SAP ECC Shipment and Shipment Cost Tables (VTTK, VTTP, VFKK, VFKP)
This reference lists the SAP ECC 6.0 tables and transactions for shipments (LE-TRA) and shipment costs, with key fields and the join path from delivery to shipment cost document. Use it to build freight reports or trace why a shipment has no cost document.
| Object | Type | Description | Key fields | Join path |
|---|---|---|---|---|
VTTK | Table | Shipment header: shipment type SHTYP, planning point TPLST, overall status STTRG, forwarding agent TDLNR, completion date DTABF | TKNUM | VTTP on TKNUM; TVTK on SHTYP |
VTTP | Table | Shipment items: one row per delivery in the shipment | TKNUM, TPNUM | VTTP-VBELN = LIKP-VBELN |
VTTS | Table | Stages of transport (legs, load and border points) | TKNUM, TSNUM | VTSP on TKNUM, TSNUM |
VTSP | Table | Stage of transport to shipment item allocation | TKNUM, TSNUM, TPNUM | VTTS and VTTP |
VTFA | Table | Shipment document flow: preceding and subsequent documents | TKNUM, VBELV, POSNV, VBTYP_V, VBELN, POSNN, VBTYP_N | TKNUM to VTTK |
VFKK | Table | Shipment cost header | FKNUM | VFKP on FKNUM |
VFKP | Table | Shipment cost items: REBEL is the referenced document (the shipment number for shipment-based cost items), REFTY its document category; KNUMV links to pricing | FKNUM, FKPOS | VFKP-REBEL = VTTK-TKNUM; VFKP-KNUMV to VFSI and KONV |
VFSI | Table | Shipment cost sub-items, for example per delivery item | KNUMV, KPOSN | VFSI-KNUMV = VFKP-KNUMV; VBELN, POSNR to LIPS |
VFKN | Table | Account assignment of shipment cost items (cost center, order, G/L) | FKNUM, FKPOS, LFNKN | VFKP on FKNUM, FKPOS |
TVTK | Table | Shipment types (customizing) | SHTYP | VTTK-SHTYP |
VEKP / VEPO | Table | Handling unit header and items; cross-check packed quantities in a shipment | VENUM / VENUM, VEPOS | VEKP-VPOBJKEY to delivery or shipment |
LIKP / LIPS | Table | Delivery header and items, the start of the join | VBELN / VBELN, POSNR | LIKP-VBELN = VTTP-VBELN |
VT01N | T-code | Create shipment | - | Writes VTTK, VTTP |
VT02N | T-code | Change shipment | - | - |
VT03N | T-code | Display shipment | - | - |
VT04 | T-code | Create shipments in collective processing (background capable) | - | Uses selection variants and grouping rules |
VI01 | T-code | Create shipment cost document | - | Writes VFKK, VFKP |
VI02 | T-code | Change shipment cost document (calculate, set transfer to create the service PO and entry sheet) | - | - |
VI03 | T-code | Display shipment cost document | - | - |
VI04 | T-code | Create shipment cost documents in collective processing | - | Selects shipments due for costing |
Field roles verified against the SAP ECC dictionary. In S/4HANA, LE-TRA shipments and shipment costs remain available, with SAP Transportation Management as the strategic successor; check the Simplification List for your target release before planning changes to VTTK-based reports.
Get a freight cost report outline for your ECC system
Tell us your shipment types and cost types and we will outline a read-only freight cost report from delivery to settlement.
Optional. The tool and every export work without this. No spam.
The join path from delivery to freight cost
Start at LIKP with the delivery number. VTTP has one row per delivery in a shipment, so VTTP-VBELN = LIKP-VBELN gives the shipment number TKNUM; one delivery can sit in more than one shipment (for example a preliminary leg and a main leg). VTTK holds the shipment header. Shipment cost items in VFKP point back to the shipment through REBEL (referenced document) with REFTY as the document category, so VFKP-REBEL = VTTK-TKNUM finds the cost items, and VFKK is their header through FKNUM. Calculated amounts sit in the pricing conditions (KONV through VFKP-KNUMV) and are split to delivery items in VFSI. Account assignment for settlement is in VFKN.
- LIKP-VBELN to VTTP-VBELN
- VTTP-TKNUM to VTTK-TKNUM
- VTTK-TKNUM to VFKP-REBEL
- VFKP-FKNUM to VFKK-FKNUM
Worked example: freight cost per delivery
A controller wants freight cost for delivery 80001234. VTTP returns shipment 0000004711, item 0001. VFKP with REBEL = 0000004711 returns shipment cost document 0000000123, item 000001, with net value in NETWR and KNUMV 0000876543. VFSI with KNUMV 0000876543 lists sub-items per delivery item, each with its share of the cost in NETWR, so summing VFSI for VBELN 80001234 gives that delivery's freight. VFKN shows the cost center or G/L the cost was assigned to when the document was transferred, which creates a service purchase order and entry sheet for settlement with the carrier.
Version differences and gotchas
STTRG in VTTK is the overall status: blank planned, 1 planning completed, 2 check-in, 3 loading start, 4 loading end, 5 shipment completion, 6 shipment start, 7 shipment end. Shipment cost relevance comes from the shipment type and the item category of the shipment cost type, so a shipment can exist without any VFKK. Do not assume VTTK disappears in an S/4HANA upgrade: LE-TRA is still delivered, and the decision to move to SAP TM is separate. Check the Simplification List for your target release instead of searching for a replacement table that may not exist.
How to check the result in the system
Open the shipment in VT03N and use Environment > Document flow to see the delivery and shipment cost documents. In VI03, the cost item's detail shows the reference to the shipment and the settlement data. If your SE16N join and the document flow disagree, check VTFA, which stores the shipment flow.
Frequently Asked Questions
Which table holds the shipment cost document in SAP SD?
VFKK is the shipment cost header (key FKNUM) and VFKP holds the shipment cost items (FKNUM, FKPOS). Sub-items per delivery item are in VFSI, linked through the condition number KNUMV, and account assignment for settlement is in VFKN.
What is the transaction code for shipment cost in SAP?
VI01 creates, VI02 changes and VI03 displays a shipment cost document. VI04 creates shipment cost documents in collective processing, often scheduled as a background job. Shipments themselves are VT01N, VT02N and VT03N, with VT04 for collective creation.
How do I link a delivery to its shipment in SAP?
Read VTTP with VBELN equal to the delivery number to get TKNUM, then read VTTK with TKNUM for the header. One delivery can appear in several shipments, so expect more than one row. VTFA also records the shipment document flow.
Is VTTK replaced in S/4HANA?
LE-TRA shipments, including VTTK and VFKK, are still part of S/4HANA, with SAP Transportation Management positioned as the strategic successor. Whether you keep LE-TRA is a project decision. Check the Simplification List for your exact target release before rewriting reports.
If your logistics team wants to ask SAP ECC in plain English what freight cost a customer or lane carried last month, we can add a private AI layer over these tables on your own servers.
Related Tools
SAP ECC Data Dictionary and Repository Tables Reference (DD02L, DD03L, T100, E070, TSTC)
Which SAP table holds table names, field lists, domain values, messages, transports and transaction codes, with key fields and join paths.
SAPSAP ECC ORDERS05 IDoc Segments and Qualifiers Reference
The ORDERS05 segments and qualifier values used for inbound sales orders and outbound purchase orders, with the SD and MM fields they map to.
SAPSAP ECC Movement Type to OBYC Transaction Key and GBB Account Modifier Reference
Look up which OBYC transaction key and GBB account modifier a SAP ECC movement type uses, so you know which G/L account a goods movement will hit.
More SAP tools
See all- SAP ECC Private AI Layer Blueprint Generator
- SAP ECC AI Assistant Sizing and Value Calculator
- SAP ECC SD User Exit Forms Reference (MV45AFZZ, RV60AFZZ, MV50AFZ1)
- SAP ECC Customer Exits (SMOD Enhancements) by Module Reference
- SAP ECC Classic BAdI Definitions Reference (MIGO, ME21N, MIRO, Deliveries, PM Orders)
- SAP ECC Background Job Tables Reference (TBTCO, TBTCP, Job Status Codes)
- SAP ECC Output Determination Tables and Codes Reference (NAST, TNAPR, NACE)
- SAP ECC Movement Type Configuration Tables Reference (T156, T156T, T157D)
- SAP ECC Stock Type and Location Transfer Movement Type Matrix
New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.
Keep exploring
Free tools
- SAP Core Tables and Key Fields ReferenceA searchable lookup of the SAP tables ABAP developers use most, with their primary key fields and owning module.
- SAP PM Database Tables ReferenceA searchable lookup of the core SAP PM tables, their key fields and what each is used for in reports and extracts.
- SAP PM Maintenance Order Types, Tables and Transactions ReferenceSearchable lookup of SAP plant maintenance order types, order transactions, order tables and system statuses.
ERP fixes and how-tos
- How to add AI to SAP ECC 6.0 on-prem without moving data to a cloudReference architecture for a private on-prem AI assistant on SAP ECC 6.0: RFC and BAPI reads, SLT replica, retrieval index, local LLM, permission mirroring.
- SAP SE16N vs SQVI: Table Browser vs Ad Hoc QuerySE16N shows one table with filters and exports; SQVI joins multiple tables into a reusable ad hoc query. Here is when to use each, with setup steps for a first SQVI query.
- Landed cost in SAP MM: planned and unplanned delivery costsHandle freight, duty and delivery costs in SAP MM: planned vs unplanned delivery costs, condition types, GR/IR posting and the effect on material valuation.
Runs with your ERP
- nShift Multi-Carrier Shipping and SAP ECCHow nShift connects SAP ECC and Business One to European carriers: booking, labels, documents and shipment data written back to SAP. Setup and pitfalls.
- PROGATE 6.0 Interface with SAP ECC and S/4HANAPROGATE is an SAP-certified web service interface that sends master data and orders from SAP to third-party MES and returns confirmations. Setup and pitfalls.
AI on your ERP
- Get AI Value From SAP ECC Now, and Use It to De-Risk the Move to S/4HANASAP ECC 6.0 mainstream maintenance ends in 2027. Add AI value on ECC now, using its existing BAPIs and IDocs, and use it to de-risk the S/4HANA migration.
- SAP AI Consulting for On-Prem and Private DeploymentsWhat to demand from an SAP AI consulting partner when data must stay on-prem or private: OData/BAPI mechanics, Joule vs. private LLM, and buyer questions.
Integrations
- How to add WhatsApp to SAP ECC 6.0How to connect WhatsApp Business to SAP ECC 6.0 using BAPIs, IDocs and output determination: order status, shipment alerts, approvals and supplier replies.
- How to connect Power BI to SAP ECC 6.0Connect Power BI to SAP ECC 6.0: SAP ERP connector, BW and warehouse options, on-prem data gateway, key manufacturing dashboards, and adding natural-language Q&A.