SAP Open Outbound Deliveries ABAP SELECT Generator (LIKP / LIPS)
Logistics coordinators regularly ask for a list of deliveries that are planned but not yet shipped. This generator produces an ABAP SELECT against the delivery header table LIKP and item table LIPS, filtered by plant, shipping point and planned goods issue date.
Fill in
ABAP: open outbound deliveries (not yet goods issued)
REPORT zr_open_deliveries.
DATA: lv_plant TYPE werks_d VALUE '1000',
lv_vstel TYPE vstel VALUE '1000',
lv_from TYPE dats VALUE '20261001',
lv_to TYPE dats VALUE '20261031',
lv_lfart TYPE lfart VALUE 'LF'.
SELECT likp~vbeln,
likp~lfart,
likp~vstel,
likp~wadat,
likp~kunnr,
lips~posnr,
lips~matnr,
lips~lfimg,
lips~vrkme,
lips~werks
FROM likp
INNER JOIN lips ON lips~vbeln = likp~vbeln
WHERE likp~lfart = @lv_lfart
AND likp~vstel = @lv_vstel
AND likp~wadat BETWEEN @lv_from AND @lv_to
AND likp~wadat_ist = '00000000'
AND lips~werks = @lv_plant
ORDER BY likp~wadat, likp~vbeln, lips~posnr
INTO TABLE @DATA(lt_open)
UP TO 5000 ROWS.
IF sy-subrc <> 0.
WRITE: / 'No open deliveries found.'.
RETURN.
ENDIF.
LOOP AT lt_open INTO DATA(ls_open).
WRITE: / ls_open-vbeln, ls_open-posnr, ls_open-matnr, ls_open-lfimg, ls_open-vrkme, ls_open-wadat.
ENDLOOP.Optional: goods movement status check
* In S/4HANA, goods movement status WBSTK is also on LIKP (A = not yet processed). * To restrict to unprocessed deliveries add this to the WHERE clause: * AND likp~wbstk = 'A' * On ECC systems the status lives in VBUK-WBSTK, so join VBUK on VBELN instead.
LIKP is the delivery header and LIPS the delivery item. WADAT is the planned goods movement date and WADAT_IST the actual goods movement date, which is initial until goods issue is posted. Test in a sandbox first, and verify field names in SE11 on your release. Add authority checks and a proper selection screen before using this as a production report.
Ask SAP delivery questions in plain English
Optional: see how a read-only natural language layer could answer open delivery questions from your SAP system.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter your plant, shipping point, delivery type and date range. The output updates with a complete report skeleton you can paste into SE38 or an ABAP development tool in Eclipse. Replace the WRITE statements with an ALV grid for real use. Because the SELECT uses the newer inline syntax with the @ escape, your system needs ABAP 7.40 or higher, which covers every S/4HANA release.
- VSTEL is the shipping point on the header.
- WERKS on the item is the delivery plant.
- LFIMG is the actual quantity delivered in sales unit VRKME.
How the logic works
In SAP, an outbound delivery stays open until the goods issue is posted. At that point the actual goods movement date WADAT_IST on LIKP is filled. While it is still initial (00000000) the delivery has not left. Comparing the planned date WADAT with today surfaces late deliveries. Joining LIPS gives material, quantity and unit per line, which you can then enrich with MAKT for descriptions or KNA1 for customer names.
Common mistakes
Developers often forget the item plant filter, which duplicates rows for multi-plant deliveries, or compare dates as strings with the wrong format. Another mistake is relying on the old VBUK status table in S/4HANA, where the statuses moved to the delivery header. Finally, large date ranges without UP TO n ROWS or indexes on a big LIKP can slow down a production system, so test with representative volumes.
Frequently Asked Questions
Which SAP tables hold outbound deliveries?
LIKP holds the delivery header and LIPS the delivery items. Document flow is tracked in VBFA. In ECC the header status fields were in VBUK and item status in VBUP. In S/4HANA the status fields were moved into the delivery tables.
How do I know a delivery has been goods issued?
The actual goods movement date WADAT_IST on LIKP is filled when the goods issue is posted, and the goods movement status WBSTK becomes C. While the date is initial, the delivery is still open for picking, packing or posting.
Can I use this in older SAP releases?
The syntax needs ABAP 7.40 SP08 or higher. For older releases, rewrite the SELECT in the classic form with an explicit INTO TABLE and declared work area, remove the @ escapes, and use the VBUK table for status checks.
Does this generator change data in SAP?
No. The output is a read-only SELECT. Even so, test it in a non-production system, add authority checks as required by your company and avoid unrestricted selections on large tables.
If you want natural language access to open deliveries and shipping status without building each report, Netray's ERPray can answer these questions read-only on top of your SAP data.
Related Tools
X12 856 Advance Ship Notice Generator
Fill in shipment, carrier and item details and get a clean X12 856 skeleton with shipment, order and item hierarchy to use as a test file.
Supply Chain & InventoryInternational Shipping Documents Reference
A lookup of the common export and import documents, what each is for, who issues it and which transport mode it applies to.
Supply Chain & InventoryExport Shipment Readiness Checklist
Work through documents, classification, screening, packing and booking before you release an export shipment to the carrier.
Supply Chain & InventoryPallet Dimensions by Region Reference
Compare the common pallet footprints used in North America, Europe, Asia and Australia, with floor area in square metres.
More SAP tools
See allNew to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- SAP Open Production Orders ABAP SELECT GeneratorFill in plant, order type and dates and get a ready ABAP Open SQL query for open production orders.
- SAP ABAP Open Items SELECT GeneratorFill in company code, vendor range and key date to get a ready-to-edit ABAP report that lists open vendor items with an overdue calculation.
- SAP Open PO Items ABAP SELECT GeneratorFill in plant, document type and dates to generate ABAP Open SQL that lists open PO items with received quantity from EKBE.