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring