SyteLine SQL Query Generator for Item, Job and Customer Order Tables
Anyone writing SyteLine reports ends up in the same four tables: items, jobs, customer orders and order lines. The base tables carry a site reference and a few naming quirks that trip up newcomers. This generator builds clean read-only queries you can adapt.
Fill in
1. Items by prefix
SELECT i.item, i.description, i.u_m, i.p_m_t_code, i.product_code, i.unit_cost, i.lead_time FROM item_mst i WHERE i.site_ref = 'SITE1' AND i.item LIKE 'PN-%' ORDER BY i.item;
2. Jobs by status and date
SELECT j.job, j.suffix, j.item, j.qty_released, j.qty_complete, j.qty_scrapped, j.stat, j.job_date FROM job_mst j WHERE j.site_ref = 'SITE1' AND j.stat = 'R' AND j.job_date >= '2026-10-01' AND j.job_date < DATEADD(day, 1, '2026-10-31') ORDER BY j.job_date, j.job, j.suffix;
3. Open customer order lines
SELECT c.co_num, c.cust_num, ci.co_line, ci.co_release, ci.item,
ci.qty_ordered, ci.qty_shipped,
(ci.qty_ordered - ci.qty_shipped) AS qty_open,
ci.due_date, ci.stat
FROM coitem_mst ci
JOIN co_mst c
ON c.co_num = ci.co_num AND c.site_ref = ci.site_ref
WHERE ci.site_ref = 'SITE1'
AND ci.stat = 'O'
AND ci.due_date >= '2026-10-01'
AND ci.due_date < DATEADD(day, 1, '2026-10-31')
ORDER BY ci.due_date, c.co_num, ci.co_line;4. Demand and supply by item
SELECT ci.item,
SUM(ci.qty_ordered - ci.qty_shipped) AS open_demand,
(SELECT SUM(j.qty_released - j.qty_complete)
FROM job_mst j
WHERE j.site_ref = ci.site_ref AND j.item = ci.item AND j.stat = 'R') AS open_job_supply
FROM coitem_mst ci
WHERE ci.site_ref = 'SITE1'
AND ci.stat = 'O'
AND ci.item LIKE 'PN-%'
GROUP BY ci.item, ci.site_ref
ORDER BY open_demand DESC;Read-only queries for SQL Server. Table and column names shown are those commonly found in SyteLine databases, but they can differ by version and customization, so confirm them in your own schema before running. Run against a reporting copy or with read-only access where possible, and always include the site reference filter in multi-site installations.
Ask SyteLine in plain English
Optional: see a read-only assistant that writes and shows the SQL for your questions over SyteLine data.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter your site reference, an item prefix, a job status code and a date range, then copy the queries you need. Each block stands alone, so paste one into SQL Server Management Studio, a report builder or a script. The queries use the underlying tables with an explicit site filter, which makes results predictable in multi-site databases. Start with a narrow filter and a small date range, then widen it once the output looks right.
- Always filter on the site reference.
- Test on a reporting copy or with a read-only login.
- Add row limits while exploring.
How the tables relate
The item table holds master data such as unit of measure, source code, cost and lead time. The job table holds production orders keyed by job and suffix with released, completed and scrapped quantities. The customer order header carries the customer and order dates, while order lines carry item, quantities, due date and status. Lines join to headers on order number and site. Comparing open order line quantity to open job quantity by item gives a first view of whether demand is covered by supply.
Common mistakes and safeguards
Forgetting the site filter returns rows from every site and silently multiplies numbers. Hard coding status letters without checking meaning gives wrong totals, so confirm the values in your own data. Using date comparisons that ignore the time portion drops rows on the last day, which is why the queries use a less-than test against the next day. Never update SyteLine tables with SQL: changes bypass validation and audit. Use the application, IDO methods or supported import tools for writes.
- Read with SQL, write through IDOs or the application.
- Check stat values against the status reference.
- Prefer a reporting replica for heavy queries.
Frequently Asked Questions
Why do SyteLine tables end with _mst?
The base tables carry an _mst suffix and include a site reference column. Views without the suffix usually filter to the current site context. When querying directly with SQL, use the base tables and filter on the site reference yourself.
Can I use these queries in Power BI or SSRS?
Yes, they are standard T-SQL selects. Parameterize the site, dates and status instead of typing literals, and use a reporting login with read-only permissions. For large tables, filter early and avoid selecting every column.
Is it safe to run SQL against the production database?
Read-only selects are generally safe if they are filtered and efficient, but heavy queries can slow users. Prefer a replica or reporting copy, set a read-only login and avoid unfiltered scans of large tables during working hours.
How do I find the right column names for my version?
Query the database information schema for the table, or inspect the IDO that exposes it. Column names and extra user-defined columns differ across versions and installations, so always confirm before using a query in production reporting.
Netray's ERPray answers questions over SyteLine read-only, shows the SQL it ran and respects your roles. If you are tired of maintaining a pile of one-off queries, it is worth a look.
Related Tools
SyteLine Job and Order Status Codes Reference
Look up what Planned, Firm Planned, Released, Stopped, Complete and the other SyteLine status codes mean and how they behave in planning and shipping.
Developer ToolsSyteLine IDO REST Request Generator
Fill in host, configuration, IDO, properties and filter to get ready-to-use REST calls for loading, updating and invoking methods on SyteLine IDOs.
Infor SyteLineSyteLine Item Import Worksheet
A staging sheet for item master data with computed first-buy value, ready to clean in the browser and export to Excel or CSV for loading.
Costing & FinanceSyteLine Month End Close Checklist
A step by step month end checklist for SyteLine users covering operational cut-off, subledger reconciliation, WIP, inventory and the general ledger.
More Developer Tools tools
See all- SyteLine SQL Blocking and Long Running Query Script Generator
- SyteLine Custom Table CREATE Script Generator
- SyteLine Mongoose Framework Events Reference
- SyteLine Event Action Types Reference
- SyteLine Event Action Parameter Functions Reference
- SyteLine WinStudio Standard Form Events Reference
- SyteLine Mongoose API Options Reference
- SyteLine SQL User-Defined Data Types Reference
- SyteLine IDO Extension Class Method Generator
New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- SyteLine Open Purchase Order Query GeneratorBuilds a read-only SQL query for open and late PO lines in SyteLine 9/10, with a second query for vendor on-time delivery from PO receipts.
- SyteLine Material Transaction History Query GeneratorBuild SQL Server queries over SyteLine material transactions for detail history, monthly usage by item and decoding the transaction codes in your data.
- Job Shop WIP and Late Jobs SQL Query GeneratorFill in your table and column names and get ready-to-run SQL for open jobs, late jobs and hours variance.
ERP fixes and how-tos
- Work order (job) item, status and routing tables in SyteLineWhere SyteLine stores work orders (jobs), routings, operations and materials: job, jobroute, jobmatl, jobtran tables, status values and sample SQL queries.
- SyteLine error: invalid site or item not valid at this siteWhy SyteLine rejects a transaction with an invalid site or item-not-at-site error, and the Item Sites, user site access, and warehouse setup checks that fix it.
- How to Build SQL Views for Custom SyteLine ReportingWhy custom SyteLine reports should read from purpose-built SQL views, not core tables directly, and how to build and place those views safely.
Guides
- A Practical Guide to SyteLine's Core SQL TablesA practical guide to the core SyteLine SQL tables, customer orders, lines, items, purchasing, jobs, their join paths, _mst conventions, and site_ref scoping for correct queries.
- SQL Query Optimization for SyteLine ReportingOptimize SQL queries against Infor SyteLine database tables. Index strategies for SL tables, query plan analysis, and performance tuning for SSRS reports.
- How to Set Up Item Master Defaults in Infor SyteLineStep-by-step guide to setting up item master defaults in Infor SyteLine. Configure default planning, costing, and inventory settings for new items.