SAP Handling Unit Label Template (SSCC and GS1)
Handling unit labels connect the physical pallet or carton with its record in SAP. This template turns handling unit data into a clear label layout with the GS1 application identifiers most customers ask for.
Fill in
SAP Handling Unit Label Template
Handling Unit Label
Ship from: Acme Components Ltd 12 Industrial Road, Leeds, UK
Ship to: Northern Assembly GmbH, Hamburg Delivery: 80004512
Content
| Field | Value |
|---|---|
| Material | MAT-48213 |
| Description | Hydraulic fitting 12 mm |
| Batch | B24A0099 |
| Quantity | 480 EA |
| Gross weight | 612 kg |
| Packing date | 2026-10-20 |
| Internal HU | 00000000123456 |
| Destination bin | A-12-03 |
Barcode data (GS1-128)
(00) 003456780000123458 (01) 05012345678900 (10) B24A0099 (37) 480
Human readable line: (00)003456780000123458
Label developer notes
Print the SSCC barcode as GS1-128 with application identifier 00. Keep the human readable text under the barcode. Confirm the check digit calculation for the SSCC and the customer label standard before the first shipment.
Approvals
The SSCC check digit in the default is an example only. Generate real SSCCs from your GS1 company prefix and the number range in SAP. Always follow the customer's labeling specification.
Label data extract
Optional: we can outline how to build a read-only extract of handling unit data for label and EDI use.
Optional. The tool and every export work without this. No spam.
How to use the template
Enter the shipper, ship-to and delivery data, then the material, batch, quantity, weight and the SSCC. The preview shows the content table and the barcode data lines in the order labels normally carry them. Export to PDF for a review with the customer or to Word for the label developer. It also works as a specification for a Smart Forms or Adobe form change.
What the identifiers mean
The SSCC, application identifier 00, identifies one logistics unit worldwide, and has 18 digits including a check digit. The GTIN, identifier 01, identifies the trade item. Batch uses identifier 10, and the count of items in the unit uses identifier 37. Customers often add the ship-to location or purchase order, so confirm their specification. In SAP, the handling unit has an internal number that is separate from the SSCC and both can appear on the label.
- 00 for SSCC
- 01 for GTIN
- 10 for batch
- 37 for count of items
Common label mistakes
Frequent problems are a wrong check digit, a number range that overlaps with another plant, and barcodes too small to scan. Another common issue is mixing the internal handling unit number with the SSCC. Printing the label before the handling unit is final also creates duplicates when the pack is changed. Print at the end of packing and test scans with the real scanners and the real customer receiving system.
Frequently Asked Questions
What is an SSCC?
The Serial Shipping Container Code is an 18 digit GS1 number that uniquely identifies a logistics unit such as a pallet. It includes an extension digit, your company prefix, a serial reference and a check digit.
Is the SSCC the same as the SAP handling unit number?
Not necessarily. The handling unit number is the internal identifier in SAP. The SSCC is the external identifier on the label. SAP can generate or map an SSCC to the handling unit through external identification settings.
Which barcode format is used?
GS1-128 is common for logistics labels with application identifiers. Some customers also require 2D codes. Use the specification from the customer or the industry standard they follow.
Can I use this as an SAP form?
No. It is a layout and data specification. Developers rebuild it in Smart Forms, Adobe Forms or a label printing tool, and then link it to output management.
If your label data comes from several systems and keeps drifting, we can help build a controlled extract from SAP that feeds your label printing. We can do this on your own infrastructure.
Related Tools
SAP EWM Warehouse Process Types Reference
A searchable lookup of what a warehouse process type controls in SAP EWM, grouped by process category, with the configuration area for each setting.
SAPSAP Bin Capacity Calculator
Calculates how many pallets fit in a storage bin by width, depth, height and weight, so you can set bin type capacity values in WM or EWM.
SAPSAP EWM Wave Management Checklist
A checklist to design, run and review wave management in SAP EWM, from wave templates to release and closing.
SAPSAP Physical Inventory Procedures Checklist
A step-by-step checklist for planning, counting and posting physical inventory in SAP WM, EWM and Inventory Management.
More SAP tools
See all- SAP Storage Type Design Worksheet
- SAP Putaway Strategy Reference
- SAP Stock Removal Strategies Reference
- SAP EWM Storage Bin Master Data Load Worksheet
- SAP WM to EWM Migration Object Mapping Worksheet
- SAP EWM Go-Live Cutover Plan Template
- SAP EWM Warehouse Order Creation Rule Design Template
- SAP EWM Inbound Delivery Discrepancy Report Template
- SAP EWM Warehouse Task Exception Log Worksheet
Keep exploring
Free tools
- SAP EWM Warehouse Process Types ReferenceA searchable lookup of what a warehouse process type controls in SAP EWM, grouped by process category, with the configuration area for each setting.
- SAP EWM Go-Live Cutover Plan TemplateA fill-in document template for planning an SAP EWM warehouse cutover, from freeze and physical count to reconciliation and go/no-go.
- GS1-128 Pallet Label Field TemplateDefine the data content of a GS1-128 logistics label, including SSCC and common application identifiers, as a printable label spec.
ERP fixes and how-tos
- SAP QM Sample Label Printing: How to Print Physical Sample LabelsHow SAP QM sample label printing works: physical samples on an inspection lot, the QPR print transactions, the form behind the label and printer checks.
- SAP QM Integration With EWM and WM: Steps and ConfigurationHow SAP QM works with WM and EWM: inspection lot at goods receipt, quality inspection stock, usage decision, putaway and the configuration each model needs.
- Fishbowl Inventory UPS Integration: Setup and Common Rate and Label ErrorsHow to connect UPS to Fishbowl Inventory, get live rates and print labels, plus the usual causes of rate errors, rejected addresses and label failures.
Runs with your ERP
- BarTender label printing with SAP S/4HANA and ECCHow BarTender prints barcode, RFID and compliance labels from SAP S/4HANA and ECC using IDocs, SAP AII or files, versus the BarTender Cloud ERP connector.
- SAP EWM on S/4HANA: embedded vs decentralized for manufacturersSAP EWM embedded versus decentralized for manufacturing on S/4HANA: how each connects (qRFC, ALE, IDoc, DRF), production supply, picking, and when to choose which.
- Loftware with SAP ECC and S/4HANA: label design and printing from SAP transactionsHow Loftware and the NiceLabel ABAP package drive labels from SAP ECC and S/4HANA, including SAP GLM Plus, data flows, setup steps and pitfalls to avoid.
Guides
- Quoting Software for Label Printers Running Flexo and DigitalHow label converters quote pressure sensitive jobs: size, repeat, matrix, tooling and press time, where quotes go wrong, and how to speed up turnaround safely.
- AI for Estimating Label and Packaging Converting JobsHow AI can read customer inquiries and artwork specs, find similar past label and carton jobs, and draft an estimate for review, plus its limits.
- UDI Labeling Responsibilities for Medical Device Contract ManufacturersWho owns UDI at a medical device contract manufacturer, what the DI and PI mean, how labels get approved and printed, and how the ERP should store the data.