SAP ECC MRP Tables and MRP Element (DELKZ) Codes

This reference lists the SAP ECC 6.0 tables behind MRP and the most used MRP element codes (DELKZ) with the table each element comes from. It is for PP consultants and developers who need to report on MRP results or trace what MD04 is showing.

Download:
SectionTable / DELKZDescription / meaningKey or main fields / source tableUse
A: Table
MDKP
Header of the stored MRP list per material, plant and MRP area
DTNUM; MATNR, PLWRK, BERID, DISPO
Find the MRP list number for a material, then read MDTB
A: Table
MDTB
MRP list items with MRP element (DELKZ), dates and quantities
DTNUM, DTPOS; DELKZ, DELNR, DAT00, MNG01, PLUMI, AUSSL
Stored result of the last MRP run as shown in MD05
A: Table
MDVM
Planning file entries at plant level
MAFID, MDKEY (material and plant); GSAEN, AKKEN, RESAL
Which materials will the next net change run plan (plant level planning)
A: Table
DBVM
Planning file entries including MRP area
MAFID, DISST, MATNR, BERID; GSAEN, AKKEN, RESAL
Planning file when MRP areas are active; check with MD21
A: Table
MDLV
MRP area definitions
BERID; BERTY, WERKS
List MRP areas and their type (plant, storage location, subcontractor)
A: Table
MDLG
Storage locations assigned to an MRP area
BERID, WERKS, LGORT
Which storage locations belong to a storage location MRP area
A: Table
MDMA
MRP area data for a material
MATNR, BERID; WERKS, DISMM, DISPO, DISLS, MINBE
MRP parameters that override MARC for one MRP area
A: Table
T024D
MRP controllers
WERKS, DISPO; DSNAM
Name of MRP controller and mail settings
A: Table
T438A
MRP types
DISMM; DISVF procedure
Meaning of PD, VB, V1, ND and custom MRP types
A: Table
T438M
MRP groups (group stored in field MTART)
WERKS, MTART
Planning horizon, strategy group and other MRP group settings
A: Table
T439A
Lot-sizing procedures
DISLS
Meaning of EX, FX, WB, HB and custom lot sizes
A: Table
T399D
MRP control parameters per plant
WERKS; PLAHZ, UMTHZ, NKPAF, NKBAN
Plant parameters: planning horizon, number ranges, firming
A: Table
PLAF
Planned orders
PLNUM; MATNR, PLWRK, GSMNG, PSTTR, PEDTR
Open planned orders from MRP
A: Table
EBAN
Purchase requisitions
BANFN, BNFPO; MATNR, WERKS, MENGE, LFDAT
Requisitions created by MRP (ESTKZ shows the creation indicator)
A: Table
RESB
Reservations and dependent requirements
RSNUM, RSPOS, RSART; MATNR, BDMNG, BDTER
Dependent requirements of planned and production orders
A: Table
PBIM
Planned independent requirements, header per material
MATNR, WERKS, BEDAE, VERSB, PBDNR; BDZEI
PIR versions and requirement types
A: Table
PBED
Planned independent requirements, schedule lines
BDZEI, PDATU; PLNMG
PIR quantities per period (join to PBIM on BDZEI)
A: Table
MARC (MRP fields)
Plant data for material, MRP views
MATNR, WERKS; DISMM, DISPO, DISLS, BESKZ, SOBSL, DISGR, EISBE, PLIFZ
Main MRP settings per plant
B: DELKZ code
AR
Dependent reservation
RESB
Requirement
B: DELKZ code
BA
Purchase requisition
EBAN
Receipt
B: DELKZ code
BB
Subcontractor requirements of material provided
RESB (subcontract PO components)
Requirement
B: DELKZ code
BE
Purchase order item schedule line
EKET
Receipt
B: DELKZ code
BR
Process order
AFKO / AFPO
Receipt
B: DELKZ code
FE
Production order
AFKO / AFPO
Receipt
B: DELKZ code
IH
Maintenance order
AUFK / AFIH
Order element
B: DELKZ code
KB
Individual customer stock
MSKA
Stock
B: DELKZ code
LA
Shipping notification
EKES
Receipt
B: DELKZ code
LE
Scheduling agreement schedule line
EKET
Receipt
B: DELKZ code
LK
Stock with subcontractor
MSLB
Stock
B: DELKZ code
MR
Reservation
RESB
Requirement
B: DELKZ code
NE
Network order
AUFK / AFKO
Order element
B: DELKZ code
PA
Planned order
PLAF
Receipt
B: DELKZ code
PB
Project stock
MSPR
Stock
B: DELKZ code
PP
Planned independent requirement
PBIM / PBED
Requirement
B: DELKZ code
QM
Inspection lot for quality management
QALS
Receipt
B: DELKZ code
SB
Dependent requirement
RESB
Requirement
B: DELKZ code
SH
Safety stock
MARC-EISBE / MDMA
Requirement
B: DELKZ code
U1
Release order for a stock transfer order
EKET / EKPO in issuing plant
Requirement
B: DELKZ code
U2
Release order for a stock transfer requisition
EBAN in issuing plant
Requirement
B: DELKZ code
U4
Release order for stock transport scheduling agreement
EKET in issuing plant
Requirement
B: DELKZ code
UR
Stock transfer reservation
RESB
Requirement or receipt
B: DELKZ code
VC
Sales order
VBAP / VBEP
Requirement
B: DELKZ code
VE
SD scheduling agreement
VBEP
Requirement
B: DELKZ code
VJ
Delivery
LIPS
Requirement
B: DELKZ code
WB
Plant stock
MARD
Stock
B: DELKZ code
CH
Batch stock
MCHB
Stock
B: DELKZ code
JI
JIT call
JIT call tables
Requirement

DELKZ meanings are the fixed values of the MRP element domain in SAP ECC 6.0 (field MDTB-DELKZ). Source tables show where the underlying document lives; MD04 reads them live rather than from MDTB. Check SE11 in your release for industry-specific values.

Get an MRP exception report built from your tables

Tell us your plants and MRP controllers and we will outline a read-only report over MDKP, MDTB and the source documents.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

Where MRP data lives in SAP ECC

The planning file (MDVM, or DBVM when MRP areas are active) tells the next run which materials changed; MD20 and MD21 maintain and display it, and MDAB or MDRE rebuild it. MRP itself runs with MD01 (total planning online), MDBT (total planning in background), MD02 (single item, multi-level) and MD03 (single item, single level). The run creates planned orders (PLAF), purchase requisitions (EBAN) and schedule lines, and dependent requirements in RESB. If you save MRP lists, MDKP and MDTB store the result per material as shown in MD05. MD04, the stock/requirements list, is built live from the source documents every time you open it, so it is always current while MD05 reflects the last run. MRP Live (MD01N) is S/4HANA only.

  • MD04: live stock/requirements list
  • MD05: stored MRP list (MDKP / MDTB)
  • MD21: display planning file entries
  • MD06: collective MRP list display

Worked example: exceptions for one MRP controller

To list exception messages for MRP controller 001 in plant 1000, read MDKP where PLWRK = 1000 and DISPO = 001 to get the DTNUM values, then read MDTB for those DTNUM where AUSSL is not blank. AUSSL holds the exception key (for example 10 reschedule in, 15 reschedule out, 20 cancel). DELKZ on each row tells you whether the line is a planned order (PA), purchase requisition (BA), PO schedule line (BE) or sales order (VC), and DELNR gives the document number. MD06 shows the same collective list on screen; MDKP and MDTB are only filled when the MRP run creates MRP lists (creation indicator in MD01 or the MRP group).

Gotchas

MDTB is empty if MRP lists are not created, which is common after switching to MD04-only work. The MRP group is in T438M under field MTART, not DISGR, which confuses many SE16 queries. MRP areas move material parameters from MARC to MDMA; if a material has an MRP area, check MDMA before trusting MARC-DISPO. DBVM replaces MDVM as the planning file once MRP areas are activated in Customizing. Safety stock (SH) and plant stock (WB) are not documents, so they have no DELNR.

How to check the result in the system

Open MD04 for the same material and plant and compare each line's element label with the DELKZ codes in this table. For a stored list, MD05 shows exactly what MDTB holds. If counts differ, the MRP list is older than the documents; rerun MD03 for that material and compare again.

Frequently Asked Questions

Which table stores the MRP controller in SAP?

MRP controllers are defined in T024D (key plant and DISPO, with the name in DSNAM). The controller assigned to a material is MARC-DISPO, or MDMA-DISPO when the material is planned in an MRP area. Maintain them in Customizing under MRP controllers.

Which table stores MRP areas?

MDLV holds the MRP area definitions with type and plant, MDLG the storage locations assigned to a storage location MRP area, and MDMA the material data per MRP area. With MRP areas active, the planning file moves to DBVM, which includes the MRP area field BERID.

What is the MRP element table in SAP?

MDTB stores MRP list items with the MRP element code in DELKZ, such as PA planned order, BA purchase requisition, BE PO schedule line, VC sales order and SB dependent requirement. MDKP is its header. The documents themselves stay in PLAF, EBAN, EKET, VBEP and RESB.

Where is the MRP group stored?

The MRP group assigned to a material is MARC-DISGR. The MRP group definitions are in T438M, keyed by plant and the MRP group, which is stored in a field named MTART in that table. Maintain them in OPPR.

If your planners want to ask SAP ECC in plain English which orders are late against MRP and why, we can add a private AI layer over your MRP tables on your own servers.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder