SuiteScript Code Review Checklist
A review checklist stops the same SuiteScript defects from reaching production. Use this list in pull requests or peer review to check structure, governance, error handling, security and deployment before a script is released.
0 of 29 items complete
6 critical items still open - these are the highest-risk gaps.
Structure and style
Governance and performance
Error handling and logging
Context and security
Deployment and support
Aim to clear every critical item before release. Items outside your design (for example no Suitelets in a scheduled script) can be marked as not applicable.
Private AI code review
Optional: ask how a private, on-premises assistant could review scripts against your standards.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Work through each group while reading the code and the deployment record together. Tick items as you confirm them, not as you assume them. Critical items are the ones that most often cause outages or data problems; do not release with any of them open. Export the completed list to attach to the change ticket so the review leaves a record.
- Review code and deployment together
- Run the script in sandbox with realistic data before ticking performance items
- Record who reviewed and when
- Keep a shared list of recurring findings
Governance in practice
Each SuiteScript API call consumes governance units, and each script type has its own allowance. Loading a record costs more than a lookup, and doing it inside a loop multiplies the cost. Reviewers should look for loads, searches and saves inside iteration and ask what happens at ten times today's volume. Check the NetSuite help for the current unit costs and limits, since they are published per API and can change.
Common mistakes
Frequent review findings are scripts that fail silently because errors are caught and never logged, user events that run during imports and double-process records, and hard-coded internal IDs. Another is the deployment left in Testing status. Reviewers should also ask whether a saved search, workflow or built-in feature would meet the requirement without code at all.
- Empty catch blocks
- Scripts that ignore the execution context
- Hard-coded IDs and role names
- No owner after the developer leaves
Frequently Asked Questions
Does this apply to SuiteScript 1.0?
Most items about governance, error handling and security still apply, but the module and entry point items are specific to SuiteScript 2.x. Consider planning a migration of 1.0 scripts as part of your technical debt work.
Who should run the review?
Someone other than the author who understands both the code and the business process. For small teams, a structured self-review with this list is better than none, followed by a peer spot check.
How strict should we be on critical items?
Treat them as release blockers. They are chosen because failures in these areas cause user-visible errors, data corruption or security exposure.
Can I add my own items?
Export the list to Excel or Word and extend it with your team's rules, such as naming conventions or required unit test coverage.
If you want an AI assistant that reviews SuiteScript against your own standards on-premises, Netray can help build one.
Related Tools
SuiteScript Technical Design Document Template
Fill in a technical design document for a SuiteScript customization and export it as PDF or Word for sign-off before you write code.
NetSuiteNetSuite Sandbox to Production Deployment Runbook Template
Plan a NetSuite release with scope, deployment steps, validation and rollback in one runbook, and export it as PDF or Word.
NetSuiteNetSuite Script Deployment Inventory Worksheet
Keep an inventory of every SuiteScript and deployment with its owner, status and review date, and export it to Excel.
NetSuiteNetSuite RESTlet API Specification Template
Document a RESTlet endpoint with methods, payloads, authentication and errors so integration partners can build against it, and export to PDF or Word.
More NetSuite tools
See all- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
- NetSuite User Access Request Form Template
- NetSuite Custom Record Design Spec Template
- NetSuite SuiteScript Deployment Handover Template
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- SuiteScript 2.x Modules ReferenceA searchable table of the SuiteScript 2.x N/ modules, what each one is for and the methods you reach for most.
- NetSuite SuiteScript Governance Units EstimatorEstimate how many records a SuiteScript execution can process under its governance limit and how many runs a batch will need.
- SuiteScript Technical Design Document TemplateFill in a technical design document for a SuiteScript customization and export it as PDF or Word for sign-off before you write code.
ERP fixes and how-tos
- Fix NetSuite MODULE_DOES_NOT_EXIST in SuiteScript 2.xMODULE_DOES_NOT_EXIST means NetSuite cannot resolve a define() dependency. Check the file path, file cabinet location, extension and SDF deployment order.
- Fix NetSuite SSS_USAGE_LIMIT_EXCEEDED ErrorSSS_USAGE_LIMIT_EXCEEDED means your SuiteScript ran out of governance units. Learn the cause, how to check usage, and fixes using submitFields and Map/Reduce.
- Avoiding governance limit errors in NetSuite Map/Reduce scriptsUnderstand how governance is allocated per key in NetSuite Map/Reduce scripts, why SSS_USAGE_LIMIT_EXCEEDED still happens, and how to design getInputData, map, reduce and summarize stages that do not time out.
AI on your ERP
- SuiteScript N/llm: Building Generative AI Inside NetSuite, and Knowing Its LimitsHow the SuiteScript N/llm module works: generateText, evaluatePrompt, embeddings, document grounding, free usage limits, OCI billing and when to go external.
- AI for NetSuite, Beyond the Built-In Text ToolsNetSuite's built-in AI covers text generation, not grounded answers on your own data. See how a private LLM over SuiteQL adds real Q&A and controls.
Integrations
- How to add WhatsApp to Oracle NetSuiteHow to connect WhatsApp Business to Oracle NetSuite: SuiteScript triggers, RESTlets, template messages, opt-in rules and two-way replies that post back to records.
- How to connect Slack to Oracle NetSuiteAdd Slack to Oracle NetSuite: build a Slack app with slash commands, interactive approvals and alerts using SuiteScript, RESTlets and SuiteQL, with security notes.