SuiteScript Script Types and Entry Points Reference
Choosing the wrong script type is one of the most common causes of governance errors and brittle customizations. This table lists each SuiteScript 2.x script type with its entry point functions and a typical use, so you can pick the right one and write the correct annotation.
| Script type | @NScriptType value | Entry points | Typical use | Governance per execution |
|---|---|---|---|---|
Client Script | ClientScript | pageInit, fieldChanged, postSourcing, sublistChanged, lineInit, validateField, validateLine, validateInsert, validateDelete, saveRecord | Form behavior and validation in the browser | 1,000 units |
User Event Script | UserEventScript | beforeLoad, beforeSubmit, afterSubmit | Logic when a record is viewed, saved or deleted on the server | 1,000 units |
Scheduled Script | ScheduledScript | execute | Batch jobs run on a schedule or on demand | 10,000 units |
Map/Reduce Script | MapReduceScript | getInputData, map, reduce, summarize | Large parallel processing with automatic yielding | 10,000 units per function invocation, per stage rules apply |
Suitelet | Suitelet | onRequest | Custom pages, forms and server-side endpoints | 1,000 units |
RESTlet | Restlet | get, post, put, delete | Custom REST endpoints for integrations | 5,000 units |
Portlet Script | Portlet | render | Custom dashboard portlets | 1,000 units |
Workflow Action Script | WorkflowActionScript | onAction | Custom action inside a SuiteFlow workflow | 1,000 units |
Mass Update Script | MassUpdateScript | each | Per-record logic for mass update jobs | Check Help Center for your release |
Bundle Installation Script | BundleInstallationScript | beforeInstall, afterInstall, beforeUpdate, afterUpdate, beforeUninstall | Setup tasks when a SuiteApp is installed or updated | Check Help Center for your release |
Governance numbers change by release and context. Treat the figures as planning guidance and confirm them in the SuiteScript governance documentation for your account before you design around them.
Review of your SuiteScript estate
Optional: send us a list of your scripts and deployments and we will suggest where to simplify.
Optional. The tool and every export work without this. No spam.
How to read the table
The annotation column is the exact value you place after @NScriptType in the file header. Entry points are the function names NetSuite expects the script to return from define(). Search for a function name such as afterSubmit to find which script type owns it. Export the table to share with a team or to include in a coding standard.
Picking a type by workload
Use a User Event script for logic tied to one record event, a Client script for browser validation, a Suitelet for a custom page and a RESTlet for an integration endpoint. For work that touches thousands of records, move to Scheduled or Map/Reduce. Map/Reduce is built for volume because it splits work into stages and yields automatically, while a Scheduled script must watch its own remaining usage.
- Heavy work in a User Event slows every save and risks the usage limit.
- Keep afterSubmit light and push long work to a queued task.
- Never rely on client scripts alone for rules that must always hold.
Common mistakes
Developers often write heavy search loops inside beforeSubmit, which makes saves slow for every user. Another frequent error is putting security-sensitive validation only in a client script, which can be bypassed by imports, web services and scripts. Also check that the entry point names are spelled exactly, since a misspelled function is simply ignored and the script appears to do nothing.
Frequently Asked Questions
Which script type should I use for an integration?
A RESTlet is the usual choice for a custom inbound endpoint. For scheduled outbound sync, use a Scheduled or Map/Reduce script. Standard REST and SOAP web services may be enough without any script.
When should I choose Map/Reduce over Scheduled?
Choose Map/Reduce when you process many independent records and want parallelism and automatic governance handling. Choose Scheduled when the job is small, sequential or order dependent.
Can I run a User Event script on CSV import?
Yes. User Event scripts run on server-side saves including imports and web services, unless the script deployment or logic excludes that execution context. Check the context in your code if behavior should differ.
Are governance units the same for every account?
Not always. Limits are published per script type, but they can be revised between releases. Verify the current numbers in the Help Center before designing a high-volume script.
If you maintain a large estate of SuiteScript customizations and want help reviewing them, Netray and its partners can look at your scripts and suggest which to simplify or retire.
Related Tools
SuiteScript 2.x Modules Reference
A searchable table of the SuiteScript 2.x N/ modules, what each one is for and the methods you reach for most.
NetSuiteSuiteScript 2.1 RESTlet Skeleton Generator
Fill in a few fields and get a SuiteScript 2.1 RESTlet starter with all four handlers, logging and structured error responses.
NetSuiteSuiteScript Code Review Checklist
A practical review checklist for SuiteScript 2.x covering structure, governance, error handling, security and deployment.
NetSuiteNetSuite Script and REST Error Codes Reference
Common NetSuite error names and HTTP status codes with the usual cause and the first thing to check.
More NetSuite tools
See all- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
- NetSuite User Access Request Form Template
- NetSuite Custom Record Design Spec Template
- NetSuite SuiteScript Deployment Handover Template
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- NetSuite SuiteScript Governance Units by Script TypeA lookup of governance unit limits for each SuiteScript script type and the design guidance that follows from them.
- SuiteScript 2.x Modules ReferenceA searchable table of the SuiteScript 2.x N/ modules, what each one is for and the methods you reach for most.
- SuiteScript Code Review ChecklistA practical review checklist for SuiteScript 2.x covering structure, governance, error handling, security and deployment.
ERP fixes and how-tos
- Fix NetSuite SSS_USAGE_LIMIT_EXCEEDED ErrorSSS_USAGE_LIMIT_EXCEEDED means your SuiteScript ran out of governance units. Learn the cause, how to check usage, and fixes using submitFields and Map/Reduce.
- Avoiding governance limit errors in NetSuite Map/Reduce scriptsUnderstand how governance is allocated per key in NetSuite Map/Reduce scripts, why SSS_USAGE_LIMIT_EXCEEDED still happens, and how to design getInputData, map, reduce and summarize stages that do not time out.
- How NetSuite scheduled script queueing actually worksUnderstand why NetSuite Scheduled Scripts sit in Queued or Pending status, how account-level concurrency limits and deployment priority affect start time, and how to design self-rescheduling scripts that do not compound the queue.
AI on your ERP
- SuiteScript N/llm: Building Generative AI Inside NetSuite, and Knowing Its LimitsHow the SuiteScript N/llm module works: generateText, evaluatePrompt, embeddings, document grounding, free usage limits, OCI billing and when to go external.
- AI for NetSuite, Beyond the Built-In Text ToolsNetSuite's built-in AI covers text generation, not grounded answers on your own data. See how a private LLM over SuiteQL adds real Q&A and controls.
Integrations
- How to add WhatsApp to Oracle NetSuiteHow to connect WhatsApp Business to Oracle NetSuite: SuiteScript triggers, RESTlets, template messages, opt-in rules and two-way replies that post back to records.
- How to integrate Microsoft Teams with Oracle NetSuiteConnect Oracle NetSuite to Microsoft Teams: approval cards, alerts, bots and Entra ID sign-in using SuiteScript, RESTlets and Power Automate or Bot Framework.