Aerospace & DefenseFree templatePDF, Excel, Word exportAerospace MRO

MRO Technician Task Card Template

A task card is the unit of work in a maintenance package. It must point to approved data, list what is needed and capture who did and who checked the job. This template builds one in a few minutes.

Fill in

Live preview
Download:

MRO Technician Task Card Template

Task Card

Work package: WP-2026-0315 Card no.: TC-0142 Aircraft: N482SW (Regional turboprop) Task: Main landing gear actuator inspection

Reference and Access

Data reference: AMM chapter 32, current revision Zone or access: Left main gear bay, access panel 191 Estimated man-hours: 6

Tools and Equipment

Torque wrench (calibrated), borescope, gear lock pins

Parts and Consumables

Part no.DescriptionQtyBatch or serial

Instructions

1. Safe the aircraft and fit gear pins. 2. Open access panel and clean area. 3. Inspect actuator rod for scoring and leaks. 4. Record findings. 5. Close up and remove tooling.

Findings

Findings or defects raised (reference non-routine card if any): ______________________

Certification

Technician / Date
Independent inspector (if required) / Date
Certifying staff / Date

Task cards must reference current approved maintenance data. Never copy manufacturer text into a card without the licence to do so; cite the reference instead.

Task cards from your work orders

Optional review of generating cards from ERP or MRO work orders.

Optional. The tool and every export work without this. No spam.

How to use it

Enter the package and card number, the aircraft, the task title and the data reference. List special tools and describe the steps in your own words, citing the manual chapter rather than copying it. Export to PDF and release it with the work package, or to Word for further edits. The parts and findings areas stay blank for the technician to complete at the aircraft. Keep revision control on the card so the reference is always the current effective data.

What a good task card contains

Good cards remove ambiguity at the aircraft. They name the data, the zone, the tooling and the required inspection stages, so the technician does not have to hunt.

  • Unique card number linked to the work package and aircraft
  • Reference to current approved maintenance data and revision
  • Tooling and calibrated equipment needed
  • Parts and consumables with traceability space
  • Separate sign-off for technician and independent inspection where required

Common mistakes

The most common issue is a stale data reference, where the card cites a superseded revision. Next is signing a whole card for a multi-step task without recording sub-steps, which hides skipped actions. Do not bury a defect in the comments; raise a separate non-routine card so cost, parts and release are tracked. If your MRO system generates cards automatically, use this form for ad hoc jobs, customer-specific tasks and training.

Frequently Asked Questions

Can I add my company logo and number format?

Fill the station details into the card title and export to Word, where you can add a logo and header. Card number formats should follow your own document control procedure.

Should I paste AMM text into the card?

Generally no. Manufacturer data is copyrighted and changes by revision. Reference the chapter, section and revision, and let the technician work from the current approved data.

Who signs a task card?

The technician who performed the work signs, a second person signs where independent inspection is required, and certifying staff sign for release. Your procedures define exactly who.

How do I handle a defect found during the task?

Raise a non-routine card, reference the parent card, and track it separately. The non-routine findings log worksheet on this site helps keep them together.

If you want task cards, parts and labor to flow from one planning record into your ERP, we can discuss how to wire it.