Developer ToolsFree referencePDF, Excel, Word exportInfor SyteLineAll Infor SyteLine (CloudSuite Industrial) tools

SyteLine Event Action Types Reference

This is a reference of the 26 application event action types on the Event Actions form in Infor SyteLine 8, 9 and 10. Each row says what the action does, which parameters matter, a typical SyteLine use and whether it makes the handler wait.

Download:
Action typeWhat it doesKey parameters to setTypical use in SyteLineWaits or suspends
Achieve Milestone
Records a milestone and sets the designer-defined event state, then the handler continues
State text (read later with EVENTSTATE)
Show 'Credit approved' on Event Status partway through an approval flow
No
Attach
Attaches, links, updates or detaches document attachments on records while the handler runs
Record, document, attach or detach mode
Link a signed PDF to a customer order during an approval flow
No
Audit
Writes an audit entry for the handler run
Text or expression to record
Record who approved a price override and when
No
Branch
Jumps to another action in the sequence when a condition is met
Condition, destination action
Skip the approval prompt when the order total is below a limit
No
Call Database Method
Runs a stored procedure or database function
Method name, input and output parameters
Call a custom stored procedure that writes to a user-defined table
No
Call IDO Method
Invokes a method on an IDO with parameters and captures output parameters
IDO, method, parameter list, output variables
Call a SyteLine IDO method to recalculate or post after a change
No
Call Web Service
Calls an external web service and returns the response
URL, request, result variable
Check a carrier or tax service from an event
No
Dispatch IDO Request
Sends an IDO request to a site or system the user is not connected to
URL() of the target, IDO request XML, result variable
Read or update data in another SyteLine site; parse the result with Transform XML
No
Execute IDO Request
Runs an IDO request XML in the current configuration
IDO request XML, result variable
Run a multi-step IDO request built from expressions
No
Fail
Stops the handler with Failure status when its condition is met
Condition, result message
Block deletion of an item, or reject an update that breaks a rule
No
Finish
Ends the handler with Success and an optional result message shown on Event Status
Condition, result message, state
End early once an approval is granted
No
Generate Event
Fires another event, usually a custom one, with parameters
Event name, parameters, synchronous or not
Split a long flow into reusable custom events
No
Goto
Jumps unconditionally to another action
Destination action
Loop back to a prompt after a rejection is reworked
No
Load IDO Collection
Loads rows from an IDO into a named result set
IDO, properties, filter, record cap, result set name
Load open lines for an order, then read them with P3 and ROWS(collection)
No
Load IDO Row
Loads one row from an IDO and puts property values into variables
IDO, properties, filter, target variables
Read a customer's credit limit before deciding to prompt
No
Notify
Sends a message to users or groups that needs no response
Recipients, subject, body, attachments
Tell the buyer a PO receipt was posted
No
Prompt
Sends a message that requires a response, with optional voting rules and timeouts
Recipients, choices, voting rule, timeout and destination
Credit-hold release approval on an SLCos update
Yes
Run Background Task
Submits a background task, such as a report or utility
Task name, parameters
Run a report after an approval is granted
No
Send BOD
Builds a BOD from noun, verb and body and places it in the Replication Document Outbox
BOD noun, BOD verb, body expression
Publish a custom BOD to ION when a record changes
No
Send Email
Sends an email to addresses outside the Inbox
To, subject, body, attachments
Email a supplier when a PO line due date changes
No
Set Attributes
Sets attributes of the running handler or event as listed on its parameter form
Attribute names and values
Set values that later actions or Event Status read
No
Set Values
Assigns values to event variables, or to properties of the row in an On item event
Variable or property names and expressions
Default a field on SLCoitems insert before the save commits
No
Sleep
Pauses the handler for a period of time
Duration
Wait before re-checking an external status
Yes
Transform XML
Applies a transform to XML and returns the result
Source XML, transform, result variable
Parse the result of a Dispatch IDO Request
No
Update Collection
Inserts, updates or deletes rows in an IDO collection
IDO, action (insert, update, delete), property values
Write a log row to a user-defined table IDO
No
Wait
Holds the handler until a condition is true or a timeout passes, then resumes
Condition, retest interval, timeout
Wait until a job is released before notifying the shop
Yes

The 26 action types follow the SyteLine Action Type help. Newer releases can add further types, so check the Action Type list on your own Event Actions form. Parameter names are shown in plain terms: build exact syntax with Edit Parameters and Check Syntax.

Design an approval flow with us

Describe the approval or alert you want in SyteLine and we will send back a handler and action sequence you can build, with the synchronous and suspend settings it needs.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search for the job you need to do, for example 'approval', 'BOD' or 'block'. In SyteLine, open Event Handlers, pick the handler, click Event Actions, choose the Action Type and click Edit Parameters. Each action type opens its own parameter form, which writes the correct syntax back to the Parameters field. Infor recommends using those forms rather than typing parameters by hand, then clicking Check Syntax before saving. Give every action a description: when a handler has several Notify or Set Values steps, the description is what you see in the sequence list and in Event Status.

Synchronous handlers and actions that suspend

A synchronous handler runs inside the user's request, and if it fails the whole sequence fails, which is what lets Fail block a save. Prompt, Wait and Sleep are adjourning actions: they wait for an outside stimulus or a time, and the event system sets the handler to retest or time out and resumes it later. That only works when the handler is allowed to suspend. For a user-facing validation, keep the synchronous part short and decisive (Load IDO Row, Branch, Fail) and move people-based approvals into a flow that can suspend.

  • Fail and Finish end the handler; Branch and Goto move within it
  • Prompt with several recipients needs a voting rule: Majority, Plurality, Conditional Plurality or Minimum Count
  • Use Notify for information, Prompt only when you need an answer

Worked example: block item deletion

Create a synchronous handler on IdoOnItemDelete applying to SLItems. Action 1, Load IDO Row, reads whether the item has open demand into a variable. Action 2, Fail, has a condition on that variable and a message such as 'Item has open orders; set it to Obsolete instead'. Action 3, Finish, ends with Success. Users deleting a clean item see no change, while a delete with open orders is rejected with the message. The same pattern, swapped to a Prompt, gives a credit-hold approval on SLCos updates.

Common mistakes

The most common mistake is putting Prompt in a handler that cannot suspend and then wondering why users wait or the action errors. The second is using Execute IDO Request when the target is another site; Dispatch IDO Request is the one built for a system the user is not connected to. Third, people send Send BOD output and expect it to arrive immediately: the BOD goes to the Replication Document Outbox first, so check that form when it does not appear in ION. Finally, a Load IDO Collection without a tight filter and record cap can load thousands of rows on every save.

Frequently Asked Questions

What is Infor Mongoose?

Mongoose is the Infor application framework SyteLine and CSI are built on. It provides IDOs (the business object layer), the WinStudio form designer, the application event system with these action types, background tasks and the IDO request service used by APIs. Customising SyteLine mostly means working in Mongoose tools.

What is the difference between Notify and Prompt?

Notify sends a message that needs no reply and the handler carries on. Prompt sends a message with choices, waits for the response and returns it to the handler, optionally counting votes from several recipients and applying a timeout. Because Prompt waits, the handler must be able to suspend.

When should I use Dispatch IDO Request instead of Execute IDO Request?

Use Execute IDO Request to run an IDO request in the configuration where the event is running. Use Dispatch IDO Request when the request has to run on another site or system the user is not connected to, given by a URL. Its result comes back as XML that you usually parse with Transform XML.

Where do I see whether my event action ran?

Open the Event Status form for the event run, then Event Handler Status for each handler. You can see the actions executed, the result (Success or Failure), messages from Finish or Fail and any state set by Achieve Milestone. Prompts waiting for responses appear there too.

If you want approvals and notifications like these driven by plain-English questions over SyteLine data on your own servers, we can build that with you.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP