SuiteScript 2.x Modules Reference and Cheat Sheet
This is a lookup table for the SuiteScript 2.x N/ modules. Type a module name or a task into the search box and you get the module, what it is for and the methods most often used. It is meant for the moment you know what you want to do and cannot remember which module owns it.
| Module | What it is for | Key methods and objects |
|---|---|---|
N/record | Create, load, copy, transform, edit and delete records | create, load, copy, transform, submitFields, delete, Record.save |
N/search | Saved searches and ad hoc searches | create, load, lookupFields, Search.run, Search.runPaged, createFilter, createColumn |
N/query | SuiteAnalytics Workbook queries and SuiteQL | runSuiteQL, runSuiteQLPaged, create, load |
N/runtime | Script, user, account and feature context | getCurrentScript, getCurrentUser, accountId, envType, isFeatureInEffect |
N/log | Write entries to the Execution Log | debug, audit, error, emergency |
N/error | Create and throw structured errors | create, SuiteScriptError |
N/format | Convert between strings, dates and numbers by user preference | format, parse |
N/email | Send email from a script | send, sendBulk, sendCampaignEvent |
N/file | File Cabinet access | create, load, delete, copy, File.save |
N/https | Outbound HTTPS calls and secure strings | get, post, put, delete, request, createSecureString |
N/http | Outbound HTTP calls | get, post, put, delete, request |
N/task | Submit and monitor background tasks | create, checkStatus, TaskType (scheduled script, map/reduce, search, CSV import) |
N/url | Resolve URLs for scripts, records and domains | resolveScript, resolveRecord, resolveDomain |
N/redirect | Server-side redirects | toSuitelet, toRecord, toSavedSearch, redirect |
N/render | Print and PDF output, merge email templates | transaction, xmlToPdf, mergeEmail, statement, packingSlip |
N/xml | Parse and query XML | Parser, XPath.select, escape, validate |
N/encode | Encode and decode strings | convert, Encoding, Type |
N/crypto | Hashes and HMAC | createHash, createHmac, createSecretKey |
N/cache | Script-level caching across executions | getCache, Cache.get, Cache.put, Cache.remove |
N/currentRecord | Access the record in the browser (client scripts) | get, CurrentRecord.getValue, setValue, getSublistValue |
N/ui/serverWidget | Build Suitelet forms and lists | createForm, createList, Form.addField, Form.addSublist, Form.addSubmitButton |
N/ui/message | Banner messages in the browser | create, Message.show, Message.hide |
N/ui/dialog | Modal dialogs in the browser | alert, confirm, create |
N/workflow | Start workflows and fire workflow actions | initiate, trigger |
N/transaction | Transaction-level actions | void |
N/currency | Exchange rates | exchangeRate |
N/config | Load account configuration records | load, Type |
N/sftp | SFTP connections from a script | createConnection, Connection.upload, Connection.download, Connection.list |
N/util | Small helpers for 2.x scripts | each, extend, isArray, isObject, nanoTime |
Method lists are a working summary, not the full API. Confirm signatures and availability in the SuiteScript 2.x API reference for your release. Some modules work only on the server or only in client scripts.
Want NetSuite answers without writing scripts?
We can walk through how a read-only natural-language layer would sit over your NetSuite data.
Optional. The tool and every export work without this. No spam.
How to use the table
Search by module (for example N/query) or by intent (for example pdf, hash, redirect). Each row gives the purpose and the headline methods. Use the export buttons to take the table into Excel or PDF for a team wiki or a new-developer pack. Rows are read-only reference data, so there is nothing to fill in. The table covers the modules developers hit in daily SuiteScript 2.1 work, not every niche module NetSuite ships.
Choosing between N/search and N/query
N/search is the older, well known route and returns results through column objects. N/query with runSuiteQL lets you write SQL-style statements, join tables in one call and use functions such as BUILTIN.DF for display values. Many developers use N/search for simple saved-search work and N/query for reporting-style reads that need joins. Both consume governance units, and both page results, so use runPaged variants for large sets rather than pulling everything at once.
- Use N/record for single record create, edit and transform.
- Use N/search or N/query for set-based reads.
- Use N/task to push heavy work into a Map/Reduce or Scheduled script.
Server versus client availability
Not every module runs everywhere. N/currentRecord, N/ui/dialog and N/ui/message are for client scripts in the browser. N/ui/serverWidget, N/email, N/file and N/task run on the server. N/record, N/search and N/query run in both contexts with different limits and behavior, and client-side use can be slower and exposes logic to the browser. When a call fails with a module-not-available error, check the script type before anything else.
Frequently Asked Questions
What is the difference between SuiteScript 2.0 and 2.1?
SuiteScript 2.1 supports newer JavaScript syntax such as arrow functions, template literals, let and const. The N/ modules are the same set. New scripts are normally written as 2.1 and the annotation at the top of the file declares the version.
Do I need to load every module in define()?
Only load the modules the script uses. List them in the define array and receive them as function parameters in the same order. Loading unused modules adds clutter and does not help performance.
Which module should I use for REST calls to other systems?
Use N/https for outbound calls, which supports HTTPS and secure strings for credentials. N/http is available for plain HTTP, but most integrations should use HTTPS.
Is this table official NetSuite documentation?
No. It is a working summary written for convenience. The SuiteScript 2.x API reference in the Help Center is the authority for exact method signatures, parameters and release changes.
If your team spends time hand-writing lookups and reports against NetSuite data, ERPray can answer those questions in plain language over read-only data and show the query it ran.
Related Tools
SuiteScript Script Types and Entry Points Reference
Every SuiteScript 2.x script type with its entry point functions, typical use and governance guidance in one searchable table.
NetSuiteSuiteScript search.create Snippet Generator
Build a ready-to-paste N/search snippet with a filter, three columns and a paged result loop that respects governance.
NetSuiteSuiteQL Open Purchase Order Lines Query Template
A SuiteQL starter that lists purchase order lines with vendor, item, quantity and status filtered by date range and vendor.
NetSuiteSuiteScript Code Review Checklist
A practical review checklist for SuiteScript 2.x covering structure, governance, error handling, security and deployment.
More NetSuite tools
See all- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
- NetSuite User Access Request Form Template
- NetSuite Custom Record Design Spec Template
- NetSuite SuiteScript Deployment Handover Template
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- SuiteScript Code Review ChecklistA practical review checklist for SuiteScript 2.x covering structure, governance, error handling, security and deployment.
- SuiteScript Script Types and Entry Points ReferenceEvery SuiteScript 2.x script type with its entry point functions, typical use and governance guidance in one searchable table.
- SuiteScript 1.0 to 2.1 API Mapping Reference for NetSuiteLook up the SuiteScript 2.x module and method that replaces each common nlapi or nlobj call, with governance and behaviour differences to watch during migration.
ERP fixes and how-tos
- Fix NetSuite MODULE_DOES_NOT_EXIST in SuiteScript 2.xMODULE_DOES_NOT_EXIST means NetSuite cannot resolve a define() dependency. Check the file path, file cabinet location, extension and SDF deployment order.
- Avoiding governance limit errors in NetSuite Map/Reduce scriptsUnderstand how governance is allocated per key in NetSuite Map/Reduce scripts, why SSS_USAGE_LIMIT_EXCEEDED still happens, and how to design getInputData, map, reduce and summarize stages that do not time out.
- How NetSuite scheduled script queueing actually worksUnderstand why NetSuite Scheduled Scripts sit in Queued or Pending status, how account-level concurrency limits and deployment priority affect start time, and how to design self-rescheduling scripts that do not compound the queue.
AI on your ERP
- SuiteScript N/llm: Building Generative AI Inside NetSuite, and Knowing Its LimitsHow the SuiteScript N/llm module works: generateText, evaluatePrompt, embeddings, document grounding, free usage limits, OCI billing and when to go external.
- AI for NetSuite, Beyond the Built-In Text ToolsNetSuite's built-in AI covers text generation, not grounded answers on your own data. See how a private LLM over SuiteQL adds real Q&A and controls.
Integrations
- How to add WhatsApp to Oracle NetSuiteHow to connect WhatsApp Business to Oracle NetSuite: SuiteScript triggers, RESTlets, template messages, opt-in rules and two-way replies that post back to records.
- How to integrate Microsoft Teams with Oracle NetSuiteConnect Oracle NetSuite to Microsoft Teams: approval cards, alerts, bots and Entra ID sign-in using SuiteScript, RESTlets and Power Automate or Bot Framework.