Scanned Quality Record Digitization SOP Template
Scanning quality records well decides whether OCR and document AI can use them later. This SOP defines the settings, naming, indexing and checks that give you a trustworthy digital record.
Fill in
Scanned Quality Record Digitization SOP Template
Standard Operating Procedure
Acme Precision Ltd SOP QP-0412, Revision A Effective: 2026-11-01 Title: Digitization of Quality Records
Purpose and scope
This procedure sets how paper quality records are scanned so the digital copy is complete, legible and readable by OCR and document AI.
Records covered: First article inspection reports, certificates of conformance, material test reports, calibration certificates, inspection travelers.
Scan settings
Resolution: 300 dpi Mode: Grayscale Format: searchable PDF (PDF/A where required by the customer) Deskew and blank page removal: on Do not apply aggressive compression that removes stamps, signatures or fine print.
Procedure
1. Check the paper record is complete, signed and dated.
2. Remove staples and unfold pages. Scan every side that has writing, stamps or markings.
3. Scan one record per file. Use separator sheets for batches.
4. Name the file using: RecordType_PartNo_LotOrPO_YYYYMMDD.pdf
5. Index the file with record type, part number, lot or PO, supplier and date.
6. Upload to: Controlled records library on the document management system
Verification
| Check | Method | Result |
|---|---|---|
| All pages present | Page count equals paper count | |
| Legibility | Zoom on signatures, stamps and numbers | |
| Index data | Compare to paper record | |
| OCR text | Search for part number in file |
Retention and disposal
Retention: As required by contract or customer flow-down, minimum 10 years Original paper: Retain for 30 days then destroy Disposal is recorded in the log and approved by the quality manager.
Approval
A starting point. Confirm that digital copies are acceptable to your customers, certification body and any regulator, and check the retention clauses in your contracts before destroying originals.
Index scanned records automatically
Optional: see how private document AI can read certificates and link them to ERP lots.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill in your document number, record types, scan settings, naming pattern and repository, then export to PDF or Word and route through your normal document control approval. Train the people who scan, and keep a short work instruction at the scanner. The naming pattern should match what your quality system and ERP use to find records, usually part number plus lot or PO.
Scan settings and why
Three hundred dpi grayscale is a common balance between readability and file size, and gives OCR enough detail for small print. Black and white at low resolution can wash out stamps, and heavy compression breaks fine characters. For handwritten entries, a higher resolution and a color or grayscale mode help both human readers and recognition models. Always keep the stamps and signatures that show the record is approved.
Verification and traceability
Check page count against the paper, then zoom into signatures, serial numbers and heat numbers. Run a text search on the part number to confirm the OCR layer. Record who scanned, who verified and when, so the digital copy has the same chain of custody as the paper. For AS9100 and ISO 9001 environments, this supports control of documented information, though your own audit rules decide what is required.
Common mistakes
Frequent errors are scanning only the front of a double-sided record, combining several certificates in one file, and destroying the paper before checking the copy. Another is changing the naming pattern midway through, which breaks searches and automated ingestion.
Frequently Asked Questions
What resolution should I scan quality records at?
Three hundred dpi is the usual choice for typed and printed records. Use higher resolution for small print or handwriting. Check your customer or regulator for any stated minimum before you set the standard.
Can I destroy paper after scanning?
Only if your contracts, customer flow-downs, regulators and certification body allow it. Many aerospace and defense contracts specify retention of originals or approved digital copies, so confirm this before you set a disposal rule.
Should scans be PDF/A?
PDF/A is designed for long-term archiving and is a good choice when records must remain readable for many years. Some customers require it, so check your contract and your document system support.
Why does naming matter for OCR?
Consistent names and index fields let ingestion systems link a document to the right part, lot or PO without guessing. Errors in the file name often cause downstream matching failures even when the OCR read is correct.
Netray builds private document AI that reads scanned certificates and test reports inside your network and links them to ERP lots and POs. Ask us how it fits your records process.
Related Tools
OCR Pilot Test Plan Template
A fill-in plan for piloting OCR or document AI on invoices or quality records, with scope, sample set, measures and exit criteria.
AI Agents & AutomationAI Extraction Human Review SOP Template
A fill-in SOP for human-in-the-loop review of OCR and AI extraction, with thresholds, roles, sampling and escalation.
AI Agents & AutomationOCR Exception Queue Triage Worksheet
Log each document that falls out of OCR into an exception queue, tag the root cause, and see aging and hours lost per category.
Supply Chain & InventoryVendor Invoice Submission Requirements Letter Template
A fill-in letter that tells suppliers exactly how to send invoices and certificates so your capture system reads them first time.
More Quality & Inspection tools
See all- First Article Inspection Report Template (AS9102, Excel)
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
Keep exploring
Free tools
- Shop Floor Digitization ScorecardA 10-question scorecard measuring how much of your shop floor still runs on paper - and which digitization gaps are costing you the most.
- AI Extraction Human Review SOP TemplateA fill-in SOP for human-in-the-loop review of OCR and AI extraction, with thresholds, roles, sampling and escalation.
- Epicor Shop Floor Labor Reporting SOP TemplateA fill-in standard operating procedure for how operators clock on, report quantities, record scrap and close operations in Epicor.
Guides
- Multimodal RAG Over Engineering Drawings and Scanned DocumentsMultimodal RAG for manufacturers: retrieving from CAD drawings, scanned specs, and PDFs with embedded tables, using vision embeddings and layout-aware parsing.
- The Digital Thread in Aerospace Manufacturing: How AI Finally Connects ItThe digital thread in aerospace manufacturing: how AI connects CAD, ERP, MES, and quality data into one traceable record from design through sustainment.
AI on your ERP
- AI for aviation MRO maintenance records and technical documentationOn-prem AI reads AD and SB packets, cross-checks logbooks and work orders against your MRO ERP, and drafts compliance narratives, without technical records leaving your network.
- Evaluating SAP for Industrial AI in Manufacturing: Strengths, Gaps and How to DecideAn honest look at SAP for manufacturing industrial AI: Digital Manufacturing, asset performance and Joule, where they fit and where gaps remain.
Integrations
- How to add document OCR to OdooHow to add OCR to Odoo: built-in Document Digitization, custom OCR for packing slips and certs, confidence thresholds, review queues and an on-prem option.
- How to add an AI chatbot to Dynamics 365 Finance and Supply ChainAdd an AI chatbot to Dynamics 365 Finance and Supply Chain: internal assistant or supplier and customer portal, grounded in ERP data, with on-prem model options.