SAP FICO Database Tables Reference (BKPF, BSEG, ACDOCA and More)
When a report is missing or a reconciliation does not tie, someone ends up in SE16N asking which table holds the data. This reference lists the standard FI, AA and CO tables with module and purpose so you can pick the right one first time.
| Table | Area | What it stores |
|---|---|---|
BKPF | FI | Accounting document header (company code, document number, fiscal year, posting date, document type) |
BSEG | FI | Accounting document segment (line items); in S/4HANA a compatibility view over ACDOCA and other tables |
BSIK | FI-AP | Vendor open items (secondary index) |
BSAK | FI-AP | Vendor cleared items (secondary index) |
BSID | FI-AR | Customer open items (secondary index) |
BSAD | FI-AR | Customer cleared items (secondary index) |
BSIS | FI-GL | G/L account open items (secondary index) |
BSAS | FI-GL | G/L account cleared items (secondary index) |
ACDOCA | S/4HANA | Universal journal line items for FI, CO, asset accounting and Material Ledger |
FAGLFLEXA | FI-GL | New General Ledger actual line items (ECC with new GL) |
FAGLFLEXT | FI-GL | New General Ledger totals |
GLT0 | FI-GL | G/L account totals in classic General Ledger |
SKA1 | FI-GL | G/L account master, chart of accounts level |
SKB1 | FI-GL | G/L account master, company code level |
SKAT | FI-GL | G/L account texts |
T001 | Org | Company codes |
T001W | Org | Plants and branches |
T003 | FI config | Document types |
TBSL | FI config | Posting keys |
TCURR | FI config | Exchange rates |
LFA1 | FI-AP | Vendor master, general data |
LFB1 | FI-AP | Vendor master, company code data |
KNA1 | FI-AR | Customer master, general data |
KNB1 | FI-AR | Customer master, company code data |
ANLA | FI-AA | Asset master record segment |
ANLZ | FI-AA | Asset time-dependent allocations (cost center, location) |
ANLC | FI-AA | Asset value fields by fiscal year and depreciation area |
ANEP | FI-AA | Asset line items |
TKA01 | CO | Controlling areas |
CSKS | CO-OM-CCA | Cost center master data |
CSKT | CO-OM-CCA | Cost center texts |
CSSL | CO-OM-CCA | Cost center and activity type combinations |
CSLA | CO-OM-CCA | Activity type master data |
COBK | CO | CO object document header |
COEP | CO | CO object line items (by period) |
COSP | CO | CO object totals, external postings (primary costs) |
COSS | CO | CO object totals, internal postings (secondary costs) |
AUFK | CO-OM-OPA | Order master data (internal and production orders) |
KEKO | CO-PC | Product costing header |
CKIS | CO-PC | Items of the unit costing and product costing |
MBEW | MM/FI | Material valuation (price, price control, valuation class) |
CEPC | CO-PCA | Profit center master data |
Several of these tables behave differently in S/4HANA, where line item data lives in ACDOCA and older tables such as BSEG, BSIK and GLT0 may be compatibility views or empty. Confirm in SE11 for your release before building extracts.
Need finance extracts from SAP without the join work?
Tell us which reports your team keeps rebuilding and we will outline how a read-only query layer could produce them from your SAP data.
Optional. The tool and every export work without this. No spam.
How to use the table
Search by table name or by what you want to find, for example open items or cost center. Open the table in SE11 to confirm the fields in your release, then query it in SE16N or an ABAP report. Export the filtered list as a team reference when you design extracts.
- BKPF plus BSEG joins on company code, document number and fiscal year.
- Open and cleared items live in separate index tables (BSIK and BSAK).
- Check client (MANDT) handling when you extract data.
Header, line item and index tables
The classic FI model stores one header in BKPF and many lines in BSEG. For speed SAP duplicates open and cleared items into index tables by account type: BSIS and BSAS for G/L, BSIK and BSAK for vendors, BSID and BSAD for customers. When an item is cleared it moves from the open table to the cleared table. Reports that need open items at a past date must therefore read both tables and filter on clearing date.
S/4HANA and the universal journal
In S/4HANA, ACDOCA is the single line item table for G/L, CO, asset accounting and Material Ledger. Totals tables such as GLT0 and COSP are replaced by views or calculated on the fly. If you are migrating custom reports, rebuild them on ACDOCA or the standard CDS views rather than on legacy tables that exist only as compatibility objects.
Common mistakes
A frequent error is reading BSEG without restricting company code and fiscal year, which is slow on large databases. Another is forgetting that CO line items sit in COEP by period and require COBK for the header. Developers also forget that texts live in separate tables, such as SKAT and CSKT, and need the language key in the join.
Frequently Asked Questions
What is the difference between BSEG and ACDOCA?
BSEG is the classic accounting document line item table. In S/4HANA, ACDOCA is the universal journal that holds all finance line items, and BSEG is provided as a compatibility view. New reports should read ACDOCA or the standard CDS views.
Why are open items in BSIK and not BSEG?
BSIK is an index table for vendor open items that SAP keeps for fast access. Reading BSEG for every open item scan would be slow. When items are cleared they move to BSAK.
Where are cost center names stored?
Cost center master data is in CSKS, with descriptions in CSKT by language and validity date. Join on controlling area, cost center and the validity range when you build a report.
Is this list complete?
No. It covers the core tables most FICO reports touch. Use SE11, SE16N or the data dictionary for the full picture in your own system.
If your analysts spend hours on table joins for each new finance question, a read-only natural-language layer over your SAP data can show the generated query alongside the answer. Netray can discuss what that looks like in your landscape.
Related Tools
SAP FICO Transaction Codes Reference
A searchable table of the finance and controlling transaction codes consultants and key users look up every day, with the area and what each does.
Developer ToolsSAP ABAP Open Items SELECT Generator
Fill in company code, vendor range and key date to get a ready-to-edit ABAP report that lists open vendor items with an overdue calculation.
Developer ToolsSAP ACDOCA SQL Query Generator
Build SQL over ACDOCA for account balances and line items by ledger, company code, fiscal year and period range.
SAPSAP Special G/L Indicators Reference
A quick lookup of special G/L indicators by account type, with what they are used for and how they differ from normal postings.
More SAP tools
See all- SAP Sales Document Types Reference
- SAP Pricing Procedure Design Worksheet
- SAP Item Category Determination Reference
- SAP Delivery Block Reasons Template
- SAP Credit Management Checklist
- SAP Output Determination Checklist
- SAP Billing Types Reference
- SAP Incompletion Log Checklist
- SAP SD Tables Reference (VBAK, VBAP, LIKP, VBRK and More)
Keep exploring
Free tools
- SAP FICO Transaction Codes ReferenceA searchable table of the finance and controlling transaction codes consultants and key users look up every day, with the area and what each does.
- SAP PM Database Tables ReferenceA searchable lookup of the core SAP PM tables, their key fields and what each is used for in reports and extracts.
- SAP Controlling (CO) Database Tables ReferenceA searchable reference of the SAP tables behind cost centers, internal orders, product costing and material valuation.