Shrink Fit Heating Temperature Calculator
In a shrink fit the outer part is heated so the bore grows large enough to slide over the shaft, then it cools and grips. This calculator turns your interference and clearance into an oven temperature.
Your numbers
Largest shaft minus smallest hole, from the fit limits.
Typical 0.02 to 0.05 mm for small parts, more for large or slow assemblies.
Extra rise to cover heat lost before the part is in place.
Your results
Uses linear expansion with a constant coefficient. Check the maximum permitted temperature for hardened steel (tempering loss), bearing grease and seals, and coatings. Large parts, alloys and hollow sections may need verification by test.
Oven setpoint vs interference (C)
Sweeps Maximum diametral interference from 0.01 to 0.15, holding your other inputs fixed.
Standardise assembly parameters
Optional: a short guide on keeping calculated assembly parameters in controlled ERP work instructions.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the bore diameter, the largest interference the fit can have, and a small clearance so the part can be placed. Choose the material and the room temperature. The tool gives the diametral growth, the temperature rise and an oven setpoint with an allowance for cooling while you move the part. The chart shows how the setpoint climbs with interference, which helps you judge when heating alone is no longer practical and shaft cooling should be added.
The formula
Linear thermal expansion gives the change in diameter as the coefficient times the diameter times the temperature change. Rearranging, the temperature rise equals the needed growth divided by the product of the coefficient and the diameter. For a 50 mm steel bore with 0.05 mm interference and 0.03 mm clearance, growth is 0.08 mm and the rise is about 137 C, so the final temperature is about 157 C before the handling allowance.
- Use the maximum interference to be safe on every part
- Rises above about 250 C can temper hardened steel parts
- Bearings are usually limited to around 120 C
- Cooling the shaft with dry ice or liquid nitrogen adds growth difference
Common mistakes
People often use the nominal interference instead of the worst case, which leaves the largest shaft stuck halfway. Others heat a thick hub without allowing for the time it takes the core to reach temperature, so the bore is warm but the part is not. Assembly should be quick and aligned, ideally with a stop or fixture. Different materials in the pair matter: if the shaft is aluminum and the hub is steel, the holding force changes with operating temperature. Never exceed the temperature limit of seals or lubricants, and use proper lifting and PPE for hot parts.
Frequently Asked Questions
How do I calculate shrink fit temperature?
Divide the diametral growth you need (interference plus clearance) by the product of the thermal expansion coefficient and the bore diameter. Add the result to room temperature. For a 50 mm steel bore needing 0.08 mm, the rise is roughly 137 C.
What is the maximum safe temperature to heat steel for a shrink fit?
Many shops stay below about 250 to 300 C to avoid tempering and surface oxidation of hardened parts. Always check the heat treatment and any coating on the specific component, and do not exceed the limit of seals, bearings or grease.
When should I cool the shaft instead?
When the heating needed is too high or the hub cannot be heated safely. Cooling the shaft with dry ice or liquid nitrogen shrinks it and can be combined with moderate heating of the hub. Use the same formula with the shaft coefficient and a negative temperature change.
Does this give the holding torque?
No. Holding capacity depends on contact pressure, friction coefficient, length and material stiffness. This tool only calculates the heating needed to assemble the parts.
If assembly instructions like these live in ERP routings or work instructions, Netray can help turn calculated parameters into controlled operation notes.
Related Tools
Shaft and Hole Clearance Fit Limits Calculator
Type in nominal size and the hole and shaft deviations in micrometres. See minimum clearance, maximum clearance, mean clearance and whether the fit is clearance, transition or interference.
Quality & InspectionThermal Expansion Measurement Error Calculator
Find the measurement error caused by part and gage temperatures that differ from the 20 C reference, using each material's expansion coefficient.
Engineering & PLMMetric Thread Pitch Diameter and Tap Drill Calculator
Enter major diameter and pitch for any ISO metric thread. Get basic pitch diameter, minor diameters, tensile stress area and a tap drill size for your chosen thread engagement.
Engineering & PLMDrawing Tolerance Clarification Request Template
A structured form to raise a technical query about a drawing tolerance, datum scheme or GD&T callout, with the proposed interpretation, impact and a disposition signature.
More Engineering & PLM tools
See all- BOM Error Cost of Poor Quality Calculator
- ISO 286 IT Tolerance Grades Table
- GD&T Symbols Reference Table
- ISO 2768 General Tolerances Table
- Bolt Circle Hole Coordinates Calculator
- Engineering Drawing Review Checklist
- Linear Thermal Expansion Calculator (Two Materials)
- Press Fit Interference Pressure and Force Calculator
- Engineering Drawing Release Request Template
Keep exploring
Free tools
- Shaft and Hole Clearance Fit Limits CalculatorType in nominal size and the hole and shaft deviations in micrometres. See minimum clearance, maximum clearance, mean clearance and whether the fit is clearance, transition or interference.
- O-Ring Thermal Expansion and Clearance CalculatorPredict hot diametral clearance and hot squeeze when the bore, piston and elastomer expand at different rates between assembly and operating temperature.
- Hole and Shaft Fit Clearance WorksheetAn editable worksheet that computes minimum and maximum clearance (negative means interference) for each hole and shaft pair from their limit sizes.
Guides
- Why Seal and Gasket Margins Shrink: Closing the Gap Between Quote and Actual CostWhy seal and gasket margins shrink: quote vs actual variance from yield, scrap, tooling, minimums and paperwork, and how to close the loop from ERP data.
- Scheduling Autoclave and Oven Capacity in a Composites ShopHow to schedule autoclave and oven capacity for composite parts: load planning, cure recipes, tool availability, out-time limits and why generic scheduling fails.
- ERP for Foundries: Requirements That Actually MatterWhat a foundry ERP needs: heat and lot traceability, alloy and melt costing, pattern tracking, cleaning room routing, scrap by defect, and honest fit questions.