SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP WM and EWM Transaction Codes Reference

SAP warehouse work lives in a small set of transaction codes. This list covers the ones consultants and supervisors use daily in classic WM and in EWM, grouped by area so you can find the right one quickly.

Download:
SystemTransactionAreaWhat it is used for
WM
LT01
Transfer orders
Create a transfer order manually
WM
LT03
Transfer orders
Create a transfer order for a requirement
WM
LT04
Transfer orders
Create a transfer order from a transfer requirement
WM
LT12
Transfer orders
Confirm a transfer order (single document)
WM
LB01
Transfer orders
Create a transfer requirement manually
WM
LB03
Transfer orders
Display a transfer requirement
WM
LS01N
Bins
Create a storage bin
WM
LS02N
Bins
Change a storage bin (blocks, capacity, section)
WM
LS03N
Bins
Display a storage bin
WM
LX01
Stock reports
List empty storage bins
WM
LX02
Stock reports
Stock per storage bin
WM
LX03
Stock reports
Bin status report (occupancy by storage type)
WM
LX10
Stock reports
Warehouse stock overview by material
WM
LS24
Stock reports
Display stock per material in the warehouse
WM
LI01N
Physical inventory
Create a physical inventory document (WM)
WM
LI11N
Physical inventory
Enter inventory counts
WM
LI20
Physical inventory
Clear inventory differences
WM
LICC
Physical inventory
Cycle counting: create physical inventory documents
EWM
/SCWM/MON
Monitoring
Warehouse management monitor (documents, stock, tasks, resources)
EWM
/SCWM/PRDI
Inbound
Process inbound delivery
EWM
/SCWM/PRDO
Outbound
Process outbound delivery order
EWM
/SCWM/RFUI
Transfer orders
Radio frequency user interface for mobile devices
EWM
/SCWM/LS01
Bins
Create a storage bin
EWM
/SCWM/LS02
Bins
Change a storage bin
EWM
/SCWM/LS03
Bins
Display a storage bin
EWM
/SCWM/MAT1
Master data
Maintain warehouse product
EWM
/SCWM/PACKSPEC
Master data
Maintain packaging specification
EWM
/SCWM/WAVE
Waves
Wave processing
EWM
/SCWM/TU
Inbound
Maintain transportation unit (trucks and containers at the yard or door)

Descriptions are short paraphrases and menu texts differ slightly between releases. Some WM transactions are not available in S/4HANA systems where WM is replaced by embedded EWM, so check the simplification list for your release.

Role based SAP warehouse cheat sheet

Optional: send us your warehouse roles and we will suggest a transaction list per role for authorisation design.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the list

Search by code or by task, for example bin, cycle count or wave. Filter the Area column to see only physical inventory or only stock reports. Export the filtered list to Excel or PDF to build a role-based cheat sheet for your warehouse team or for authorisation design, where each transaction maps to an authorisation object and a business role.

WM and EWM transactions compared

In WM, most work flows through transfer orders created with LT01 or generated from deliveries, then confirmed with LT12 or by RF. In EWM, work is driven by warehouse tasks and warehouse orders, and the central transaction for supervisors is the warehouse monitor, /SCWM/MON. Where WM has separate reports for bins, stock and open orders, the EWM monitor presents them as nodes in one tree, which is faster for investigation but needs time to configure per user.

  • WM stock reports: LX02, LX03, LX10, LS24
  • EWM stock view: /SCWM/MON, stock and bin nodes
  • WM count entry: LI11N
  • EWM mobile work: /SCWM/RFUI

Common mistakes

Teams often give warehouse operators access to LX02 for convenience and then discover it runs slowly on large warehouses without filters. Another frequent error is granting create access to bins (LS01N) widely, which lets users create bins outside the storage type design. Authorisation should follow your bin and storage type governance, and master data creation should be limited to a small group.

Frequently Asked Questions

What is the difference between LT01 and LT03?

LT01 creates a transfer order by entering material, quantity, source and destination by hand. LT03 creates a transfer order for a requirement, so the system proposes bins using the putaway or removal strategies configured for the storage types.

Which transaction shows stock per bin in WM?

LX02 shows stock per storage bin and is the most used. LX03 gives a bin status report with occupancy by storage type. LS24 shows stock per material, which is the better starting point when you know the material.

What replaces the WM stock reports in EWM?

The warehouse monitor, /SCWM/MON, with its stock and bin nodes. You choose the warehouse number, drill into the node and filter by product, bin or handling unit. You can save layouts and variants for different roles.

Do these transactions work in S/4HANA?

Classic WM transactions are available in S/4HANA for the compatibility period, while embedded EWM transactions under /SCWM/ are the strategic path. Check the simplification list and the product availability matrix for your exact release.

If your team spends time hunting through transactions to answer simple stock questions, we can discuss a read-only assistant that answers them from your SAP data without giving users broader access.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Software